Toronto address · Ward 14, Toronto-Danforth
69 Lamb Ave
The City of Toronto has 4 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Multiple projects
Revision 01. Removal of Bedroom at Basement.Proposal for finish basement and basement underpinning
Applied Apr 11, 2023 · issued May 8, 2023 · completed Mar 14, 2024 · Permit 22 231575 BLD (revision 01)
- Closed
Plumbing
Plumbing - Proposal for finish basement and basement underpinning
Applied Nov 21, 2022 · issued Dec 2, 2022 · completed May 4, 2023 · Permit 22 231575 PLB
- Closed
Small residential project · Multiple projects
Proposal for finish basement and basement underpinning
Applied Nov 21, 2022 · issued Dec 2, 2022 · completed Mar 14, 2024 · Permit 22 231575 BLD
- Closed
Drains and site services · Back water valve (Sewer only)
Proposal to install back water valve
Applied Apr 9, 2018 · issued Apr 9, 2018 · completed Apr 13, 2018 · Permit 18 140249 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
14 storeys · 81 homes · Mixed use
490 m away · Site plan · Approved · filed Oct 1, 2024
Neighbours’ Committee of Adjustment files within 250 m
16 Lamb Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear first floor addition and a rear third storey addition with a rear roof deck. Also, to construct a new one-storey ancillary building (detached garage with storage/workshop space) in the rear yard, abutting the public laneway. The existing ancillary building (shed) in the rear yard will be demolished.
120 m away · filed Apr 14, 2026 · Approved
133 Lamb Ave · Minor variance
To construct a new one-storey detached ancillary building (one-car garage) in the rear yard, abutting the laneway.
140 m away · filed Nov 19, 2025 · Approved
167 Gillard Ave · Minor variance
To construct a new one-storey detached ancillary building (one-car garage) in the rear yard of the existing two-storey dwelling, abutting Mountjoy Avenue.
100 m away · filed Apr 8, 2025 · Approved
80 Lamb Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition with a rear ground level deck and stairs, and a rear second storey balcony. Also, to construct a new two-storey ancillary building containing one laneway suite with a rear second storey balcony, and a rooftop equipment area, in the rear yard, abutting the laneway. There will be a total of two residential dwelling units (one unit within the main dwelling and one unit within the ancillary building) on this lot.
50 m away · filed Mar 21, 2025 · Approved
153 Gillard Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a new rear one-storey addition (with new basement extension below). The existing one-storey addition will be demolished.
90 m away · filed Aug 29, 2024 · Approved
1275 Danforth Ave · Minor variance
To alter the existing four-storey apartment building by constructing four accessible parking spaces at the ground level, two accessible barrier-free underground parking spaces, and a roundabout drop off area. A total of seven lawful parking spaces will be removed.
180 m away · filed Aug 14, 2024 · Approved
133 Lamb Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear second storey addition. Also, to permit the enclosed front porch, which was constructed without an authorized building permit.
140 m away · filed Sep 28, 2023 · Approved
131 Lamb Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a cantilevered rear second storey addition.
140 m away · filed Sep 8, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.