Toronto address · Ward 3, Etobicoke-Lakeshore
68 Daisy Ave
The City of Toronto has 31 building permits since 2017 (6 still open) and 3 Committee of Adjustment files on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services · Site service
Revision #01 - Changes to water servicing for block A & B for ministry requirement for separation of water and sewers.Site services for proposed 73 unit townhouse development, consisting of 5 individual blocks. New storm, sanitary domestic/fire water connections.
Applied Feb 5, 2020 · issued Mar 3, 2022 · completed Nov 18, 2022 · Permit 18 196830 STS (revision 01)
- Closed
Heating and ventilation
Revision 01: changes to the method of heating and ventilation for the common garageHVAC - Proposal to construct 14 four-storey townhomes as part of Block C of a 5 block residential development.
Applied Feb 3, 2020 · issued Feb 10, 2020 · completed Nov 25, 2021 · Permit 18 196409 HVA (revision 01)
- Closed
Heating and ventilation
Revision 01: changes to the method of heating and ventilation for the common garageHVAC - Proposal to construct 14 four-storey townhomes as part of Block E of a 5 block residential development.
Applied Feb 3, 2020 · issued Feb 10, 2020 · completed Nov 25, 2021 · Permit 18 196523 HVA (revision 01)
- Closed
Heating and ventilation
Revision 01: changes to the method of heating and ventilation for the common garageHVAC - Proposal to construct 14 four-storey townhomes as part of Block D of a 5 block residential development.
Applied Feb 3, 2020 · issued Feb 10, 2020 · completed Nov 25, 2021 · Permit 18 196487 HVA (revision 01)
- Revision issued
New building
Revision 01: revision to the method of insulation from batt to spray foam. Proposal to construct 15 four-storey freehold townhomes each with attached garage "BLOCK A"
Applied Dec 19, 2019 · issued Feb 10, 2020 · Permit 18 196183 BLD (revision 01)
- Closed
New building
Revision 01: revision to the method of insulation from batt to spray foamProposal to construct 16 four-storey freehold townhomes with attached garage "BLOCK B"
Applied Dec 19, 2019 · issued Feb 10, 2020 · completed Nov 30, 2021 · Permit 18 196248 BLD (revision 01)
- Refused
Alternative solution
Proposal for a compensating measure for incorporating a fire alarm system within a building as identified in OBC sentence 3.2.4.1.(2) by using sprinklers for providing detection throughout the townhouse block, and the sprinkler system is equipped with electrical supervision through the security monitor panel. The security panel is supervised by an off site monitoring station what will provide direct notification to the fire department.
Applied May 24, 2019 · completed Jul 24, 2019 · Permit 19 158850 ALT
- Refused
Alternative solution
Proposal for a compensating measure for incorporating a fire alarm system within a building as identified in OBC sentence 3.2.4.1.(2) by using sprinklers for providing detection throughout the townhouse block, and the sprinkler system is equipped with electrical supervision through the security monitor panel. The security panel is supervised by an off site monitoring station what will provide direct notification to the fire department.
Applied May 24, 2019 · completed Jul 24, 2019 · Permit 19 158854 ALT
- Approved
Alternative solution
Compensating measures for vestibules required between the above grade parking garage, additional storey of interior egress / exiting travel distance from within the 3rd and 4th floor levels of the dwelling units, for the occupied roof level (block c, d & e) fire separations required within each dwelling unit, for incorporating standpipe and hose systems complete and achieving the protection of exit facilities requirements as identified in obc sentence 3.2.3.13.(1).
Applied Oct 24, 2018 · completed Oct 29, 2018 · Permit 18 247259 ALT
- Approved
Alternative solution
Compensating measures for vestibules required between the above grade parking garage, additional storey of interior egress / exiting travel distance from within the 3rd and 4th floor levels of the dwelling units, for the occupied roof level (block c, d & e) fire separations required within each dwelling unit, for incorporating standpipe and hose systems complete and achieving the protection of exit facilities requirements as identified in obc sentence 3.2.3.13.(1).
Applied Oct 24, 2018 · completed Oct 29, 2018 · Permit 18 247258 ALT
- Approved
Alternative solution
Compensating measures for vestibules required between the above grade parking garage, additional storey of interior egress / exiting travel distance from within the 3rd and 4th floor levels of the dwelling units, for the 4th floor (block a & b) fire separations required within each dwelling unit, for incorporating standpipe and hose systems complete and achieving the protection of exit facilities requirements as identified in obc sentence 3.2.3.13.(1).
