Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

791 Islington Ave

The City of Toronto has 7 building permits since 2017 (6 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Fire and security upgrade · Electromagnetic locks

    Install one maglock on ground floor

    Applied Jul 6, 2023 · issued Jul 17, 2023 · Permit 23 170456 FSU

    Inspections under way
  • Addition or alteration · Interior alterations

    Rev 01 - Door N-130 relocated to the top of the corridor, ADO added to door N-130, Maglock and push to exit device relocated to new location of door N-130, door to copy room relocated, clear opening provided in place of original door location,Proposed accessibility upgrades to existing police station

    Applied Nov 15, 2022 · issued Dec 9, 2022 · Permit 21 198171 BLD (revision 01)

    Revision issued
  • Plumbing

    Plumbing - Proposed accessibility upgrades to existing police station

    Applied Aug 13, 2021 · issued Oct 6, 2021 · Permit 21 198171 PLB

    Inspections under way
  • Addition or alteration · Interior alterations

    Proposed accessibility upgrades to existing police station

    Applied Aug 13, 2021 · issued Sep 8, 2021 · Permit 21 198171 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposed accessibility upgrades to existing police station

    Applied Aug 13, 2021 · issued Oct 6, 2021 · Permit 21 198171 HVA

    Inspections under way
  • Plumbing · Backflow prevention devices (Water only)

    Install 1 backflow prevention device (water only)

    Applied Nov 30, 2015 · issued Dec 8, 2015 · Permit 15 258545 PSA

    Permit issued
  • Fire and security upgrade · Electromagnetic locks

    Installation of 6 electromagnetic locks to an office area of Police Station.

    Applied Nov 10, 2005 · issued Nov 29, 2005 · completed Dec 5, 2018 · Permit 05 201613 FSU

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 404 Melrose St · Minor variance

    To construct a detached dwelling with an integral garage.

    220 m away · filed Apr 28, 2023 · Approved

  • 189 Hay Ave · Consent

    To obtain consent to sever the property into two undersized residential lots.

    110 m away · filed Nov 30, 2021 · Approved

  • 189 Hay Ave · Minor variance

    To construct a new detached dwelling with an attached garage.

    110 m away · filed Nov 30, 2021 · Approved

  • 189 Hay Ave · Minor variance

    To construct a new detached dwelling with an attached garage.

    110 m away · filed Nov 30, 2021 · Approved

  • 145 Evans Ave · Minor variance

    Proposal to maintain the existing 2 storey commercial building on newly severed lot.See also 20 185150 CO.

    160 m away · filed Oct 27, 2020 · Application withdrawn

  • 811 Islington Ave · Minor variance

    Proposal to maintain the existing 2 storey commercial building on newly severed lot.See also 20 185150 CO.

    130 m away · filed Sep 16, 2020 · Application withdrawn

  • 145 Evans Ave · Consent

    To obtain consent to sever the property into two properties and to create easements/right-of-way.

    160 m away · filed Aug 25, 2020 · Approved

  • 177 Hay Ave · Minor variance

    To construct a new detached dwelling with an attached garage.

    160 m away · filed Mar 13, 2017 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.