Toronto address · Ward 3, Etobicoke-Lakeshore
63 Eastbourne Cres
The City of Toronto has 7 building permits since 2017 (5 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Small residential project · Multiple projects
REV02: changes as per drawings
Applied Aug 14, 2019 · issued Sep 18, 2019 · Permit 18 237110 BLD (revision 02)
- Closed
Heating and ventilation
HVAC - Revision to the heating plans do to the modification to extent to the 2nd floor
Applied Apr 1, 2019 · issued May 1, 2019 · completed Jan 10, 2020 · Permit 18 237110 HVA (revision 01)
- Revision issued
Small residential project · Multiple projects
Revision to the modification to extenet of the 2nd floor see bubbled area on the plans.
Applied Apr 1, 2019 · issued Apr 24, 2019 · Permit 18 237110 BLD (revision 01)
- Inspections under way
Small residential project · Multiple projects
Proposal to construct second storey addition (73m2) and interior alterations (61.59m2) to remaining second floor for existing single family detached dwelling. See related Zoning Certificate 18-199504.
Applied Oct 3, 2018 · issued Nov 2, 2018 · Permit 18 237110 BLD
- Inspections under way
Plumbing
Plumbing - Proposal to construct second storey addition (73m2) and interior alterations (61.59m2) to remaining second floor for existing single family detached dwelling. See related Zoning Certificate 18-199504.
Applied Oct 3, 2018 · issued Nov 2, 2018 · Permit 18 237110 PLB
- Closed
Heating and ventilation
HVAC - Proposal to construct second storey addition (73m2) and interior alterations (61.59m2) to remaining second floor for existing single family detached dwelling. See related Zoning Certificate 18-199504.
Applied Oct 3, 2018 · issued Nov 2, 2018 · completed Jan 10, 2020 · Permit 18 237110 HVA
- Inspections under way
Small residential project · Deck
Rear yard deck.
Applied Dec 6, 2006 · issued Dec 6, 2006 · Permit 06 196289 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a complete second storey addition.
Decision: Approved (hearing Jan 24, 2019)
Filed Nov 21, 2018 · File A0855/18EYK
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
18 Murrie St · Minor variance
To construct a two-storey rear addition to the existing dwelling.
230 m away · filed Jul 30, 2025 · Approved
21 Murrie St · Minor variance
To construct a new detached dwelling with an attached garage and a new rear yard deck.
220 m away · filed Jul 26, 2022 · Approved
24 Murrie St · Minor variance
To construct a second storey addition above the existing dwelling and a two-storey rear addition.
250 m away · filed Jul 20, 2022 · Approved
21 Dartmouth Cres · Minor variance
To construct a new detached dwelling with an attached garage.
130 m away · filed Mar 16, 2022 · Approved
24 Heman St · Consent
To obtain consent for technical severance of the property for the purpose of re-establishing two separate lots.
200 m away · filed Mar 7, 2022 · Approved
15 Albani St · Minor variance
To construct a new duplex with an attached garage.
180 m away · filed Oct 22, 2021 · Approved
21 Dartmouth Cres · Minor variance
To construct a new detached dwelling with an attached garage.
130 m away · filed May 1, 2021 · Refused
3 Dartmouth Cres · Minor variance
To construct a detached rear yard garage with an attached studio, a rear yard deck, a covered front porch, and a proposed front yard parking space. A previous Committee of Adjustment application (A81/14EYK) approved new dwelling variances related to floor space index, setbacks, length, roof and wall height and platforms.
220 m away · filed Apr 27, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.