Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

7 Fourteenth St

The City of Toronto has 4 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposal for multiple projects to an existing 2 storey SFD-detached dwelling. Scope of work includes a 2 storey side addition and 2nd-storey front addition, interior alterations and a rear deck.

    Applied Nov 10, 2017 · issued Nov 13, 2017 · completed Sep 4, 2025 · Permit 16 200471 HVA

    Closed
  • Small residential project · Multiple projects

    Rev 01 - Revision to basement plan to add steel beams and roof plan to add roof trusses. Proposal for multiple projects to an existing 2 storey SFD-detached dwelling. Scope of work includes a 2 storey side addition and 2nd-storey front addition, interior alterations and a rear deck.

    Applied Oct 12, 2017 · issued Nov 2, 2017 · completed Sep 4, 2025 · Permit 16 200471 BLD (revision 01)

    Closed
  • Plumbing

    Plumbing - Proposal for multiple projects to an existing 2 storey SFD-detached dwelling. Scope of work includes a 2 storey side addition and 2nd-storey front addition, interior alterations and a rear deck.

    Applied Oct 10, 2017 · issued Oct 11, 2017 · completed Jan 25, 2018 · Permit 16 200471 PLB

    Closed
  • Small residential project · Multiple projects

    Proposal for multiple projects to an existing 2 storey SFD-detached dwelling. Scope of work includes a 2 storey side addition and 2nd-storey front addition, interior alterations and a rear deck.

    Applied Aug 3, 2016 · issued Mar 9, 2017 · completed Sep 4, 2025 · Permit 16 200471 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To construct a two-storey south side addition and a second storey front addition.

    Decision: Approved (hearing Feb 9, 2017)

    Filed Dec 20, 2016 · File A0971/16EYK

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 7 Sixteenth St · Minor variance

    To construct a new fourplex, and a garden suite.

    190 m away · filed Jul 13, 2026 · Approved

  • 99 Thirteenth St · Minor variance

    To construct a new detached dwelling with an attached garage. A previous Committee of Adjustment application (A0036/23EYK) approved variances related to floor space index and exterior main wall height.

    240 m away · filed Feb 5, 2026 · Approved

  • 48 Sixteenth St · Consent

    To obtain consent to sever the lot into two residential lots.

    240 m away · filed Aug 20, 2024 · Approved

  • 48 Sixteenth St · Minor variance

    To construct a new detached dwelling with an attached garage, and a deck in the rear yard.

    240 m away · filed Aug 20, 2024 · Approved

  • 48 Sixteenth St · Minor variance

    To construct a new detached dwelling with an attached garage, and a deck in the rear yard.

    240 m away · filed Aug 20, 2024 · Approved

  • 23 Sixteenth St · Minor variance

    To construct a new detached dwelling with an attached garage.

    180 m away · filed Nov 28, 2023 · Approved

  • 39 Fifteenth St · Minor variance

    To construct a new triplex dwelling and a new garden suite in the rear yard.

    110 m away · filed Oct 6, 2023 · Approved

  • 21 Sixteenth St · Minor variance

    To construct a new detached dwelling with an attached garage.

    190 m away · filed Apr 4, 2023 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.