Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 8, Eglinton-Lawrence

75 Stayner Ave

The City of Toronto has 4 building permits since 2017 (2 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services

    Drain - Alterations to first floor, basement underpinning, second floor addition, two storey small addition at front, front and rear porch and basement walkout

    Applied Apr 26, 2010 · issued Apr 26, 2010 · completed Jan 12, 2026 · Permit 09 195603 DRN

    Closed
  • Heating and ventilation

    HVAC - Alterations to first floor, basement underpinning, second floor addition, two storey small addition at front, front and rear porch and basement walkout

    Applied Jan 29, 2010 · issued Feb 17, 2010 · completed Jan 12, 2026 · Permit 09 195603 HVA

    Closed
  • Plumbing

    Plumbing - Alterations to first floor, basement underpinning, second floor addition, two storey small addition at front, front and rear porch and basement walkout

    Applied Dec 10, 2009 · issued Feb 8, 2010 · Permit 09 195603 PLB

    Inspections under way
  • Small residential project · Multiple projects

    Alterations to first floor, basement underpinning, second floor addition, two storey small addition at front, front and rear porch and basement walkout

    Applied Dec 10, 2009 · issued Feb 8, 2010 · Permit 09 195603 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 81 Stayner Ave · Minor variance

    To alter the existing detached dwelling and construct an attached garage.

    40 m away · filed Sep 18, 2026 · Accepted

  • 981 Briar Hill Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a rear one-storey addition. The existing ancillary building (detached garage) is to be maintained.

    110 m away · filed May 28, 2026 · Approved

  • 162 Times Rd · Minor variance

    To construct a new 3 storey - fourplex and a new garden suite to replace the existing detached garage.

    180 m away · filed Aug 20, 2025 · Approved

  • 974 Briar Hill Ave · Minor variance

    To cnstruct a new 3 storey dwelling with a covered front porch, rear deck and balcony.

    90 m away · filed Aug 6, 2025 · conditional approval

  • 30 Danesbury Ave · Minor variance

    To convert the existing one-storey detached dwelling into a fourplex by constructing a second and third storey additions and three-storey rear addition.

    240 m away · filed Jul 11, 2025 · Approved

  • 59 Danesbury Ave · Minor variance

    To construct a new 2 storey dwelling, and demolish the garage in the rear yard.

    210 m away · filed Jan 4, 2024 · Approved

  • 102 Stayner Ave · Minor variance

    Proposal to construct an attached garage to the east side of the residential dwelling.

    210 m away · filed Nov 9, 2023 · conditional approval

  • 14 Risa Blvd · Minor variance

    Proposal for second and third storey addition and side yard addition.

    220 m away · filed Mar 23, 2022 · Approved

Everything planned in Eglinton-Lawrence

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.