Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 19, Beaches-East York

72 Whistle Post St

The City of Toronto has 1 Committee of Adjustment file on record for this address.

Building permits

The City lists no building permits for this address since 2017, and none still open from before.

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To alter the existing two-storey semi-detached dwelling by constructing a front basement entrance and converting the basement into a secondary suite.

    Decision: Approved (hearing Oct 6, 2021)

    Filed Apr 11, 2021 · File A0764/21TEY

    Closed

What’s planned nearby

Development sites within 500 m

  • 8 Dawes Road

    579 homes · Residential

    150 m away · Site plan · Under review · filed Nov 3, 2022

    Under review
  • 9-25 Dawes Road

    33 storeys · 769 homes · Mixed use

    170 m away · Condominium · Under review · filed Oct 28, 2021

    Under review
  • 10-30 Dawes Road

    38 storeys · 636 homes · Mixed use

    230 m away · Site plan · Approved · filed Aug 10, 2021

    Approved
  • 2343 Gerrard Street East

    Residential

    260 m away · Condominium · Approved · filed Oct 4, 2022

    Approved
  • 6 Dawes Road

    37 storeys · 897 homes · Residential

    300 m away · Site plan · Approved · filed Apr 25, 2022

    Approved
  • 2721 Danforth Avenue

    55 storeys · 1,139 homes · Mixed use

    310 m away · Subdivision · Under appeal · filed Nov 7, 2021

    Under appeal

Neighbours’ Committee of Adjustment files within 250 m

  • 40 Crossovers St · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a partial front second storey addition (rooftop deck enclosure) and a partial rear third storey addition (rooftop deck enclosure).

    170 m away · filed Sep 16, 2024 · Approved

  • 2333 Gerrard St E · Minor variance

    To construct a new three-storey detached dwelling (fourplex) with a front covered entrance, a rear ground floor terrace, and a rear staircase leading to balconies on all levels. Also, to construct a new one-storey ancillary building (two-car garage) with two parking pads, abutting Hannaford Street. There will be a total of four residential dwelling units on this lot.

    240 m away · filed Sep 11, 2024 · Approved

  • 10 Dawes Rd · Minor variance

    To alter the redevelopment plan for a mixed-use building consisting of two towers of 24-storeys and 38-storeys atop a shared 6-storey podium, approved under Site Specific By-law 1163-2022(OLT), by increasing the height of the south tower from 38-storeys (119 m) to 43-storeys (136.3 m), resulting in an increase in gross floor area and number of dwelling units. Also, changes to the height of the proposed podium and north tower (ranging from 0.2 to 2.3 m), and alteration to the building envelope for a portion of the rear (west) podium main wall, and a reduction in resident vehicle parking space.

    190 m away · filed May 3, 2024 · Approved

  • 9 Dawes Rd · Minor variance

    To alter the development standards for a mixed-use building approved under Site Specific Zoning By-law 235-2023(OLT) by increasing the building height (6.5 m to 7.8 m, 83.7 m to 100.3 m, 87.3 m to 104.3 m, 91 m to 92.6 m, 94.3 m to 110.8 m, and 84.5 m to 86.1 m) as well as the total gross floor area, and to reduce a building setback.

    160 m away · filed Nov 7, 2023 · Approved

  • 2295 Gerrard St E · Minor variance

    To construct an ancillary structure (shed) in the rear yard of the property with canopy covered areas (trellis).

    230 m away · filed Oct 25, 2022 · Approved

  • 2 Kelvin Ave · Minor variance

    To construct a public storage facility comprised a four-storey building component on the west side of the property and a three-storey building component on the east side of the property.

    140 m away · filed Nov 9, 2017 · Approved

Everything planned in Beaches-East York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.