Toronto address · Ward 19, Beaches-East York
69 Spruce Hill Rd
The City of Toronto has 4 building permits since 2017 (4 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Heating and ventilation
Hvac - in basement
Applied Oct 4, 2002 · issued Nov 25, 2002 · Permit 02 150473 HVA
- Inspections under way
Plumbing
Plumbing -install fixtures - Bsmt: 1 shower, 1 wb, 1 wc, 1 laundry tub. On 1st fl: 1 wb, 1 wc. (NO PLANS) Cost included in BP02-150473(990)
Applied Oct 4, 2002 · issued Oct 4, 2002 · Permit 02 150473 PLB
- Inspections under way
Small residential project · Multiple projects
alter plan as approved by constructing 2nd storey addition at rear; underpin & repairing of existing foundation walls
Applied Oct 1, 2002 · issued Oct 25, 2002 · Permit 02 150473 BLD (revision 01)
- Inspections under way
Small residential project · Multiple projects
Build one-storey and basement addition at rear; build an uncovered platform for the first floor also to the rear; make interior alterations.
Applied Jun 25, 2002 · issued Jun 25, 2002 · Permit 02 150473 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
153 Willow Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear ground floor deck and a rear second floor deck.
210 m away · filed Oct 30, 2024 · Approved
97 Spruce Hill Rd · Minor variance
To construct a new two-storey ancillary building (containing a one-car garage, and one laneway suite), in the rear yard, abutting the laneway. The existing shed will be demolished.
80 m away · filed May 6, 2024 · Approved
155 Maclean Ave · Minor variance
To construct a new one-and-one-half-storey ancillary building (detached garage) in the rear yard. The existing semi-detached ancillary building (garage) will be demolished.
190 m away · filed Sep 8, 2023 · Approved
20 Crown Park Rd · Minor variance
To alter the existing three-storey detached dwelling by constructing second and third storey additions and a new covered porch (flanking the side and rear). Also, to construct an ancillary structure (covered lounge) and an in-ground swimming pool in the rear yard.
240 m away · filed Nov 18, 2022 · Approved
157 Maclean Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing rear one-storey and two-storey additions, a front porch with stairs, and a rear yard pergola. Also, to construct a one-storey ancillary building (detached garage) in the rear yard.
190 m away · filed Nov 4, 2022 · Approved
4 Pine Ter · Minor variance
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a third storey addition (dormer).
140 m away · filed Sep 27, 2022 · Approved
132 Willow Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a second storey addition above the rear one-storey portion of the dwelling. Also, to construct a new one-storey ancillary building (detached two-car garage) in the rear yard, abutting the laneway.
220 m away · filed Jul 6, 2022 · Approved
185 Beech Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition with a deck.
140 m away · filed Mar 23, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.