The City of Toronto has 35 building permits since 2017 (3 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Fire and security upgrade · Sprinklers

    To provide a new above ground feed main to feed all sprinkler systems in the south building fromKipling Ave.

    Applied Jun 13, 2024 · issued Nov 14, 2025 · Permit 24 164072 FSU

    Permit issued
  • Designated structure · Sign building permit related

    Application for a permit to erect and display two illuminated wall signs.*****CINESPACE STUDIOS*****

    Applied Aug 2, 2023 · completed Aug 17, 2023 · Permit 23 169981 DST

    Cancelled
  • Drains and site services · Site service

    Stormwater pipe replacement and manhole replacement

    Applied Apr 11, 2023 · issued Jul 17, 2023 · Permit 23 132442 STS

    Inspections under way
  • Plumbing · Backflow prevention devices (Water only)

    Installation of (two) fire water back flow preventers in south building and in north building

    Applied Dec 9, 2021 · issued Jan 13, 2022 · completed May 4, 2022 · Permit 21 246793 PSA

    Closed
  • Plumbing

    REV #01-RELOCATE RAIN WATER LEADERPlumbing - Proposal to keep existing wall and roof, create a drive-through, build a storage space on either side for adjacent units.

    Applied Feb 5, 2021 · issued Mar 9, 2021 · completed Apr 12, 2021 · Permit 16 109132 PLB (revision 01)

    Closed
  • Addition or alteration · Multiple projects

    Revision 01 - New roof top units additionsProposal to keep existing wall and roof, create a drive-through, build a storage space on either side for adjacent units (Buildings A and B). The site is occupied by existing film studios created under Building Permit 10-248339 BLD

    Applied Nov 30, 2020 · issued Jan 18, 2021 · completed Jul 20, 2021 · Permit 16 109132 BLD (revision 01)

    Closed
  • Heating and ventilation

    Revision 01 - Add rooftop HVAC unit.HVAC - Proposal to keep existing wall and roof, create a drive-through, build a storage space on either side for adjacent units.

    Applied Nov 30, 2020 · issued Jan 18, 2021 · completed Jan 22, 2021 · Permit 16 109132 HVA (revision 01)

    Closed
  • Alternative solution

    This Alternative Solution proposes that the fire stopping system performs as good as, or better, than a fire separation with a minimum 2 hour fire resistance rating as required by Sentence 3.1.8.3.(4) of Division B for the continuity of a fire separation.The fire stop system consists of: Minimum 4 3/8" depth of mineral wool (min. 4 pcf density) compressed 42% in the direction of the expansion joint gap, recessed to accommodate required thickness of fill material.Minimum 1/8" wet thickness Hilti CFS-SP WB Fire stop Joint Spray to completely cover mineral wool,overlapping minimum 1/2" onto edge…

    Applied May 25, 2019 · completed Jun 27, 2019 · Permit 19 159538 ALT

    Approved
  • Heating and ventilation

    Rev 01: Revision to the building and mechanical drawings as per the bubbled area HVAC - Proposal to construct new one storey film studio addition

    Applied Mar 14, 2019 · issued Jun 8, 2020 · completed Dec 8, 2020 · Permit 17 252314 HVA (revision 01)

    Closed
  • Addition or alteration · Addition(s)

    Rev 01: Revision to the building and mechanical drawings as per the bubbled areaProposal to construct new one storey film studio addition

    Applied Mar 14, 2019 · issued Jun 8, 2020 · completed Jan 24, 2021 · Permit 17 252314 BLD (revision 01)

    Closed
  • Drains and site services · Site service

    Site servicing in connection to new one storey film studio addition, file 17-252314.

    Applied Nov 14, 2018 · issued Mar 7, 2019 · completed Apr 22, 2021 · Permit 18 256561 STS

    Closed
  • Heating and ventilation

    HVAC - Proposal to construct interior alterations to existing film studio including a new elevator and universal washroom.

    Applied Aug 14, 2018 · issued Aug 29, 2018 · completed Sep 23, 2020 · Permit 18 193562 HVA

    Closed
Show 23 more permits
  • Addition or alteration · Interior alterations

    Proposal to construct interior alterations to existing film studio including a new elevator and universal washroom.

    Applied Jul 13, 2018 · issued Aug 29, 2018 · completed Apr 19, 2021 · Permit 18 193562 BLD

    Closed
  • Plumbing

    Plumbing - Proposal to construct interior alterations to existing film studio including a new elevator and universal washroom.

    Applied Jul 13, 2018 · issued Aug 29, 2018 · completed Sep 23, 2020 · Permit 18 193562 PLB

    Closed
  • Plumbing

    Plumbing - Proposal to construct new one storey film studio addition

    Applied Oct 24, 2017 · issued Jan 8, 2018 · completed Oct 2, 2020 · Permit 17 252314 PLB

    Closed
  • Heating and ventilation

    HVAC - Proposal to construct new one storey film studio addition

    Applied Oct 24, 2017 · issued Jan 8, 2018 · completed Dec 8, 2020 · Permit 17 252314 HVA

    Closed
  • Addition or alteration · Addition(s)

    Proposal to construct new one storey film studio addition

    Applied Oct 24, 2017 · issued Jan 8, 2018 · completed Jan 24, 2021 · Permit 17 252314 BLD

    Closed
  • Drains and site services · Site service

    Connect existing sanitary line to new sanitary manhole

    Applied May 18, 2017 · issued May 31, 2017 · completed Apr 20, 2021 · Permit 17 162781 STS

    Closed
  • Plumbing · Backflow prevention devices (Water only)

    Proposal to install 1 backflow prevention device.

