Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

70 Birmingham St

The City of Toronto has 25 building permits since 2017 (19 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    REVISION01: Revision to 23 209632 PLB 00 PSAlteration to provide trap guard to unprimed drain trap.Plumbing - This application is to perform interior alteration to existing: wall partitions, ceiling, plumbing systems and HVAC.

    Applied Oct 28, 2024 · issued Nov 6, 2024 · completed Nov 15, 2024 · Permit 23 209632 PLB (revision 01)

    Closed
  • Plumbing

    Plumbing - This application is to perform interior alteration to existing: wall partitions, ceiling, plumbing systems and HVAC.

    Applied Dec 6, 2023 · issued Dec 13, 2023 · completed Nov 15, 2024 · Permit 23 209632 PLB

    Closed
  • Addition or alteration · Interior alterations

    This application is to perform interior alteration to existing: wall partitions, ceiling, plumbing systems and HVAC.

    Applied Oct 2, 2023 · issued Nov 24, 2023 · Permit 23 209632 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - This application is to perform interior alteration to existing: wall partitions, ceiling, plumbing systems and HVAC.

    Applied Oct 2, 2023 · issued Nov 24, 2023 · Permit 23 209632 HVA

    Inspections under way
  • Heating and ventilation

    Revision 01: HVAC - Proposal for revise accessibility upgrades.HVAC - Proposal for complete accessibility upgrades.

    Applied Apr 20, 2023 · issued Jun 12, 2023 · Permit 21 197475 HVA (revision 01)

    Revision issued
  • Addition or alteration · Multiple projects

    Revision 01; Proposal to revise accessibility upgradesProposal for complete accessibility upgrades.

    Applied Mar 14, 2023 · issued Apr 18, 2023 · Permit 21 197475 BLD (revision 01)

    Revision issued
  • Plumbing

    Revision 01; Proposal to revise accessibility upgradesPlumbing - Proposal for complete accessibility upgrades.

    Applied Mar 14, 2023 · issued Apr 20, 2023 · Permit 21 197475 PLB (revision 01)

    Revision issued
  • Plumbing

    Plumbing - Proposal for complete accessibility upgrades.

    Applied Aug 12, 2021 · issued Oct 12, 2021 · Permit 21 197475 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal for complete accessibility upgrades.

    Applied Aug 12, 2021 · issued Oct 12, 2021 · Permit 21 197475 HVA

    Inspections under way
  • Addition or alteration · Multiple projects

    Proposal for complete accessibility upgrades.

    Applied Aug 12, 2021 · issued Sep 14, 2021 · Permit 21 197475 BLD

    Inspections under way
  • Designated structure · Solar collector

    Proposed additional ballast added to existing solar array on the roof of an existing policy training facility.

    Applied Jul 8, 2020 · issued Aug 11, 2020 · completed Jan 15, 2021 · Permit 20 164737 DST

    Closed
  • Designated structure · Solar collector

    Installation of ballasted rooftop solar array

    Applied Oct 24, 2016 · issued Nov 2, 2016 · completed Dec 18, 2017 · Permit 16 241960 DST

    Closed
Show 13 more permits
  • Plumbing · Backflow prevention devices (Water only)

    Propsoed installation of backflow prevention device.

    Applied Aug 21, 2015 · issued Sep 3, 2015 · Permit 15 210929 PSA

    Inspections under way
  • Fire and security upgrade · Electromagnetic locks

    Install 2 mag locks for the Toronto Police College

    Applied Jun 18, 2015 · Permit 15 176390 FSU

    Under review
  • Fire and security upgrade · Electromagnetic locks

    Installation of 30 Electro - Magnetic Locks within the new Police Station Facility.

    Applied Mar 31, 2009 · issued Apr 28, 2009 · Permit 09 121924 FSU

    Inspections under way
  • New building

    **REVISION: To add raised platform within the building, add generator pad, and install kitchen/servery equipment.** To construct a new one and two storey police training facility; buildings connected below grade

    Applied Oct 30, 2008 · issued Dec 23, 2008 · completed Aug 21, 2026 · Permit 06 190016 BLD (revision 01)

    Closed
  • Heating and ventilation

    **REVISION: To add kitchen/servery equipment** HVAC - To construct a new one and two storey police training facility; buildings connected below grade

    Applied Oct 30, 2008 · issued Dec 23, 2008 · Permit 06 190016 HVA (revision 01)

    Revision issued
  • Plumbing

    **REVISION: To add kitchen/servery equipment** Plumbing - To construct a new one and two storey police training facility; buildings connected below grade

    Applied Oct 30, 2008 · issued Dec 23, 2008 · Permit 06 190016 PLB (revision 01)

    Revision issued
  • Drains and site services · Site service

    Site services to police training facility**REVISION - minor changes to piping location.**

    Applied Dec 17, 2007 · issued Jan 30, 2008 · Permit 06 181720 STS (revision 02)

    Revision issued
  • Plumbing

    Plumbing - To construct a new one and two storey police training facility; buildings connected below grade

    Applied May 25, 2007 · issued Jan 22, 2008 · Permit 06 190016 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - To construct a new one and two storey police training facility; buildings connected below grade

    Applied May 25, 2007 · issued Jan 22, 2008 · Permit 06 190016 HVA

    Inspections under way
  • Drains and site services

    Foundation Drain - To construct a new one and two storey police training facility; buildings connected below grade

    Applied May 16, 2007 · issued May 25, 2007 · Permit 06 190016 DRN

    Inspections under way
  • Drains and site services · Site service

    Site services to police training facility**REVISION - sewer connection and additional sewer service.**

    Applied May 1, 2007 · issued May 18, 2007 · Permit 06 181720 STS (revision 01)

    Revision issued
  • New building

    To construct a new one and two storey police training facility; buildings connected below grade

    Applied Nov 8, 2006 · issued Jan 22, 2008 · completed Aug 21, 2026 · Permit 06 190016 BLD

    Closed
  • Drains and site services · Site service

    Site services to police training facility

    Applied Oct 5, 2006 · issued Feb 9, 2007 · Permit 06 181720 STS

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 145 Fourth St · Minor variance

    To construct a second storey addition above the existing dwelling.

    160 m away · filed Sep 12, 2025 · Approved

  • 140 Fourth St · Minor variance

    To construct a new ancillary building (detached garage) in the rear yard.

    180 m away · filed Apr 25, 2025 · Approved

  • 273 Sixth St · Minor variance

    To construct a third storey rear addition.

    220 m away · filed May 21, 2024 · Approved

  • 168 Fifth St · Minor variance

    To construct a new detached dwelling with an attached garage.

    170 m away · filed Feb 5, 2024 · Approved

  • 95 Third St · Minor variance

    To construct a partial second-storey addition above the existing dwelling.

    250 m away · filed Jan 23, 2024 · Approved

  • 277 Sixth St · Minor variance

    To construct a new two-storey rear yard addition and a new second storey rear addition above the existing dwelling.

    240 m away · filed Jun 26, 2023 · Approved

  • 168 Fifth St · Minor variance

    To construct a new detached dwelling.

    170 m away · filed Jan 3, 2023 · Approved

  • 172 Fifth St · Minor variance

    To construct a two-storey rear addition. A previous Committee of Adjustment application (A0626/21EYK) approved variances relating to floor space index, side yard setback and roof eaves.

    160 m away · filed Dec 1, 2022 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.