Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

66 West Ave

The City of Toronto has 5 building permits since 2017 (1 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Revision to plumbing - identifying existing areas that were previously missed, basement laundry room, bar sink on second floor, room changes

    Applied Jul 30, 2020 · issued Aug 4, 2020 · completed Jun 3, 2026 · Permit 20 101860 PLB (revision 01)

    Closed
  • Small residential project · Interior alterations

    Revision - identifying existing areas that were previously missed, basement laundry room, bar sink on second floor, room changes

    Applied Jul 30, 2020 · issued Oct 14, 2020 · completed Jul 22, 2026 · Permit 20 101860 BLD (revision 01)

    Closed
  • Plumbing

    Plumbing - Proposed interior alterations to existing detached dwelling.

    Applied Jan 7, 2020 · issued Jan 16, 2020 · completed Jun 3, 2026 · Permit 20 101860 PLB

    Closed
  • Small residential project · Interior alterations

    Proposed interior alterations to existing detached dwelling.

    Applied Jan 7, 2020 · issued Jan 16, 2020 · completed Jul 22, 2026 · Permit 20 101860 BLD

    Closed
  • Plumbing · Fixtures/Roof Drains: SFD

    Proposal to change ground floor bathroom fixtures (water closet, wash basin, & bath tub) in existing detached single family dwelling.

    Applied Mar 31, 2015 · issued Mar 31, 2015 · Permit 15 134508 PSA

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 195 De Grassi St · Minor variance

    To legalize and to maintain the existing rear ground floor L-shaped deck with stairs, and a rear third floor rooftop deck (including a hot tub and a shower). This was all constructed without an authorized building permit, to the existing three-storey semi-detached dwelling.

    80 m away · filed May 20, 2026 · Approved

  • 162 Boulton Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition and a side (south) third floor balcony.

    200 m away · filed Apr 17, 2026 · Approved

  • 242 Boulton Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by enclosing the existing front porch (for habitable space).

    220 m away · filed Sep 8, 2025 · Approved

  • 183 First Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a west side third storey addition.

    130 m away · filed Sep 18, 2023 · Approved

  • 1000 Dundas St E · Minor variance

    To alter the existing two-and-a-half storey townhouse by constructing a front third storey addition.

    120 m away · filed Sep 15, 2023 · Approved

  • 70 Allen Ave · Minor variance

    To construct a new three-storey semi-detached dwelling with a front porch with stairs and a rear third storey deck.

    250 m away · filed May 24, 2023 · Approved

  • 70 Allen Ave · Consent

    To obtain consent to sever an existing residential lot into two undersized residential lots.

    250 m away · filed May 24, 2023 · Approved

  • 70 Allen Ave · Minor variance

    To construct a new three-storey semi-detached dwelling with a front porch with stairs and a rear third storey deck.

    250 m away · filed May 24, 2023 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.