6 Dawes Rd

The City of Toronto has 33 building permits since 2017 (22 still open) and 2 Committee of Adjustment files on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Fire and security upgrade · Electromagnetic locks

    Installation of five (5) electromagnetic door locks (maglocks) on Floor 1, Floor 2, and Floor 3.

    Applied Sep 21, 2026 · Permit 26 240859 FSU

    Not started
  • Alternative solution

    Alternative solution for the ................................................ main building permit 23 120705.

    Applied Feb 18, 2026 · completed Jun 15, 2026 · Permit 26 118286 ALT

    Approved
  • Conditional permit · New building

    Conditional Permit - Proposal for the construction of a 29-storey purpose-built rental mixed-use tower. The podium that the tower sits on is covered in a separate permit application 23 120705 BLD 00 NB.

    Applied Aug 7, 2025 · issued Sep 5, 2025 · Permit 23 125766 BLD

    Inspections under way
  • Conditional permit · New building

    Conditional Permit - Proposal for the construction of a 37-storey purpose-built rental mixed-used tower. The podiumthat the tower sits on is covered in a separate permit application 23 120705 BLD 00 NB.

    Applied Aug 7, 2025 · issued Sep 5, 2025 · Permit 23 125806 BLD

    Inspections under way
  • Conditional permit · Inside and outside drains

    Conditional Permit - Drain - Proposal for the construction of a 39-storey purpose-built rental tower 'B' including a 10-storey mixed-used podium with retail and day nursery at grade.

    Applied May 23, 2025 · issued Jun 20, 2025 · Permit 23 120705 STS

    Inspections under way
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - Proposal for the construction of a 37-storey purpose-built rental mixed-used tower. The podiumthat the tower sits on is covered in a separate permit application 23 120705 BLD 00 NB.

    Applied May 21, 2025 · Permit 23 125806 FSU

    Application on hold
  • Alternative solution

    Alternative Solution ProposalAt the request of Ontari Holdings Ltd., Matteo Gilfillan & Associates Inc. (MGA) has prepared this correspondence to summarize the proposed Alternative Solution for providing 65 mm diameter standpipe hose connections within the exit stairs (and as required on the floor areas for additional coverage purposes) in lieu of traditional fire hose cabinets ( containing 38 mm and 65 mm connections and 30 m of fire hose) for the proposed mixed-use development, consisting of three high-rise towers (Tower A, Tower B, and Tower C) situated above 10 storeys of shared podium an…

    Applied Jan 24, 2025 · completed Apr 30, 2025 · Permit 25 108470 ALT

    Approved
  • Alternative solution

    Alternative Solution ProposalAt the request of Ontari Holdings Ltd., Matteo Gilfillan & Associates Inc. (MGA) has prepared this correspondence to summarize the proposed Alternative Solution for providing 65 mm diameter standpipe hose connections within the exit stairs (and as required on the floor areas for additional coverage purposes) in lieu of traditional fire hose cabinets ( containing 38 mm and 65 mm connections and 30 m of fire hose) for the proposed mixed-use development, consisting of three high-rise towers (Tower A, Tower B, and Tower C) situated above 10 storeys of shared podium an…

    Applied Jan 24, 2025 · completed Apr 30, 2025 · Permit 25 108489 ALT

    Approved
  • Alternative solution

    Alternative Solution ProposalAt the request of Ontari Holdings Ltd., Matteo Gilfillan & Associates Inc. (MGA) has prepared this correspondence to summarize the proposed Alternative Solution for providing 65 mm diameter standpipe hose connections within the exit stairs (and as required on the floor areas for additional coverage purposes) in lieu of traditional fire hose cabinets ( containing 38 mm and 65 mm connections and 30 m of fire hose) for the proposed mixed-use development, consisting of three high-rise towers (Tower A, Tower B, and Tower C) situated above 10 storeys of shared podium an…

    Applied Jan 24, 2025 · completed Apr 30, 2025 · Permit 25 108493 ALT

    Approved
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - Proposal to renovate a vacant leasable space into a new Montessori Childcare Facility.

    Applied Dec 18, 2024 · Permit 24 174626 FSU

    Application on hold
  • Alternative solution

    Alternative Solution ProposalAt the request of Ontari Holdings Ltd., Matteo Gilfillan & Associates Inc. (MGA) has prepared this correspondence to summarize the proposed Alternative Solution for providing 65 mm diameter standpipe hose connections within the exit stairs (and as required on the floor areas for additional coverage purposes) in lieu of traditional fire hose cabinets ( containing 38 mm and 65 mm connections and 30 m of fire hose) for the proposed mixed-use development, consisting of three high-rise towers (Tower A, Tower B, and Tower C) situated above 10 storeys of shared podium an…

