Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

75 Victoria St

The City of Toronto has 1 building permit since 2017 (1 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - Proposal for interior alterations to basement, ground and mezzanine, total occupant loact of 170 persons "Creemore Restaurant"

    Applied Aug 14, 2015 · Permit 15 194871 FSU

    Application on hold

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 30 Bond St · Minor variance

    To alter the existing public hospital (St. Michael's Hospital, bounded by Shuter Street, Bond Street, Queen Street East, and Victoria Street) by installing an air handling unit (AHU) on a portion of the roof (Donnelly Wing).

    230 m away · filed Nov 14, 2025 · Approved

  • 89 Church St · Minor variance

    To permit a reduction in the number of required resident parking spaces and nine obstructed parking spaces, on-site.

    190 m away · filed Nov 4, 2024 · Approved

  • 34 King St E · Minor variance

    To alter the development standards for the 33-storey mixed-use building (approved under Site Specific Zoning By-Law 1195-2022), by converting the required office use space into hotel use space (for 142 hotel suites and related facilities) on floors 1 through 10. The site is subject to a current Site Plan Control Application (File 2017 235087 STE 28 SA).

    220 m away · filed Jul 8, 2024 · Approved

  • 67 Adelaide St E · Minor variance

    To construct a partial fourth floor addition to the existing building for the conversion into a Municipal Shelter.

    190 m away · filed May 19, 2021 · Approved

  • 20 Lombard St · Minor variance

    To alter the redevelopment plan for a 46-storey mixed-use building, previously approved under Site-Specific By-laws 132-2016 (OMB) and 133-2016 (OMB), by creating additional dwelling units, converting residential parking spaces to commercial parking spaces and converting a bicycle parking area to a bulk parcel storage room.

    30 m away · filed Sep 21, 2020 · Approved

  • 25 Richmond St E · Minor variance

    To alter the redevelopment plan for the 46 storey mixed-use building approved under Site-Specific By-Laws 132-2016 and 133-2016, by relocating amenity space from floor 45 to floor 46, constructing two additional dwelling units on floor 45 (total 693 Dwelling Units), and increasing the gross floor area accordingly. Additionally, this application seeks to maintain the existing fifth storey addition and elevator overrun located atop the southeastern heritage building.

    40 m away · filed Oct 3, 2019 · Approved

  • 76 Richmond St E · Minor variance

    To alter the existing three-storey mixed-use building by constructing a three-storey addition on top of the existing structure, new rear balconies from the second to fifth storeys, and a sixth storey courtyard. The fourth and fifth storeys will contain office use and the fifth and sixth storeys will contain residential use.

    210 m away · filed Mar 12, 2018 · Approved

  • 20 Lombard St · Minor variance

    To alter the development scheme for a 46-storey mixed use building containing a heritage building by increasing the height of the heritage building, providing two additional dwelling units for a total of 682 residential dwelling units, transferring one residential parking space to a commercial parking space, increasing the total gross floor area and reducing building setbacks.

    30 m away · filed Oct 18, 2017 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.