Toronto address · Ward 17, Don Valley North
784 Sheppard Ave E
The City of Toronto has 9 building permits since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Designated structure · Sign building permit related
To erect and display a non-illuminated ground sign displaying static copy, erecting on southerly frontage of a retail store property, perpendicular to Sheppard Ave. The proposed sign contains two sign faces, each sign face measuring 0.95 metres vertically by 0.74 metres horizontally at a height of 1.2 metres. Has an approved variance #18-174461****MEC ****
Applied May 17, 2018 · issued Aug 17, 2018 · completed Apr 5, 2019 · Permit 18 160470 DST
- Application received
Alternative solution
The forcemain leaving the rainwater sump pit for the ramp is proposed to be in stainless steel. The 2012 Ontario Building Code does not mention stainless steel to be acceptable for such an application. It is therefore requested to accept stainless steel as an acceptable material for forcemain drainage applications known for its better corrosion resistance compared to galvanized steel.
Applied Nov 18, 2016 · Permit 16 253433 ALT
- Closed
New building
Revision - partition layout change on the ground and second floors - Mountain Equipment Co-op
Applied Nov 16, 2016 · issued Feb 13, 2017 · completed Jul 24, 2025 · Permit 13 231262 BLD (revision 01)
- Closed
Designated structure · Sign building permit related
In conjunction with a two storey building on the premises, proposal to erect and display three illuminated wall signs displaying static copy on the second storey south, east and west elevations. The proposed wall signs are 4.26 metres vertically by 4.26 metres horizontally at a height of 10.33 metres above grade. Already approved by variance # 16-185190.**MEC**
Applied Oct 13, 2016 · issued Oct 17, 2016 · completed Jul 24, 2019 · Permit 16 237086 DST
- Closed
Heating and ventilation
HVAC - Two storey retail building with two levels of underground parking - Mountain Equipment Co-op
Applied Jul 31, 2015 · issued Aug 23, 2016 · completed Jul 22, 2025 · Permit 13 231262 HVA
- Closed
Plumbing
Plumbing - Two storey retail building with two levels of underground parking - Mountain Equipment Co-op
Applied Jun 1, 2015 · issued Jul 7, 2015 · completed Oct 28, 2020 · Permit 13 231262 PLB
- Closed
Demolition
Demolition of one storey retail store and attached open wood frame portion at rear - Sheridan Nursery
Applied Oct 8, 2013 · issued Dec 4, 2013 · completed Jan 30, 2017 · Permit 13 247629 DEM
- Closed
New building
Two storey retail building with two levels of underground parking - Mountain Equipment Co-op
Applied Sep 5, 2013 · issued Aug 23, 2016 · completed Jul 24, 2025 · Permit 13 231262 BLD
- Closed
Addition or alteration · Canopy w/o enclosure
Cover existing mansard roof.
Applied Aug 5, 2003 · issued Aug 22, 2003 · completed May 7, 2020 · Permit 03 163522 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
49 storeys · 1,184 homes · Residential
120 m away · Rezoning · Under review · filed Mar 17, 2022
- Under review
63-75 Ethennonnhawahstihnen' Lane and 1001 Sheppard Avenue East
39 storeys · 867 homes · Mixed use
190 m away · Site plan · Under review · filed Mar 25, 2024
- Approved
1001-1019 Sheppard Avenue East
31 storeys · 990 homes · Residential
230 m away · Condominium · Approved · filed May 29, 2025
- Under appeal
32 storeys · 705 homes · Mixed use
270 m away · Rezoning · Under appeal · filed Oct 14, 2022
- Under review
48 storeys · 1,238 homes · Mixed use
370 m away · Site plan · Under review · filed Mar 21, 2024
- Under review
37 storeys · 789 homes · Residential
390 m away · Rezoning · Under review · filed May 7, 2026
Neighbours’ Committee of Adjustment files within 250 m
1009 Sheppard Ave E · Consent
To permit non-exclusive easements for pedestrian and vehicular access over portions of Canadian Tire Corporation (CTC) land, and Canadian Tire Properties Inc. (CTPI) land, in favour of the Concord site (25, 35, 55, 65 and 75 Billes Heights and 18, 20, 28, 32, 38, 62 and 68 Esther Shiner Boulevard). Related planning files (Concord site). Related planning files include A0670/20NY, and 19 155827 NY 17 SA.
150 m away · filed Feb 16, 2022 · Approved
1001 Sheppard Ave E · Minor variance
A mixed use building with three towers (19, 31 and 27 storeys) and a total gross floor area of 82,241.56 sq.m. 990 dwelling units, 754 bicycle parking spaces, 1,079 parking spaces and 3 loading space are proposed.
100 m away · filed Dec 15, 2020 · Approved
21 Arrowstook Rd · Minor variance
To construct a new dwelling.
240 m away · filed Mar 1, 2019 · Approved
1001 Sheppard Ave E · Minor variance
To legalize and maintain the existing undersized underground parking spaces.
100 m away · filed Dec 6, 2018 · Approved
1001 Sheppard Ave E · Minor variance
To construct two towers of 33 and 36 storeys linked by a podium containing lobby and amenity space together with townhouse units, total 692 dwelling units and 674 parking spaces.
100 m away · filed Jun 29, 2017 · Approved
23 Burbank Dr · Minor variance
To construct a new two-storey dwelling. The existing dwelling would be demolished.
160 m away · filed Jun 12, 2017 · Approved
780 Sheppard Ave E · Minor variance
The proposal is to permit a stacked townhouse development at the rear of the site. Please be advised the subject property went before the Committee of Adjustment on July 23, 2014, DEFERRED SINE DIE in order to allow the applicant an opportunity to resolve the issues regarding the ownership of a portion of the east lot line.
100 m away · filed May 29, 2014 · Refused
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.