    Applied May 19, 2016 · issued Apr 13, 2017 · completed Apr 20, 2021 · Permit 16 158259 PSA

    Closed
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - Proposal to keep existing wall and roof, create a drive-through, build a storage space on either side for adjacent units (Buildings A and B). The site is occupied by existing film studios created under Building Permit 10-248339 BLD

    Applied Mar 7, 2016 · completed Apr 28, 2017 · Permit 16 109132 FSU

    Closed
  • Heating and ventilation

    HVAC - Proposal to keep existing wall and roof, create a drive-through, build a storage space on either side for adjacent units.

    Applied Jan 27, 2016 · issued Mar 7, 2016 · completed Jan 22, 2021 · Permit 16 109132 HVA

    Closed
  • Addition or alteration · Multiple projects

    Proposal to keep existing wall and roof, create a drive-through, build a storage space on either side for adjacent units (Buildings A and B). The site is occupied by existing film studios created under Building Permit 10-248339 BLD

    Applied Jan 27, 2016 · issued Mar 7, 2016 · completed Jul 20, 2021 · Permit 16 109132 BLD

    Closed
  • Plumbing

    Plumbing - Proposal to keep existing wall and roof, create a drive-through, build a storage space on either side for adjacent units.

    Applied Jan 27, 2016 · issued Mar 7, 2016 · completed Apr 12, 2021 · Permit 16 109132 PLB

    Closed
  • Plumbing · Backflow prevention devices (Water only)

    Proposal to install 1 backflow prevention device in an existing Television Studio.

    Applied Mar 27, 2015 · issued Apr 1, 2015 · completed Jan 28, 2021 · Permit 15 133187 PSA

    Closed
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - Proposal to construct side vestibule addition, interior alteration, front steps and ramp.

    Applied May 9, 2013 · issued Aug 20, 2021 · completed Aug 20, 2021 · Permit 13 128474 FSU

    Closed
  • Heating and ventilation

    HVAC - Proposal to construct side vestibule addition, interior alteration, front steps and ramp.

    Applied Mar 5, 2013 · issued May 13, 2013 · completed Jan 30, 2021 · Permit 13 128474 HVA

    Closed
  • Plumbing

    Plumbing - Proposal to construct side vestibule addition, interior alteration, front steps and ramp.

    Applied Mar 5, 2013 · issued May 13, 2013 · completed Jan 26, 2021 · Permit 13 128474 PLB

    Closed
  • Addition or alteration · Multiple projects

    Proposal to construct side vestibule addition, interior alteration, front steps and ramp.

    Applied Mar 5, 2013 · issued May 13, 2013 · completed May 14, 2021 · Permit 13 128474 BLD

    Closed
  • Plumbing · Backflow prevention devices (Water only)

    Install (1) backflow preventer to film studio, basement water meter room

    Applied Apr 20, 2012 · issued Jun 28, 2012 · completed Jan 26, 2021 · Permit 12 157794 PSA

    Closed
  • Plumbing

    Plumbing - Revision 01: Add (4) washrooms at Grid area I6. Proposal to demolish mid-section of existing industrial building, to construct two new exterior walls for buildings "A" and "B" and interior alteration of building "B" to be used as film studio.

    Applied Apr 27, 2011 · issued May 9, 2011 · completed Jan 28, 2021 · Permit 10 248339 PLB (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Revision 01: New ductwork and install (2) additional HVAC units to ancillary space/wardrobe. Proposal to demolish mid-section of existing industrial building, to construct two new exterior walls for buildings "A" and "B" and interior alteration of building "B" to be used as film studio.

    Applied Apr 27, 2011 · issued May 9, 2011 · completed Dec 16, 2020 · Permit 10 248339 HVA (revision 01)

    Closed
  • Addition or alteration · Multiple projects

    Proposal to demolish mid-section of existing industrial building, to construct two new exterior walls for buildings "A" and "B" and interior alteration of building "B" to be used as film studio.

    Applied Aug 27, 2010 · issued Jan 5, 2011 · completed Jul 6, 2021 · Permit 10 248339 BLD

    Closed
  • Plumbing

    Plumbing - Proposal to demolish mid-section of existing industrial building, to construct two new exterior walls for buildings "A" and "B" and interior alteration of building "B" to be used as film studio.

    Applied Aug 27, 2010 · issued Jan 6, 2011 · completed Jan 28, 2021 · Permit 10 248339 PLB

    Closed
  • Heating and ventilation

    HVAC - Proposal to demolish mid-section of existing industrial building, to construct two new exterior walls for buildings "A" and "B" and interior alteration of building "B" to be used as film studio.

    Applied Aug 27, 2010 · issued Jan 6, 2011 · completed Dec 16, 2020 · Permit 10 248339 HVA

    Closed
  • Demolition

    Proposed demolition of (8) silos, (3) chimneys, roof vents and cat walk in the side yard of vacant industrial building.

    Applied Jun 24, 2010 · issued Jul 20, 2010 · completed May 14, 2021 · Permit 10 205539 DEM

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

None on file since 2017.

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.