Toronto address · Ward 23, Scarborough North
65 Gorsey Sq
The City of Toronto has 2 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Cancelled
Plumbing
Plumbing - Proposed basement second suite, Proposed 2 enlarged window in basement
Applied May 11, 2023 · completed Jun 6, 2023 · Permit 23 144293 PLB
- Cancelled
Small residential project · Second suite (New)
Proposed basement second suite, Proposed 2 enlarged window in basement
Applied May 11, 2023 · completed Jun 6, 2023 · 1 home added · Permit 23 144293 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
73 Griffen Dr · Minor variance
To alter the existing one-storey detached dwelling by constructing a partial side (north) two-storey addition, a full rear two-storey addition, a rear ground floor deck and a rear basement walkout. Also, to construct a new attached garage to the side (north) of the existing dwelling. The existing sunroom, carport, deck and shed will be demolished. There will be a total of two dwelling units on the lot. NOTE: This application was previously deferred at the Committee of Adjustment Hearing on April 9, 2025.
150 m away · filed Jan 15, 2025 · Approved
54 Gorsey Sq · Minor variance
To maintain the existing two-storey dwelling on 54 Gorsey Square (Part 1).
90 m away · filed Sep 4, 2018 · Application withdrawn
54 Gorsey Sq · Minor variance
To construct a new two-storey dwelling on a new lot (Part 2) with frontage on Washburn Way.
90 m away · filed Sep 4, 2018 · Application withdrawn
54 Gorsey Sq · Consent
To obtain consent to sever the property into two (2) undersized residential lots.
90 m away · filed Sep 4, 2018 · Application withdrawn
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.