    Applied Nov 21, 2024 · completed Jan 10, 2025 · Permit 24 241908 ALT

    Cancelled
  • Alternative solution

    Applied Nov 21, 2024 · completed Nov 22, 2024 · Permit 24 241904 ALT

    Cancelled
Show 21 more permits
  • Alternative solution

    Alternative Solution ProposalAt the request of Ontari Holdings Ltd., Matteo Gilfillan & Associates Inc. (MGA) has prepared this correspondence to summarize the proposed Alternative Solution for providing 65 mm diameter standpipe hose connections within the exit stairs (and as required on the floor areas for additional coverage purposes) in lieu of traditional fire hose cabinets ( containing 38 mm and 65 mm connections and 30 m of fire hose) for the proposed mixed-use development, consisting of three high-rise towers (Tower A, Tower B, and Tower C) situated above 10 storeys of shared podium an…

    Applied Nov 21, 2024 · completed Jan 10, 2025 · Permit 24 241909 ALT

    Cancelled
  • Alternative solution

    Alternative Solution ProposalAt the request of Ontari Holdings Ltd., Matteo Gilfillan & Associates Inc. (MGA) has prepared this correspondence to summarize the proposed Alternative Solution for providing 65 mm diameter standpipe hose connections within the exit stairs (and as required on the floor areas for additional coverage purposes) in lieu of traditional fire hose cabinets ( containing 38 mm and 65 mm connections and 30 m of fire hose) for the proposed mixed-use development, consisting of three high-rise towers (Tower A, Tower B, and Tower C) situated above 10 storeys of shared podium an…

    Applied Nov 21, 2024 · completed Jan 9, 2025 · Permit 24 241901 ALT

    Cancelled
  • Addition or alteration · Interior alterations

    Proposal to renovate a vacant leasable space into a new Montessori Childcare Facility.

    Applied Jul 4, 2024 · Permit 24 174626 BLD

    Examiner's notice sent
  • Plumbing

    Plumbing - Proposal to renovate a vacant leasable space into a new Montessori Childcare Facility.

    Applied Jul 4, 2024 · Permit 24 174626 PLB

    Issuance pending
  • Heating and ventilation

    HVAC - Proposal to renovate a vacant leasable space into a new Montessori Childcare Facility.

    Applied Jul 4, 2024 · Permit 24 174626 HVA

    Issuance pending
  • Drains and site services

    Drain - Proposal for the construction of a 39-storey purpose-built rental tower 'B' including a 10-storey mixed-used podium with retail and day nursery at grade.

    Applied Jun 7, 2024 · issued Jan 23, 2025 · Permit 23 120705 DRN

    Inspections under way
  • Development charges deferral

    Deferred Fees from folder 23 120705 (RSN-5238082) ZoningProcess RSN 72272506

    Applied Apr 22, 2024 · Permit 24 120705 BLD

    Open
  • Partial permit · Partial permit - structural framing

    Part Permit - For the construction of a 29-storey purpose-built rental mixed-use tower. The podium that the tower sits on is covered in a separate permit application 23 120705 BLD 00 NB.

    Applied Apr 4, 2023 · completed Sep 5, 2025 · Permit 23 125766 STR

    Superseded
  • Partial permit · Partial permit - structural framing

    Part Permit - Proposal for the construction of a 37-storey purpose-built rental mixed-used tower. The podium that the tower sits on is covered in a separate permit application 23 120705 BLD 00 NB.

    Applied Apr 4, 2023 · completed Sep 5, 2025 · Permit 23 125806 STR

    Superseded
  • Heating and ventilation

    HVAC - For the construction of a 29-storey purpose-built rental mixed-use tower. The podium that the tower sits on is covered in a separate permit application 23 120705 BLD 00 NB.

    Applied Mar 22, 2023 · issued May 28, 2025 · Permit 23 125766 HVA

    Inspections under way
  • Plumbing

    Plumbing - Proposal for the construction of a 37-storey purpose-built rental mixed-used tower. The podiumthat the tower sits on is covered in a separate permit application 23 120705 BLD 00 NB.

    Applied Mar 22, 2023 · issued Jun 4, 2025 · Permit 23 125806 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal for the construction of a 37-storey purpose-built rental mixed-used tower. The podiumthat the tower sits on is covered in a separate permit application 23 120705 BLD 00 NB.

    Applied Mar 22, 2023 · issued Jun 4, 2025 · Permit 23 125806 HVA

    Inspections under way
  • Plumbing

    Plumbing - For the construction of a 29-storey purpose-built rental mixed-use tower. The podium that the tower sits on is covered in a separate permit application 23 120705 BLD 00 NB.

    Applied Mar 22, 2023 · issued May 28, 2025 · Permit 23 125766 PLB

    Inspections under way
  • Partial permit · Partial permit - shoring

    Part Permit - Proposal for the construction of a 39-storey purpose-built rental tower 'B' including a 10-storey mixed-used podium with retail and day nursery at grade.

    Applied Mar 13, 2023 · completed Aug 13, 2024 · Permit 23 120705 SHO

    Cancelled
  • Partial permit · Partial permit - structural framing

    Part Permit - Proposal for the construction of a 39-storey purpose-built rental tower 'B' including a 10-storey mixed-used podium with retail and day nursery at grade.

    Applied Mar 13, 2023 · completed Aug 27, 2025 · Permit 23 120705 STR

    Superseded
  • Partial permit · Partial permit - foundation

    Part Permit - Proposal for the construction of a 39-storey purpose-built rental tower 'B' including a 10-storey mixed-used podium with retail and day nursery at grade.

