The City of Toronto has 16 building permits since 2017 (12 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Conditional permit · New building

    Construct 3 levels of underground parking, 6-storey podium containing ground floor retail units, daycare, and a 38-storey tower with a total of 373 dwelling units. The developement includes a 38-storey south tower with a mechanical penthouse. The daycare facility is located in the ground floor and second floor. the building will contain a total of 373 dwelling units;

    Applied Jun 29, 2026 · issued Aug 20, 2026 · Permit 22 141639 BLD

    Inspections under way
  • Heating and ventilation

    Revision 01: Revised DrawingsHVAC - Proposal to demolish the rear of the existing structure, keep the front facade and construct two new residential towers, 24 and 43 storey with a total of 688 units, 6 levels of podium, 3 levels of underground parking garage, with retail and daycare on ground floor, and offices on the second floor.

    Applied Apr 28, 2026 · issued Jul 8, 2026 · Permit 22 141639 HVA (revision 01)

    Revision issued
  • Plumbing

    Revision 01: Revised DrawingsPlumbing - Proposal to demolish the rear of the existing structure, keep the front facade and construct two new residential towers, 24 and 43 storey with a total of 688 units, 6 levels of podium, 3 levels of underground parking garage, with retail and daycare on ground floor, and offices on the second floor.

    Applied Apr 28, 2026 · issued Jul 7, 2026 · Permit 22 141639 PLB (revision 01)

    Revision issued
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - Construct 3 levels of underground parking, 6-storey podium containing ground floor retail units, daycare, 2nd floor office and a 43-storey tower with a total of 480 dwelling units;

    Applied Apr 8, 2025 · Permit 22 141639 FSU

    Application on hold
  • Partial permit · Partial permit - structural framing

    Part Permit - Construct 3 levels of underground parking, 6-storey podium containing ground floor retail units, daycare, 2nd floor office and a 38-storey tower with a total of 423 dwelling units;

    Applied Apr 1, 2025 · completed Aug 19, 2026 · Permit 22 141639 STR

    Superseded
  • Partial permit · Partial permit - foundation

    Part Permit - Construct 3 levels of underground parking, 6-storey podium containing ground floor retail units, daycare, 2nd floor office and a 38-storey tower with a total of 424 dwelling units;

    Applied Apr 12, 2024 · completed Jul 28, 2025 · Permit 22 141639 FND

    Superseded
  • Conditional permit · Partial permit - shoring

    Conditional Permit - Part Permit - Proposal to demolish the rear of the existing structure, keep the front facade and construct two new residential towers, 24 and 38 storey with a total of 631 units, 6 levels of podium, 3 levels of underground parking garage, with retail and daycare on ground floor, and offices on the second floor.

    Applied May 4, 2023 · issued Jul 24, 2023 · completed Jul 19, 2024 · Permit 22 141639 SHO

    Closed
  • Alternative solution

    Applied Aug 29, 2022 · completed Oct 3, 2022 · Permit 22 197061 ALT

    Approved
  • Drains and site services

    Drain - Proposal to demolish the rear of the existing structure, keep the front facade and construct two new residential towers, 24 and 43 storey with a total of 688 units, 6 levels of podium, 3 levels of underground parking garage, with retail and daycare on ground floor, and offices on the second floor.

    Applied May 6, 2022 · issued Jul 19, 2024 · Permit 22 141639 DRN

    Inspections under way
  • Drains and site services · Inside and outside drains

    Drain - Proposal to demolish the rear of the existing structure, keep the front facade and construct two new residential towers, 24 and 43 storey with a total of 688 units, 6 levels of podium, 3 levels of underground parking garage, with retail and daycare on ground floor, and offices on the second floor.

    Applied May 6, 2022 · issued Apr 8, 2025 · Permit 22 141639 STS

    Inspections under way
  • New building

    Construct Levels 7 to 24 including for 207 dwelling units.

    Applied May 3, 2022 · 207 homes added · Permit 22 141720 BLD

    Examiner's notice sent
  • Plumbing

    Plumbing - Proposal to demolish the rear of the existing structure, keep the front facade and construct two new residential towers, 24 and 38 storey with a total of 631 units, 6 levels of podium, 3 levels of underground parking garage, with retail and daycare on ground floor, and offices on the second floor.

    Applied May 3, 2022 · Permit 22 141720 PLB

    Examiner's notice sent
Show 4 more permits
  • Plumbing

    Plumbing - Proposal to demolish the rear of the existing structure, keep the front facade and construct two new residential towers, 24 and 43 storey with a total of 688 units, 6 levels of podium, 3 levels of underground parking garage, with retail and daycare on ground floor, and offices on the second floor.

