Toronto address · Ward 15, Don Valley West
751 Merton St
The City of Toronto has 1 building permit since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Small residential project · Interior alterations
Proposal interior alterations to remove a non-load bearing wall on second floor of multi unit dwelling
Applied Nov 28, 2022 · issued Dec 19, 2022 · Permit 22 233782 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
664 Merton St · Minor variance
To permit a rear deck and roof extension over part of the existing basement walkout.
170 m away · filed Jun 1, 2024 · Approved
738 Balliol St · Minor variance
To legalize the new garage structure that has already been constructed. No changes to the as-built size or shape are proposed.
180 m away · filed Aug 25, 2022 · Approved
15 McRae Dr · Minor variance
Proposal to construct a 2 storey rear addition, a 1 storey front addition, and for interior alterations to an existing single family dwelling.
150 m away · filed Jun 22, 2022 · Approved
28 McRae Dr · Minor variance
Proposal to construct a ground and second floor addition, interior alterations and a new rear deck.
230 m away · filed May 27, 2022 · Approved
740 Balliol St · Minor variance
Proposal to legalize rear garage.
170 m away · filed May 5, 2022 · Approved
553 Davisville Ave · Minor variance
To construct a rear yard laneway suite.
240 m away · filed Nov 5, 2021 · Approved
713 Balliol St · Minor variance
Proposal for a ground and second floor addition and a new third floor addition to the existing dwelling.
140 m away · filed Oct 20, 2021 · Approved
22 St Cuthberts Rd · Minor variance
To construct a basement, ground floor, and second floor addition including a rear deck and second floor balcony.
250 m away · filed Sep 16, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.