Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

78 Government Rd

The City of Toronto has 5 building permits since 2017 (4 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - New forced air system for addition.

    Applied Mar 30, 2010 · issued Apr 19, 2010 · Permit 10 140739 HVA

    Inspections under way
  • Plumbing

    Plumbing - Proposed rear one storey addition, rear two storey addition, and partial second storey addition to existing two storey detached dwelling.

    Applied Mar 30, 2010 · issued Apr 19, 2010 · completed Jun 8, 2026 · Permit 10 140739 PLB

    Closed (dormant)
  • Small residential project · Addition(s)

    Proposed rear one storey addition, rear two storey addition, and partial second storey addition to existing two storey detached dwelling.

    Applied Mar 26, 2010 · issued Apr 19, 2010 · Permit 10 140739 BLD

    Inspections under way
  • Plumbing

    Plumbing - Interior alteration on ground floor of existing single family detached dwelling.

    Applied Aug 24, 2009 · issued Oct 19, 2009 · Permit 09 161243 PLB

    Inspections under way
  • Small residential project · Interior alterations

    Interior alteration on ground floor of existing single family detached dwelling.

    Applied Aug 21, 2009 · issued Oct 19, 2009 · Permit 09 161243 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 510 Prince Edward Dr N · Minor variance

    To construct a two-storey front addition that will include a new attached garage and a two-storey rear addition. A previous Committee of Adjustment Decision (A0604/21EYK) approved variances relating to front and side yard setbacks, platform and canopy encroachment, and driveway positioning.

    180 m away · filed Nov 28, 2025 · Approved

  • 40 Walford Rd · Minor variance

    To construct a second storey rear addition, a rear basement walkout, and to construct front and rear third storey dormer additions.

    210 m away · filed Jan 31, 2024 · Approved

  • 97 Dunedin Dr · Minor variance

    To construct a new attached garage along the north side of the dwelling, and a partial second storey addition.

    220 m away · filed Oct 31, 2023 · Approved

  • 99 Government Rd · Minor variance

    To construct a new detached dwelling with an attached garage and a ancillary structure (pool house) in the rear yard.

    160 m away · filed Jul 23, 2023 · Approved

  • 33 Thorndale Ave · Minor variance

    To construct a new detached dwelling with an attached garage.

    160 m away · filed Jul 5, 2022 · Approved

  • 510 Prince Edward Dr N · Minor variance

    To construct a two-storey south east addition, a two-storey rear addition, two one-storey rear additions, a one-storey north side addition and a hammerhead driveway.

    180 m away · filed Nov 23, 2021 · Approved

  • 106 Government Rd · Minor variance

    To construct two-storey front and rear additions, a new front porch, a rear yard deck and a basement walk out.

    190 m away · filed Oct 30, 2021 · Approved

  • 38 Government Rd · Minor variance

    To construct an east side second storey addition.

    220 m away · filed Aug 21, 2021 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.