    Applied Mar 13, 2023 · completed Jun 4, 2025 · Permit 23 120705 FND

    Superseded
  • Heating and ventilation

    HVAC - Proposal for the construction of a 39-storey purpose-built rental tower 'B' including a 10-storey mixed-used podium with retail and day nursery at grade.

    Applied Mar 7, 2023 · issued Jun 6, 2025 · Permit 23 120705 HVA

    Inspections under way
  • Plumbing

    Plumbing - Proposal for the construction of a 39-storey purpose-built rental tower 'B' including a 10-storey mixed-used podium with retail and day nursery at grade.

    Applied Mar 7, 2023 · issued May 28, 2025 · Permit 23 120705 PLB

    Inspections under way
  • New building

    Proposal for the construction of a 39-storey purpose-built rental tower 'B' including a 10-storey mixed-used podium with retail and day nursery at grade. Towers 'A' & 'C' are located above the podium, for a total of 923 rental dwelling units for Phase 1 - West Block.

    Applied Mar 7, 2023 · 405 homes added · Permit 23 120705 BLD

    Under review
  • Addition or alteration · Shoring

    Shoring and excavation (for environmental remediation) around the perimeter of the property (BLOCK B and Podium)

    Applied Jan 20, 2023 · Permit 23 105848 BLD

    Abandoned
  • Demolition

    Demolition of the existing storage buildings.(22 137808 STE 19 SA)

    Applied Oct 7, 2022 · issued Dec 15, 2022 · completed Apr 27, 2026 · Permit 22 214319 DEM

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Consent · Create new Easement/ROW

    To obtain consent to create a new easement/right-of-way. The existing easements/rights-of-way will be maintained and unaltered.

    Decision: Approved (hearing Jul 22, 2026)

    Filed Apr 20, 2026 · File B0034/26TEY

    Conditional consent
  • Minor variance · Other

    To alter the development standards, as approved under Site Specific Zoning By-law 1176-2022(OLT), which include changes to the overall height, parking standards, and to permit washrooms within the mechanical penthouse, for Phase 1 (West Block) of the development.

    Decision: Approved (hearing Oct 25, 2023)

    Filed Jul 19, 2023 · File A0671/23TEY

    Approved with conditions

What’s planned nearby

Development sites within 500 m

  • 6 Dawes Road

    37 storeys · 897 homes · Residential

    20 m away · Site plan · Approved · filed Apr 25, 2022

    Approved
  • 2681 Danforth Avenue

    48 storeys · 1,050 homes · Residential

    140 m away · Rezoning · Under appeal · filed Dec 21, 2022

    Under appeal
  • 8 Dawes Road

    579 homes · Residential

    150 m away · Site plan · Under review · filed Nov 3, 2022

    Under review
  • 10-30 Dawes Road

    38 storeys · 636 homes · Mixed use

    170 m away · Site plan · Approved · filed Aug 10, 2021

    Approved
  • 9-25 Dawes Road

    33 storeys · 769 homes · Mixed use

    170 m away · Condominium · Under review · filed Oct 28, 2021

    Under review
  • 2575 Danforth Avenue

    55 storeys · 1,543 homes · Residential

    180 m away · Rezoning · Under appeal · filed Aug 26, 2022

    Under appeal

Neighbours’ Committee of Adjustment files within 250 m

  • 40 Crossovers St · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a partial front second storey addition (rooftop deck enclosure) and a partial rear third storey addition (rooftop deck enclosure).

    220 m away · filed Sep 16, 2024 · Approved

  • 10 Dawes Rd · Minor variance

    To alter the redevelopment plan for a mixed-use building consisting of two towers of 24-storeys and 38-storeys atop a shared 6-storey podium, approved under Site Specific By-law 1163-2022(OLT), by increasing the height of the south tower from 38-storeys (119 m) to 43-storeys (136.3 m), resulting in an increase in gross floor area and number of dwelling units. Also, changes to the height of the proposed podium and north tower (ranging from 0.2 to 2.3 m), and alteration to the building envelope for a portion of the rear (west) podium main wall, and a reduction in resident vehicle parking space.

    160 m away · filed May 3, 2024 · Approved

  • 9 Dawes Rd · Minor variance

    To alter the development standards for a mixed-use building approved under Site Specific Zoning By-law 235-2023(OLT) by increasing the building height (6.5 m to 7.8 m, 83.7 m to 100.3 m, 87.3 m to 104.3 m, 91 m to 92.6 m, 94.3 m to 110.8 m, and 84.5 m to 86.1 m) as well as the total gross floor area, and to reduce a building setback.

    190 m away · filed Nov 7, 2023 · Approved

  • 165 Stephenson Ave · Minor variance

    To construct a new maintenance building.

    230 m away · filed Feb 8, 2021 · Approved

  • 2575 Danforth Ave · Minor variance

    To alter the existing 22-storey mixed-use Building B containing ground floor commercial uses, by constructing a front and east side one-storey commercial addition.

    170 m away · filed May 9, 2017 · Approved

Everything planned in Beaches-East York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.