Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 8, Eglinton-Lawrence

79 Alexandra Blvd

The City of Toronto has 7 building permits since 2017 (2 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    Hvac - storey front and rear addition, 3-storey side addition and interior alterations to existing detached sfd and finished basement

    Applied Feb 25, 2025 · issued Mar 4, 2025 · completed Sep 10, 2026 · Permit 24 231198 HVA

    Closed
  • Plumbing

    Plumbing - STOREY FRONT AND REAR ADDITION, 3-STOREY SIDE ADDITION AND INTERIOR ALTERATIONS TO EXISTING DETACHED SFD AND FINISHED BASEMENT

    Applied Oct 25, 2024 · issued Nov 21, 2024 · completed Sep 10, 2026 · Permit 24 231198 PLB

    Closed
  • Drains and site services

    Drain - STOREY FRONT AND REAR ADDITION, 3-STOREY SIDE ADDITION AND INTERIOR ALTERATIONS TO EXISTING DETACHED SFD AND FINISHED BASEMENT

    Applied Oct 25, 2024 · issued Nov 21, 2024 · Permit 24 231198 DRN

    Inspections under way
  • Small residential project · Other

    Storey front and rear addition, 3-storey side addition and interior alterations to existing detached sfd and finished basement

    Applied Oct 25, 2024 · issued Nov 21, 2024 · Permit 24 231198 BLD

    Inspections under way
  • Plumbing

    Plumbing - Propsed ground and second floor additions (96.41sm) and interior alterations (355.21sm) to existing detached house.

    Applied Aug 18, 2023 · issued Jul 4, 2024 · completed Jul 31, 2025 · Permit 23 190792 PLB

    Closed
  • Small residential project · Multiple projects

    Propsed ground and second floor additions (96.41sm) and interior alterations (355.21sm) to existing detached house.

    Applied Aug 18, 2023 · issued Sep 14, 2023 · completed Sep 11, 2026 · Permit 23 190792 BLD

    Closed
  • Small residential project · Addition(s)

    Construct sunroom addition at rear of dwelling

    Applied Oct 3, 2008 · issued Oct 3, 2008 · completed Sep 10, 2026 · Permit 08 210036 BLD

    Cancelled

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    Proposal to extend ground and second floor, with interior alterations.

    Decision: Approved (hearing May 25, 2023)

    Filed Apr 4, 2023 · File A0205/23NY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 84 Alexandra Blvd · Minor variance

    To construct a one storey rear addition to the existing dwelling.

    50 m away · filed Mar 3, 2026 · Approved

  • 83 Glengrove Ave W · Minor variance

    To construct a covered terrace at the rear of the existing dwelling.

    240 m away · filed Oct 17, 2025 · Approved

  • 57 Lytton Blvd · Minor variance

    Proposal to demolish existing single family dwelling and construct a new 4-unit multiplex building.

    130 m away · filed Apr 25, 2025 · Approved

  • 33 Lytton Blvd · Minor variance

    To construct an inground pool in the rear yard.

    170 m away · filed Apr 25, 2025 · Approved

  • 131 Glencairn Ave · Minor variance

    To construct a new dwelling.

    220 m away · filed Nov 8, 2024 · Approved

  • 64 Alexandra Blvd · Minor variance

    To construct a new 2 storey dwelling.

    70 m away · filed Jun 25, 2024 · Approved

  • 71 Alexandra Blvd · Minor variance

    To construct a new detached dwelling and a garden suite

    30 m away · filed Apr 26, 2024 · Approved

  • 83 Lytton Blvd · Minor variance

    Proposal to construct a new dwelling.

    110 m away · filed Oct 30, 2023 · Approved

Everything planned in Eglinton-Lawrence

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.