Toronto address · Ward 11, University-Rosedale
74 Wellesley St W
St. Joseph's College
The City of Toronto has 5 building permits since 2017 (3 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Heating and ventilation · Other
IProposal fo installation of new air conditioning units for cooling centre in library
Applied Jul 4, 2024 · issued Jul 31, 2024 · Permit 24 174774 MSA
- Inspections under way
Fire and security upgrade · Fire alarm
Proposal to install a new fire alarm system, paging system and emergency lighting retrofit in the existing secondary school.
Applied Apr 16, 2015 · issued Apr 28, 2015 · Permit 15 142462 FSU
- Permit issued
Plumbing · Backflow prevention devices (Water only)
Proposal to install one backflow prevention device in existing highschool "St Joseph's College".
Applied Oct 13, 2011 · issued Oct 24, 2011 · Permit 11 291688 PSA
- Closed
Heating and ventilation
REVISION - to add and remove partition walls.HVAC - permit for interior alterations to existing secondary school. floor 4. St Joseph College.
Applied Aug 17, 2011 · issued Aug 24, 2011 · completed Oct 23, 2025 · Permit 10 232488 HVA (revision 01)
- Closed
Heating and ventilation
HVAC - permit for interior alterations to existing secondary school. floor 4. St Joseph College.
Applied Aug 9, 2010 · issued Aug 24, 2010 · completed Oct 23, 2025 · Permit 10 232488 HVA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
40 storeys · 446 homes · Residential
70 m away · Site plan · Approved · filed Apr 19, 2022
- Approved
- Under review
59 storeys · 540 homes · Mixed use
310 m away · Condominium · Under review · filed Oct 22, 2021
- Under review
530-550 Yonge Street, 6-8 Breadalbane Street and 145 St Luke Lane
67 storeys · 860 homes · Mixed use
340 m away · Site plan · Under review · filed Nov 8, 2024
- Under review
- Approved
Neighbours’ Committee of Adjustment files within 250 m
95 St Joseph St · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-law 1030-2022) for a new 40-storey mixed-use building, by increasing the building height, and to reduce the minimum number of vehicular parking spaces, the setback of the mechanical penthouse, and residential amenity space (indoor and outdoor).
90 m away · filed Jun 18, 2024 · Approved
95 St Joseph St · Consent
To obtain consent to a strata severance and to create various easements/rights-of-ways within a 40-storey mixed-use redevelopment.
90 m away · filed Jun 18, 2024 · Approved
900 Bay St · Minor variance
To amend the development standards to permit the existing height of the four buildings on site (Hepburn Tower (11-storeys), Mowat Tower (24-storeys), Hearst Tower (10-storeys), and Ferguson Tower (14-storeys)) and to allow an increase in height of three of the buildings (Hepburn, Mowat, and Hearst towers) for the purpose of insulation and roof drainage.
140 m away · filed Aug 4, 2023 · Approved
110 Wellesley St W · Minor variance
To alter the lawful non-conforming public transit use by installing a new exit/entrance structure (for Museum Station), within Queens Park, that will connect directly to the south end of the existing platform. The property has lawful non-conforming status under the Planning Act, as the Museum Station existed prior to the passing of the Zoning By-law, which does not permit the use of public transit in a G zone. Any change of use, alterations or additions to the building requires the permission of the Committee of Adjustment.
240 m away · filed Jan 22, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.