Toronto address · Ward 3, Etobicoke-Lakeshore
66 Brentwood Rd S
The City of Toronto has 7 building permits since 2017 (2 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Small residential project · Other
13.6 kW of solar PV panels (40 340 Watt panels) will be installed on the rooftop. A 10 kW AC/DC inverter will be installed on the side of the house as per Toronto Hydro drawings.
Applied Jul 31, 2023 · issued Sep 19, 2023 · Permit 23 182211 BLD
- Closed
Heating and ventilation
HVAC - Proposal to demolish the existing house and construct a new detached two storey dwelling with integral garage and finished basement.
Applied Mar 14, 2023 · issued Apr 3, 2023 · completed Mar 7, 2024 · Permit 22 193110 HVA
- Closed
Plumbing
Plumbing - Proposal to demolish the existing house and construct a new detached two storey dwelling with integral garage and finished basement.
Applied Aug 19, 2022 · issued Oct 6, 2022 · completed Mar 7, 2024 · Permit 22 193110 PLB
- Inspections under way
New house · New building
Proposal to demolish the existing house and construct a new detached two storey dwelling with integral garage and finished basement.
Applied Aug 19, 2022 · issued Oct 6, 2022 · 1 home added · Permit 22 193110 BLD
- Closed
Drains and site services
Drain - Proposal to demolish the existing house and construct a new detached two storey dwelling with integral garage and finished basement.
Applied Aug 19, 2022 · issued Oct 6, 2022 · completed Mar 7, 2024 · Permit 22 193110 DRN
- Closed
Demolition
Proposal to demolish the existing house and construct a new detached two storey dwelling with integral garage and finished basement.
Applied Aug 19, 2022 · issued Oct 6, 2022 · completed Jan 26, 2023 · 1 home removed · Permit 22 193136 DEM
- Closed
Small residential project · Interior alterations
Int. Alts. To single family dwelling
Applied Mar 25, 1998 · issued Apr 15, 1998 · completed Jan 26, 2023 · Permit 98 083533 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · New R building
To construct a new detached dwelling with an attached garage.
Decision: Approved (hearing Jul 14, 2022)
Filed Apr 2, 2022 · File A0216/22EYK
What’s planned nearby
Development sites within 500 m
- Under review
4-8 Montgomery Road and 3100-3200 Bloor Street West
13 storeys · 319 homes · Mixed use
350 m away · Condominium · Under review · filed Oct 22, 2021
Neighbours’ Committee of Adjustment files within 250 m
74 Brentwood Rd S · Minor variance
To construct a new rear deck with a second storey addition above.
50 m away · filed Apr 20, 2026 · Approved
32 Orchard Cres · Minor variance
To convert the existing attached garage into habitable space.
230 m away · filed Apr 17, 2026 · Approved
95 Thompson Ave · Minor variance
To construct a second storey addition above the existing dwelling and a new one-storey front addition.
190 m away · filed Sep 16, 2025 · Approved
44 Cliveden Ave · Minor variance
To demolish the existing detached garage in the rear yard and to construct a storage shed in the rear yard.
130 m away · filed Aug 21, 2025 · Approved
48 Thompson Ave · Minor variance
To construct a two-storey rear and south side addition, and a deck in the rear yard.
130 m away · filed Jul 24, 2025 · Approved
73 Thompson Ave · Minor variance
To construct a new detached dwelling with an attached garage.
40 m away · filed Dec 3, 2024 · Approved
74 Meadowvale Dr · Minor variance
To construct a new detached dwelling with an attached garage.
130 m away · filed Oct 21, 2024 · Approved
75 Meadowvale Dr · Minor variance
To maintain the existing dwelling.
120 m away · filed Sep 4, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.