Toronto address · Ward 19, Beaches-East York
72 Adair Rd
The City of Toronto has 6 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
New house · New building
Revision 01 - Proposal to finish the basement with drywall; add separating walls for laundry room, bathroom and furnace.Proposal to demolish existing 1 storey Single Family Dwelling and construct a new 2 storey Single Family Dwelling - Detached.
Applied Aug 31, 2020 · issued Sep 17, 2020 · completed Jun 10, 2022 · Permit 18 218580 BLD (revision 01)
- Closed
Plumbing
Plumbing - Proposal to demolish existing 1 storey SFD-D and construct a new 2 storey SFD-D
Applied Sep 4, 2018 · issued Nov 20, 2018 · completed Apr 4, 2022 · Permit 18 218580 PLB
- Closed
Drains and site services
Drain - Proposal to demolish existing 1 storey SFD-D and construct a new 2 storey SFD-D
Applied Sep 4, 2018 · issued Nov 20, 2018 · completed Apr 1, 2022 · Permit 18 218580 DRN
- Closed
Heating and ventilation
HVAC - Proposal to demolish existing 1 storey SFD-D and construct a new 2 storey SFD-D
Applied Aug 31, 2018 · issued Nov 20, 2018 · completed Apr 4, 2022 · Permit 18 218580 HVA
- Closed
New house · New building
Proposal to demolish existing 1 storey Single Family Dwelling and construct a new 2 storey Single Family Dwelling - Detached.
Applied Aug 31, 2018 · issued Nov 20, 2018 · completed Jun 10, 2022 · 1 home added · Permit 18 218580 BLD
- Closed
Demolition
Proposal to demolish existing 1 storey SFD-D and construct a new 2 storey SFD-D
Applied Aug 31, 2018 · issued Nov 20, 2018 · completed Apr 4, 2022 · 1 home removed · Permit 18 218593 DEM
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
77 Adair Rd · Minor variance
To legalize and to maintain the existing covered front porch with stairs that was built beyond the limits of the authorized building permit (Permit No. 21 177213 BLD 01 SR).
50 m away · filed May 4, 2026 · Approved
45 Peard Rd · Minor variance
To construct a new two-storey detached dwelling with an integral garage, a front covered porch with stairs, a rear covered ground floor deck with stairs, a rear basement walkout, a rear window well, and a rear second floor box bay window.
170 m away · filed Dec 8, 2025 · Approved
45 Peard Rd · Minor variance
To construct a new two-storey detached dwelling with an integral garage, a front covered porch with stairs, a rear covered ground floor deck with stairs, a rear basement walkout, a rear window well, and a rear second floor box bay window.
170 m away · filed Dec 8, 2025 · Approved
2 Medonte Ave · Minor variance
To construct a screened rear yard deck.
250 m away · filed Mar 8, 2023 · Approved
83 Adair Rd · Minor variance
To construct a new three-storey detached dwelling with a front second storey porch and a rear second storey deck.
70 m away · filed Dec 28, 2022 · Approved
83 Adair Rd · Minor variance
To construct a new three-storey detached dwelling with a front second storey porch and a rear second storey deck.
70 m away · filed Dec 28, 2022 · Approved
83 Adair Rd · Consent
To obtain consent to sever the lot into two undersized residential lots.
70 m away · filed Dec 28, 2022 · Approved
78 Peard Rd · Minor variance
To construct a new ground floor deck at the rear of the existing two-storey detached dwelling.
90 m away · filed Sep 27, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.