    Applied May 3, 2022 · issued Aug 5, 2025 · Permit 22 141639 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal to demolish the rear of the existing structure, keep the front facade and construct two new residential towers, 24 and 38 storey with a total of 631 units, 6 levels of podium, 3 levels of underground parking garage, with retail and daycare on ground floor, and offices on the second floor.

    Applied May 3, 2022 · Permit 22 141720 HVA

    Issuance pending
  • Heating and ventilation

    HVAC - Proposal to demolish the rear of the existing structure, keep the front facade and construct two new residential towers, 24 and 43 storey with a total of 688 units, 6 levels of podium, 3 levels of underground parking garage, with retail and daycare on ground floor, and offices on the second floor.

    Applied May 3, 2022 · issued Aug 5, 2025 · Permit 22 141639 HVA

    Inspections under way
  • Addition or alteration · Other

    Proposed to demolish the rear structure.

    Applied Mar 14, 2022 · issued Aug 23, 2022 · completed May 11, 2026 · Permit 22 122403 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To alter the redevelopment plan for a mixed-use building consisting of two towers of 24-storeys and 38-storeys atop a shared 6-storey podium, approved under Site Specific By-law 1163-2022(OLT), by increasing the height of the south tower from 38-storeys (119 m) to 43-storeys (136.3 m), resulting in an increase in gross floor area and number of dwelling units. Also, changes to the height of the proposed podium and north tower (ranging from 0.2 to 2.3 m), and alteration to the building envelope for a portion of the rear (west) podium main wall, and a reduction in resident vehicle parking space.

    Decision: Approved (hearing Jul 3, 2024)

    Filed May 3, 2024 · File A0419/24TEY

    Closed

What’s planned nearby

Development sites within 500 m

  • 9-25 Dawes Road

    33 storeys · 769 homes · Mixed use

    20 m away · Condominium · Under review · filed Oct 28, 2021

    Under review
  • 10-30 Dawes Road

    38 storeys · 636 homes · Mixed use

    50 m away · Site plan · Approved · filed Aug 10, 2021

    Approved
  • 8 Dawes Road

    579 homes · Residential

    60 m away · Site plan · Under review · filed Nov 3, 2022

    Under review
  • 2721 Danforth Avenue

    55 storeys · 1,139 homes · Mixed use

    120 m away · Subdivision · Under appeal · filed Nov 7, 2021

    Under appeal
  • 2681 Danforth Avenue

    48 storeys · 1,050 homes · Residential

    160 m away · Rezoning · Under appeal · filed Dec 21, 2022

    Under appeal
  • 2720-2734 Danforth Avenue

    8 storeys · 64 homes · Not stated in the file

    160 m away · Site plan · Under review · filed Mar 10, 2026

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 6 Dawes Rd · Consent

    To obtain consent to create a new easement/right-of-way. The existing easements/rights-of-way will be maintained and unaltered.

    160 m away · filed Apr 20, 2026 · Approved

  • 40 Crossovers St · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a partial front second storey addition (rooftop deck enclosure) and a partial rear third storey addition (rooftop deck enclosure).

    230 m away · filed Sep 16, 2024 · Approved

  • 9 Dawes Rd · Minor variance

    To alter the development standards for a mixed-use building approved under Site Specific Zoning By-law 235-2023(OLT) by increasing the building height (6.5 m to 7.8 m, 83.7 m to 100.3 m, 87.3 m to 104.3 m, 91 m to 92.6 m, 94.3 m to 110.8 m, and 84.5 m to 86.1 m) as well as the total gross floor area, and to reduce a building setback.

    40 m away · filed Nov 7, 2023 · Approved

  • 6 Dawes Rd · Minor variance

    To alter the development standards, as approved under Site Specific Zoning By-law 1176-2022(OLT), which include changes to the overall height, parking standards, and to permit washrooms within the mechanical penthouse, for Phase 1 (West Block) of the development.

    160 m away · filed Jul 19, 2023 · Approved

  • 72 Whistle Post St · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a front basement entrance and converting the basement into a secondary suite.

    190 m away · filed Apr 11, 2021 · Approved

  • 2822 Danforth Ave · Minor variance

    To alter the existing two-storey commercial building by constructing a partial second storey addition and a third storey addition.

    230 m away · filed Mar 23, 2021 · Approved

  • 2 Kelvin Ave · Minor variance

    To construct a public storage facility comprised a four-storey building component on the west side of the property and a three-storey building component on the east side of the property.

    220 m away · filed Nov 9, 2017 · Approved

  • 2766 Danforth Ave · Consent

    To obtain consent to the technical severance of the property for the purpose of re-establishing the two lots which merged on title.

    170 m away · filed Aug 7, 2015 · Approved

Everything planned in Beaches-East York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.