Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 15, Don Valley West

79 Randolph Rd

The City of Toronto has 6 building permits since 2017 (3 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services · Back water valve (Sewer only)

    Proposed back water valve

    Applied Feb 8, 2021 · issued Feb 11, 2021 · completed Feb 19, 2021 · Permit 21 114191 DRN

    Closed
  • Drains and site services · Back water valve (Sewer only)

    Proposed back water valve

    Applied Oct 22, 2020 · completed Nov 3, 2020 · Permit 20 209981 DRN

    Cancelled
  • Drains and site services

    Drain - Second Storey addition and ground floor addition

    Applied May 15, 2008 · issued May 15, 2008 · completed Aug 25, 2026 · Permit 08 114941 DRN

    Closed
  • Heating and ventilation

    HVAC - Second Storey addition and ground floor addition

    Applied Apr 14, 2008 · issued May 15, 2008 · Permit 08 114941 HVA

    Inspections under way
  • Small residential project · Multiple projects

    Second Storey addition and ground floor addition

    Applied Feb 27, 2008 · issued Apr 2, 2008 · Permit 08 114941 BLD

    Inspections under way
  • Plumbing

    Plumbing - Second Storey addition and ground floor addition

    Applied Feb 27, 2008 · issued Apr 2, 2008 · Permit 08 114941 PLB

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 922 Millwood Road

    7 storeys · 44 homes · Residential

    150 m away · Rezoning · Refused · filed Sep 19, 2025

    Refused
  • 126-132 Laird Drive

    8 storeys · 143 homes · Residential

    300 m away · Condominium · Under review · filed Oct 8, 2021

    Under review
  • 134 Laird Drive

    8 storeys · 106 homes · Residential

    380 m away · Condominium · Under review · filed Oct 8, 2021

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 51 Laird Dr · Minor variance

    To permit private and public recreation facilities use, as a proposed indoor golf simulator facility.

    150 m away · filed May 27, 2026 · Approved

  • 2 Malcolm Rd · Minor variance

    To alter the existing detached dwelling by converting the existing attic space into habitable space.

    30 m away · filed Aug 7, 2025 · Approved

  • 108 Randolph Rd · Minor variance

    To construct a new two-storey detached dwelling with an integral garage and rear covered deck.

    60 m away · filed Jun 13, 2025 · Approved

  • 81 Randolph Rd · Minor variance

    To construct a two-storey and second storey addition to the existing dwelling, in conjunction with other interior and exterior alterations.

    10 m away · filed Nov 6, 2024 · Approved

  • 7 Malcolm Rd · Minor variance

    To alter the existing detached dwelling with a one storey addition at the front of the dwelling and a two-storey addition at the rear and east side of the existing dwelling.

    90 m away · filed Nov 6, 2024 · Approved

  • 68 Laird Dr · Minor variance

    To construct a semi-detached multi-unit dwelling

    100 m away · filed Aug 29, 2024 · Approved

  • 70 Laird Dr · Minor variance

    To construct a semi-detached multi-unit dwelling

    110 m away · filed Aug 29, 2024 · Approved

  • 109 Randolph Rd · Minor variance

    Proposed replacement of the existing detached garage with a new detached carport and the construction of a shed in the back yard in conjunction with new landscaping.

    100 m away · filed Aug 14, 2024 · Approved

Everything planned in Don Valley West

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.