Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

601 Eastern Ave

The City of Toronto has 12 building permits since 2017 (8 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Designated structure · Sign building permit related

    1 wall sign**Downtown Subaru**

    Applied Jun 11, 2025 · issued Jun 25, 2025 · completed Oct 21, 2025 · Permit 25 175574 DST

    Closed
  • Designated structure · Sign building permit related

    1 wall sign**DOWNTOWN SUBARU**

    Applied Jun 6, 2025 · completed Jun 10, 2025 · Permit 25 173042 DST

    Cancelled
  • Designated structure · Sign building permit related

    1 WALL SGN

    Applied Sep 6, 2024 · completed Sep 11, 2024 · Permit 24 209141 DST

    Cancelled
  • Drains and site services · Site service

    Revision 01 - Proposal to revise layout of proposed storm lines to suit site conditions.Site service alterations related to proposed showroom addition including re-locating 150mm Water Main serving existing Fire Hydrant. and a new 150mm Storm Drain serving downspout of proposed addition, plus installation of new Catch Basin and abandoning of existing Catch Basin.

    Applied Feb 10, 2015 · issued Mar 10, 2015 · Permit 14 257076 STS (revision 01)

    Revision issued
  • Drains and site services · Site service

    Site service alterations related to proposed showroom addition including re-locating 150mm Water Main serving existing Fire Hydrant. and a new 150mm Storm Drain serving downspout of proposed addition, plus installation of new Catch Basin and abandoning of existing Catch Basin.

    Applied Nov 26, 2014 · issued Nov 28, 2014 · Permit 14 257076 STS

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal for a one storey addition to the north east side of the building to a showroom for a car dealership "Subaru". Proposal includes HVAC and PLB.

    Applied Apr 4, 2014 · issued Nov 4, 2014 · Permit 14 138290 HVA

    Permit issued
  • Plumbing

    Plumbing - Proposal for a one storey addition to the north east side of the building to a showroom for a car dealership "Subaru". Proposal includes HVAC and PLB.

    Applied Apr 4, 2014 · issued Nov 4, 2014 · Permit 14 138290 PLB

    Inspections under way
  • Addition or alteration · Addition(s)

    Proposal for a one storey addition to the north east side of the building to a showroom for a car dealership "Subaru". Proposal includes HVAC and PLB.

    Applied Apr 4, 2014 · issued Nov 4, 2014 · Permit 14 138290 BLD

    Inspections under way
  • Addition or alteration · Addition(s)

    REVISION: to alter the foundations to a helical pier system to suit soil conditions.Proposal to construct a 1 storey addition to an existing 1 storey car dealership with auto repair service - Subaru

    Applied Mar 19, 2014 · issued Jun 18, 2014 · Permit 13 264901 BLD (revision 01)

    Revision issued
  • Addition or alteration · Addition(s)

    Proposal to construct a 1 storey addition to an existing 1 storey car dealership with vehicle service shop - Subaru

    Applied Nov 13, 2013 · issued Jan 23, 2014 · Permit 13 264901 BLD

    Inspections under way
  • Drains and site services

    Drain - Proposal to construct a 1 storey addition to an existing 1 storey car dealership with auto repair service - Subaru

    Applied Nov 13, 2013 · issued Jan 23, 2014 · Permit 13 264901 DRN

    Permit issued
  • Heating and ventilation

    HVAC - Proposal to construct a 1 storey addition to an existing 1 storey car dealership with auto repair service - Subaru

    Applied Nov 13, 2013 · issued Jan 23, 2014 · completed Jun 17, 2025 · Permit 13 264901 HVA

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 103 Morse St · Minor variance

    250 m away · filed Sep 16, 2026 · Accepted

  • 21 Carlaw Ave · Minor variance

    220 m away · filed Aug 25, 2026 · Postponed

  • 140 Carlaw Ave · Minor variance

    To alter the existing two-storey townhouse by reconstructing and enclosing the existing front porch with stairs.

    250 m away · filed Feb 24, 2026 · Application withdrawn

  • 42 Carlaw Ave · Consent

    To obtain consent to sever a portion of the land for the purpose of a lot addition.

    220 m away · filed Dec 2, 2025 · Approved

  • 555 Eastern Ave · Minor variance

    To alter the existing one-storey, four-unit, commercial building by converting Unit 1 (abutting Eastern Avenue and Heward Avenue) into a showroom and vehicle service shop (BMW). There will be a total of five car lifts and four motorcycle repair bays within this unit. Also, five vehicular parking spaces (including two accessible parking spaces) will be provided on-site.

    100 m away · filed Aug 18, 2025 · Approved

  • 46 Carlaw Ave · Consent

    To obtain consent to sever a portion of the land for the purpose of a lot addition.

    220 m away · filed Jan 20, 2025 · Approved

  • 42 Carlaw Ave · Consent

    To obtain consent to sever the lot into two undersized residential lots.

    220 m away · filed Jan 20, 2025 · Approved

  • 44 Carlaw Ave · Consent

    To obtain consent to sever a portion of the land for the purpose of a lot addition.

    220 m away · filed Jan 20, 2025 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.