Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 8, Eglinton-Lawrence

76 Albertus Ave

The City of Toronto has 4 building permits since 2017 (1 still open) and 2 Committee of Adjustment files on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services

    Drain - Proposal to construct a first and second storey rear addition, third floor addition, interior alterations, new rear deck and basement areaway

    Applied Feb 21, 2023 · issued Feb 21, 2023 · completed Nov 27, 2023 · Permit 22 183883 DRN

    Closed
  • Heating and ventilation

    HVAC - Proposal to construct a first and second storey rear addition, third floor addition, interior alterations, new rear deck and basement areaway

    Applied Jan 5, 2023 · issued Jan 12, 2023 · completed Nov 27, 2023 · Permit 22 183883 HVA

    Closed
  • Small residential project · Multiple projects

    Proposal to construct a first and second storey rear addition, third floor addition, interior alterations, new rear deck and basement areaway

    Applied Jul 29, 2022 · issued Sep 1, 2022 · Permit 22 183883 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal to construct a first and second storey rear addition, third floor addition, interior alterations, new rear deck and basement areaway

    Applied Jul 29, 2022 · issued Sep 1, 2022 · completed Nov 27, 2023 · Permit 22 183883 PLB

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    Proposal to construct a new one-storey an two-storey rear additions, and a new third floor addition over existing footprint.

    Decision: Approved (hearing Apr 28, 2022)

    Filed Feb 3, 2022 · File A0112/22NY

    Closed
  • Minor variance · R addition

    Proposal to construct a first and second storey rear addition, third floor addition, new rear deck and basement areaway.

    Decision: Refused (hearing Nov 18, 2021)

    Filed Sep 1, 2021 · File A0644/21NY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 34 Craighurst Ave · Minor variance

    To construct a two-storey and second storey addition to the rear of the existing dwelling, in conjunction with other interior and exterior alterations.

    150 m away · filed Jul 27, 2026 · Deferred

  • 158 Albertus Ave · Minor variance

    To construct a 3rd storey front addition, a 2 storey rear addition, and rebuild the existing front porch.

    190 m away · filed Sep 11, 2025 · Approved

  • 2561 Yonge St · Minor variance

    To alter the existing building by adding a rear second storey addition.

    220 m away · filed Sep 4, 2025 · Approved

  • 57 Lytton Blvd · Minor variance

    Proposal to demolish existing single family dwelling and construct a new 4-unit multiplex building.

    160 m away · filed Apr 25, 2025 · Approved

  • 33 Lytton Blvd · Minor variance

    To construct an inground pool in the rear yard.

    160 m away · filed Apr 25, 2025 · Approved

  • 2551 Yonge St · Minor variance

    To construct 1 storey slab on grade rear addition to an existing ground floor retail unit

    250 m away · filed May 30, 2024 · Approved

  • 160 Albertus Ave · Minor variance

    To construct 2-storey rear addition to existing 2-storey detached dwelling and add new third floor.

    200 m away · filed Mar 13, 2024 · Approved

  • 83 Lytton Blvd · Minor variance

    Proposal to construct a new dwelling.

    220 m away · filed Oct 30, 2023 · Approved

Everything planned in Eglinton-Lawrence

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.