Applied Oct 24, 2018 · completed Aug 6, 2019 · Permit 18 247256 ALT
- Approved
Alternative solution
Compensating measures for vestibules required between the above grade parking garage, additional storey of interior egress / exiting travel distance from within the 3rd and 4th floor levels of the dwelling units, for the occupied roof level (block c, d & e) fire separations required within each dwelling unit, for incorporating standpipe and hose systems complete and achieving the protection of exit facilities requirements as identified in obc sentence 3.2.3.13.(1).
Applied Oct 24, 2018 · completed Oct 29, 2018 · Permit 18 247257 ALT
Show 19 more permits
- Approved
Alternative solution
Compensating measures for vestibules required between the above grade parking garage, additional storey of interior egress / exiting travel distance from within the 3rd and 4th floor levels of the dwelling units, for the 4th floor (block a & b) fire separations required within each dwelling unit, for incorporating standpipe and hose systems complete and achieving the protection of exit facilities requirements as identified in obc sentence 3.2.3.13.(1).
Applied Sep 18, 2018 · completed Aug 1, 2019 · Permit 18 227245 ALT
- Closed
Plumbing
Plumbing - Proposal to construct 14 four-storey townhomes as part of Block E of a 5 block residential development.
Applied Jul 19, 2018 · issued Oct 31, 2018 · completed Nov 26, 2021 · Permit 18 196523 PLB
- Closed
New building
Proposal to construct 14 four-storey freehold townhomes with attached garage "BLOCK C"
Applied Jul 19, 2018 · issued Apr 26, 2019 · completed Nov 30, 2021 · 14 homes added · Permit 18 196409 BLD
- Closed
Heating and ventilation
HVAC - Proposal to construct 14 four-storey townhomes as part of Block E of a 5 block residential development.
Applied Jul 19, 2018 · issued Dec 17, 2018 · completed Nov 25, 2021 · Permit 18 196523 HVA
- Closed
Heating and ventilation
HVAC - Proposal to construct 14 four-storey townhomes as part of Block D of a 5 block residential development.
Applied Jul 19, 2018 · issued Dec 17, 2018 · completed Nov 25, 2021 · Permit 18 196487 HVA
- Closed
Heating and ventilation
HVAC - Proposal to construct 14 four-storey townhomes as part of Block C of a 5 block residential development.
Applied Jul 19, 2018 · issued Dec 17, 2018 · completed Nov 25, 2021 · Permit 18 196409 HVA
- Closed
New building
Proposal to construct 14 four-storey townhomes as part of Block E of a 5 block residential development.
Applied Jul 19, 2018 · issued Apr 26, 2019 · completed Nov 30, 2021 · 14 homes added · Permit 18 196523 BLD
- Closed
Plumbing
Plumbing - Proposal to construct 14 four-storey townhomes as part of Block C of a 5 block residential development.
Applied Jul 19, 2018 · issued Oct 31, 2018 · completed Nov 26, 2021 · Permit 18 196409 PLB
- Closed
Plumbing
Plumbing - Proposal to construct 14 four-storey townhomes as part of Block D of a 5 block residential development.
Applied Jul 19, 2018 · issued Oct 31, 2018 · completed Nov 26, 2021 · Permit 18 196487 PLB
- Closed
Drains and site services · Site service
Site services for proposed 73 unit townhouse development, consisting of 5 individual blocks. New storm, sanitary domestic/fire water connections.
Applied Jul 19, 2018 · issued Jan 25, 2019 · completed Nov 18, 2022 · Permit 18 196830 STS
- Closed
New building
Proposal to construct 14 four-storey freehold townhomes with attached garage"BLOCK D"
Applied Jul 19, 2018 · issued Apr 26, 2019 · completed Nov 30, 2021 · 14 homes added · Permit 18 196487 BLD
- Closed
Plumbing
Plumbing - Proposal to construct 16 four-storey townhomes as part of Block B of a 5 block residential development.
