Toronto address · Ward 9, Davenport
70 Shanly St
The City of Toronto has 2 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Plumbing
1 sink and 1 dishwasher- 01-156505 Cost included
Applied Jul 26, 2001 · issued Jul 26, 2001 · completed Jan 6, 2017 · Permit 01 162532 PLB
- Closed
Addition or alteration · Addition(s)
One storey addition at rear
Applied Jul 10, 2001 · issued Jul 10, 2001 · completed Jan 6, 2017 · Permit 01 156505 000
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
- Approved
Neighbours’ Committee of Adjustment files within 250 m
800 Dovercourt Rd · Consent
To obtain consent for the technical severance of the property for the purpose of re-establishing two residential lots which merged on title.
220 m away · filed Jul 13, 2026 · Hearing scheduled
91 Salem Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a new front one-storey addition with stairs, a front basement walkout, and a rear one-storey addition with a wood landing. The existing rear ground floor deck will be maintained and unaltered.
100 m away · filed Oct 23, 2025 · Approved
57 Bartlett Ave · Minor variance
To alter the existing two-storey townhouse dwelling by constructing a rear second storey addition (cantilevered at the rear portion).
230 m away · filed Mar 19, 2025 · Approved
79 Bartlett Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear walkway. Also, to alter the existing one-storey ancillary building (rear detached garage, abutting the laneway) by constructing a complete second storey addition for one laneway suite. There will be a total of two residential dwelling units on this lot (one in the main dwelling and one in the ancillary building).
170 m away · filed Oct 24, 2024 · Approved
99 Bartlett Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by reconstructing the front stairs, and enclosing the front porch.
150 m away · filed Feb 13, 2024 · Approved
129 Shanly St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition, a rear second storey addition, a rear ground floor deck (to replace the existing rear ground floor deck), a front second floor box bay window (to replace the existing bay window) with a front third storey balcony above, and second and third floor rear balconies.
220 m away · filed Nov 22, 2023 · Approved
27 Southview Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by a complete third storey addition, and a rear one-storey with a roof deck above. Also, to reconstruct the front porch and stairs.
130 m away · filed Jul 21, 2023 · Approved
798 Dovercourt Rd · Minor variance
To construct a new three storey detached dwelling with a rooftop deck, for a total of three residential units (triplex). Also, to construct a rear two-storey ancillary building (garden suite) with a sunken yard. The existing two-storey dwelling and the rear garage will be demolished.
230 m away · filed Sep 20, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.