Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

72 Miller St

The City of Toronto has 3 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Interior alterations

    Proposed interior alterations to the office area and in the warhouse ares, new stair to mezzanine and new cooler and freezer in an existing industrial building.

    Applied Oct 5, 2020 · issued Dec 30, 2020 · completed Nov 30, 2021 · Permit 20 203106 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposed interior alterations to the office area, new stair to mezzanine and new cooler and freezer in the warehouse area of an existing mixed-use industrial building.

    Applied Oct 5, 2020 · issued Dec 30, 2020 · completed Oct 25, 2021 · Permit 20 203106 HVA

    Closed
  • Plumbing

    Plumbing - Proposed interior alterations to the office area, new stair to mezzanine and new cooler and freezer in the warehouse area of an existing mixed-use industrial building.

    Applied Oct 5, 2020 · issued Dec 30, 2020 · completed Oct 22, 2021 · Permit 20 203106 PLB

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 61 Pelham Park Gdns · Minor variance

    To alter the existing 17-storey residential apartment building by replacing the existing entrance vestibule with a larger reconstructed resident lobby and mail room.

    210 m away · filed Sep 11, 2025 · Approved

  • 257 Osler St · Minor variance

    To legalize and to maintain the existing two-storey detached ancillary building (two-car garage), in the rear yard.

    210 m away · filed Feb 20, 2024 · Approved

  • 136 Osler St · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a new rear one-storey addition.

    210 m away · filed Mar 16, 2022 · Approved

  • 46 Lindner St · Minor variance

    To alter the existing two-storey semi-detached dwelling, containing two dwelling units, by constructing an additional dwelling unit on the ground floor, for a total of three dwelling units.

    70 m away · filed May 14, 2021 · Approved

  • 44 Lindner St · Minor variance

    To alter the existing two-storey semi-detached dwelling, containing two dwelling units, by constructing an additional dwelling unit on the ground floor, for a total of three dwelling units.

    60 m away · filed May 14, 2021 · Approved

  • 78 Miller St · Minor variance

    To alter the existing lawful non-conforming Class B Motor Vehicle Repair Shop by constructing a rear three-storey addition with a rear second storey deck, and a front third storey deck.

    20 m away · filed Mar 26, 2021 · Approved

  • 25 Miller St · Minor variance

    To create an additional secondary suite. The dwelling will contain one dwelling unit and two secondary suites.

    120 m away · filed Nov 20, 2018 · Refused

  • 2036 Davenport Rd · Minor variance

    To alter the existing triplex building by: constructing a third storey (cantilevered) addition above the existing building, which will contain a fourth dwelling unit and constructing a roof top patio above the proposed addition and a patio above the existing garage.

    190 m away · filed Aug 16, 2017 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.