Applied Jul 18, 2018 · issued Oct 31, 2018 · completed Nov 26, 2021 · Permit 18 196248 PLB
- Closed
Plumbing
Plumbing - Proposal to construct 15 four-storey townhomes as part of Block A of a 5 block residential development.
Applied Jul 18, 2018 · issued Oct 31, 2018 · completed Nov 26, 2021 · Permit 18 196183 PLB
- Closed
New building
Proposal to construct 15 four-storey freehold townhomes each with attached garage "BLOCK A"
Applied Jul 18, 2018 · issued Jul 18, 2019 · completed Nov 30, 2021 · 15 homes added · Permit 18 196183 BLD
- Closed
New building
Proposal to construct 16 four-storey freehold townhomes with attached garage "BLOCK B"
Applied Jul 18, 2018 · issued Apr 26, 2019 · completed Nov 30, 2021 · 16 homes added · Permit 18 196248 BLD
- Closed
Heating and ventilation
HVAC - Proposal to construct 16 four-storey townhomes as part of Block B of a 5 block residential development.
Applied Jul 18, 2018 · issued Dec 5, 2018 · completed Nov 25, 2021 · Permit 18 196248 HVA
- Closed
Heating and ventilation
HVAC - Proposal to construct 15 four-storey townhomes as part of Block A of a 5 block residential development.
Applied Jul 18, 2018 · issued Dec 4, 2018 · completed Nov 25, 2021 · Permit 18 196183 HVA
- Closed
Demolition
Proposal to demolish one-storey west portion of the building at 68 Daisy Avenue. The remaining portion of the building will continue to operate as a daycare facility.
Applied Jun 26, 2017 · issued Jul 24, 2017 · completed Oct 13, 2017 · Permit 17 187548 DEM
- Closed
Designated structure · Sign building permit related
To erect and display two non illuminated ground signs displaying static copy, both of which are to contain two sign faces, displayed in a v-shape and measuring 4.88 m by 3.66 m at a height of 4.57 m. ** Dunparhomes.com**
Applied Oct 27, 2016 · issued Nov 17, 2016 · completed Feb 16, 2017 · Permit 16 242876 DST
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Consent · Create new Easement/ROW
To obtain consent to create various easements/right-of-ways.
Decision: Approved (hearing Oct 25, 2018)
Filed Aug 23, 2018 · File B0073/18EYK
- Closed
Consent · Create new Easement/ROW
To obtain consent to create various easements/right-of-ways.
Decision: Approved (hearing Oct 25, 2018)
Filed Aug 16, 2018 · File B0068/18EYK
- Closed
Consent · Sever lot
To obtain consent to sever the property into three lots and to create an easement/right-of-way for the purpose of vehicular and pedestrian access.
Decision: Approved (hearing Jan 11, 2018)
Filed Oct 4, 2017 · File B0086/17EYK
What’s planned nearby
Development sites within 500 m
- Approved
- Under review
3471 Lake Shore Boulevard West
6 storeys · Residential
360 m away · Site plan · Under review · filed Nov 8, 2022
- Under review
4 storeys · Residential
370 m away · Site plan · Under review · filed Nov 8, 2022
Neighbours’ Committee of Adjustment files within 250 m
86 Laburnham Ave · Minor variance
To construct a new detached dwelling with an attached garage and a secondary suite.
190 m away · filed Jan 8, 2026 · Approved
86 Laburnham Ave · Consent
To obtain consent to sever the property into two undersized residential lots.
190 m away · filed Jan 8, 2026 · Approved
86 Laburnham Ave · Minor variance
To construct a new detached dwelling with an attached garage and a secondary suite.
190 m away · filed Jan 8, 2026 · Approved
34 Fairfield Ave · Minor variance
To construct a new detached dwelling with an attached garage.
210 m away · filed Sep 24, 2025 · Approved
34 Fairfield Ave · Minor variance
To construct a new detached dwelling with an attached garage.
210 m away · filed Sep 24, 2025 · Approved
34 Fairfield Ave · Consent
To obtain consent to sever the lot into two undersized residential lots.
210 m away · filed Sep 24, 2025 · Approved
35 Laburnham Ave · Minor variance
To construct a new semi-detached fourplex.
220 m away · filed Jun 3, 2025 · Approved
35 Laburnham Ave · Consent
To obtain consent to sever the property into two undersized residential lots.
220 m away · filed Jun 3, 2025 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.