Toronto address · Ward 3, Etobicoke-Lakeshore
73 Eighth St
The City of Toronto has 3 building permits since 2017 (3 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Heating and ventilation
HVAC - Addition to rear of building. Walls to south and east at rear and crawl space below existing kitchen may be maintained.
Applied Mar 27, 2007 · issued Apr 2, 2007 · Permit 06 167810 HVA
- Revision issued
Small residential project · Addition(s)
Addition to rear of building. Walls to south and east at rear and crawl space below existing kitchen may be maintained. REVISON: Basement - remove existing foundation at rear, below kitchen; new column First floor - rear floor of house flush with existing 1st floor; changes to floor framing from concrete slab on grade and openings in perimeter wall 2nd floor - No stair case and engineered floor framing Roof - raise 12"
Applied Jan 18, 2007 · issued Jan 26, 2007 · Permit 06 167810 BLD (revision 01)
- Inspections under way
Small residential project · Addition(s)
Addition to rear of building. Walls to south and east at rear and crawl space below existing kitchen may be maintained.
Applied Aug 18, 2006 · issued Sep 8, 2006 · Permit 06 167810 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
4 storeys · Not stated in the file
470 m away · Site plan · Under review · filed Mar 13, 2026
Neighbours’ Committee of Adjustment files within 250 m
73 Tenth St · Minor variance
To construct a one-storey rear addition and a new rear deck.
190 m away · filed Dec 2, 2025 · Approved
46 Tenth St · Minor variance
To maintain the existing front porch that is currently uncer construction.
240 m away · filed Sep 26, 2025 · Approved
84 Tenth St · Minor variance
To construct a second and third storey addition above the existing dwelling.
240 m away · filed Apr 29, 2025 · Approved
16 Eighth St · Minor variance
To enclose the existing front porch.
250 m away · filed Apr 24, 2025 · Approved
62 Seventh St · Minor variance
To construct a new duplex with an attached garage.
110 m away · filed Apr 11, 2025 · Refused
69 Tenth St · Minor variance
To construct a two-storey rear addition including a deck in the rear yard.
190 m away · filed Aug 9, 2024 · Approved
72 Seventh St · Minor variance
To legalize and to maintain the existing building that is currently under construction by constructing a two-storey rear addition, a one-storey rear addition and to create a secondary suite.
90 m away · filed May 29, 2024 · Approved
62 Seventh St · Minor variance
To construct a two-storey rear addition, a second storey addition above the existing dwelling and a second storey rear platform. A previous Committee of Adjustment application (A0119/23EYK) approved a variance related to floor space index.
110 m away · filed May 21, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.