Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 17, Don Valley North

731 Sheppard Ave E

Bessarion Station

The City of Toronto has 9 building permits since 2017 (3 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing · Backflow prevention devices (Water only)

    REV: Proposed revision to reflect the addition of a new water meter, MTU conduit and associated layout changes to BFPs.Install backflow preventer

    Applied Aug 7, 2025 · issued Aug 18, 2025 · Permit 24 152724 PSA (revision 01)

    Revision issued
  • Plumbing · Backflow prevention devices (Water only)

    Install backflow preventer

    Applied May 22, 2024 · issued Jun 14, 2024 · Permit 24 152724 PSA

    Inspections under way
  • Addition or alteration · Other

    Proposal to reverse swing of north entrance doors, install new railing

    Applied Dec 12, 2018 · issued Jan 17, 2019 · Permit 18 267548 BLD

    Permit issued
  • Addition or alteration · Interior alterations

    Proposal for interior alterations for removal of existing fare gate and installation of new Presto fare gates. TTC Bessarion Station.

    Applied Jan 12, 2018 · issued Jan 26, 2018 · completed Mar 26, 2019 · Permit 18 104465 BLD

    Closed
  • Fire and security upgrade · Electromagnetic locks

    Install 2 electromagnetic locks in toronto transit commission in bessarion station.

    Applied Nov 12, 2002 · issued Nov 22, 2002 · completed Jun 8, 2026 · Permit 02 188184 FSU

    Closed (dormant)
  • Addition or alteration · Interior alterations

    Proposed intertior altertion to gateway newstand

    Applied Oct 8, 2002 · issued Nov 26, 2002 · completed Jun 8, 2026 · Permit 02 179715 BLD

    Closed (dormant)
  • Heating and ventilation

    Hvac-new subway station

    Applied Apr 30, 1998 · issued Dec 25, 1998 · completed Jun 8, 2026 · Permit 98 251791 HVA

    Closed (dormant)
  • Plumbing

    New subway station

    Applied Apr 30, 1998 · issued Dec 25, 1998 · completed Jun 8, 2026 · Permit 98 251985 PLB

    Closed (dormant)
  • Drains and site services

    New subway station

    Applied Apr 30, 1998 · issued Jan 22, 1999 · completed Jun 8, 2026 · Permit 98 251482 DRN

    Closed (dormant)

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 1009 Sheppard Ave E · Consent

    To permit non-exclusive easements for pedestrian and vehicular access over portions of Canadian Tire Corporation (CTC) land, and Canadian Tire Properties Inc. (CTPI) land, in favour of the Concord site (25, 35, 55, 65 and 75 Billes Heights and 18, 20, 28, 32, 38, 62 and 68 Esther Shiner Boulevard). Related planning files (Concord site). Related planning files include A0670/20NY, and 19 155827 NY 17 SA.

    190 m away · filed Feb 16, 2022 · Approved

  • 1001 Sheppard Ave E · Minor variance

    A mixed use building with three towers (19, 31 and 27 storeys) and a total gross floor area of 82,241.56 sq.m. 990 dwelling units, 754 bicycle parking spaces, 1,079 parking spaces and 3 loading space are proposed.

    70 m away · filed Dec 15, 2020 · Approved

  • 1001 Sheppard Ave E · Minor variance

    To legalize and maintain the existing undersized underground parking spaces.

    70 m away · filed Dec 6, 2018 · Approved

  • 1001 Sheppard Ave E · Minor variance

    To construct two towers of 33 and 36 storeys linked by a podium containing lobby and amenity space together with townhouse units, total 692 dwelling units and 674 parking spaces.

    70 m away · filed Jun 29, 2017 · Approved

  • 23 Burbank Dr · Minor variance

    To construct a new two-storey dwelling. The existing dwelling would be demolished.

    220 m away · filed Jun 12, 2017 · Approved

  • 780 Sheppard Ave E · Minor variance

    The proposal is to permit a stacked townhouse development at the rear of the site. Please be advised the subject property went before the Committee of Adjustment on July 23, 2014, DEFERRED SINE DIE in order to allow the applicant an opportunity to resolve the issues regarding the ownership of a portion of the east lot line.

    200 m away · filed May 29, 2014 · Refused

Everything planned in Don Valley North

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.