Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

717 Gladstone Ave

The City of Toronto has 2 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Other

    Proposal for rooftop solar panel installation.

    Applied Apr 27, 2024 · issued May 3, 2024 · completed Sep 17, 2024 · Permit 24 141338 BLD

    Closed
  • Drains and site services · Back water valve (Sewer only)

    Proposal to install a back water valve

    Applied May 7, 2020 · issued May 8, 2020 · completed Sep 18, 2020 · Permit 20 143231 DRN

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 157 Hallam Street

    4 homes · Residential

    340 m away · Condominium · Approved · filed Jun 18, 2025

    Approved

Neighbours’ Committee of Adjustment files within 250 m

  • 195 Hallam St · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a complete third storey addition with a rear balcony.

    210 m away · filed Jan 15, 2026 · Approved

  • 10 Millicent St · Minor variance

    To alter the existing rear one-storey detached ancillary building (one-car garage), by constructing a one-storey addition along a portion of the south side wall, to contain a lounge area and bathroom.

    220 m away · filed Dec 4, 2025 · Approved

  • 725 Gladstone Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear second storey addition above the existing rear one-storey addition with a Juliet balcony, that will cantilever over the existing rear basement walkout. The existing ancillary building (detached garage), in the rear yard, abutting the laneway, will be maintained and unaltered.

    20 m away · filed Jun 7, 2024 · Approved

  • 1119 Dufferin St · Minor variance

    To construct a new three-storey detached dwelling (triplex) with rear decks on the ground, second, and third levels, a front third storey rooftop terrace above the front cantilevered second storey portion of the dwelling, and a front landing with stairs.

    220 m away · filed Mar 4, 2024 · Approved

  • 129 Shanly St · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition, a rear second storey addition, a rear ground floor deck (to replace the existing rear ground floor deck), a front second floor box bay window (to replace the existing bay window) with a front third storey balcony above, and second and third floor rear balconies.

    240 m away · filed Nov 22, 2023 · Approved

  • 208 Bartlett Ave · Minor variance

    To construct a new four-storey detached apartment building with front and rear balconies on the second, third and fourth storeys, as well as two parking spaces in the rear yard (accessed from Hallam Street). There will be a total of 8 dwelling units (seven one-bedroom and one two-bedroom units) on this lot. All existing buildings will be demolished.

    130 m away · filed Nov 2, 2023 · Approved

  • 27 Southview Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by a complete third storey addition, and a rear one-storey with a roof deck above. Also, to reconstruct the front porch and stairs.

    180 m away · filed Jul 21, 2023 · Approved

  • 34 Fernbank Ave · Consent

    To obtain consent for a technical severance to re-establish two residential lots which merged on title.

    140 m away · filed Jun 21, 2023 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.