Toronto address · Ward 9, Davenport
8 Frankish Ave
The City of Toronto has 3 building permits since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Plumbing
Plumbing - Proposal for addition of Beam in ground floor and replacement of beam in the basement. Replacement of Front window and patio door in the rear-yard.
Applied Jun 13, 2024 · issued Jun 21, 2024 · Permit 24 164591 PLB
- Closed
Small residential project · Interior alterations
Proposal for addition of Beam in ground floor and replacement of beam in the basement. Replacement of Front window and patio door in the rear-yard.
Applied Jun 13, 2024 · issued Jun 21, 2024 · completed Mar 26, 2025 · Permit 24 164591 BLD
- Cancelled
Small residential project · Interior alterations
Proposal for addition of Beam in ground floor and replacement of beam in the basement. Replacement of Front window and patio door in the rear-yard.
Applied May 3, 2024 · completed May 9, 2024 · Permit 24 143682 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
8 storeys · 57 homes · Mixed use
220 m away · Site plan · Under review · filed Feb 15, 2023
- Under review
1-3 Boland Lane and 646-648 Dufferin Street
8 storeys · 135 homes · Residential
250 m away · Condominium · Under review · filed Oct 12, 2021
- Under review
18 storeys · 176 homes · Mixed use
380 m away · Site plan · Under review · filed Jun 30, 2025
Neighbours’ Committee of Adjustment files within 250 m
15 Wyndham St · Minor variance
To construct a one-storey ancillary building (art workshop), including a green roof, in the rear yard (abutting Mechanic Avenue).
210 m away · filed Jul 31, 2026 · Hearing scheduled
118 Sheridan Ave · Minor variance
To construct a new two-storey detached ancillary building (for the purpose of a lounge and storage area on the ground level, and a loft on the second level), in the rear yard of the existing two-and-one-half-storey townhouse dwelling. This ancillary building will not be used for habitable space. The existing ancillary building in the rear yard will be demolished.
160 m away · filed May 30, 2025 · Approved
1498 Dundas St W · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-law 953-2021), for a new 8-storey mixed-use building, by increasing the gross floor area, and portions of the building heights, and by reducing the number of residential parking spaces. There will be a total of 62 residential dwelling units on this lot.
230 m away · filed Feb 21, 2025 · Approved
11 Bank St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing one and two-storey rear additions.
150 m away · filed Oct 24, 2024 · Approved
6 Delaney Cres · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a side (east) three-storey addition and a third storey addition, a rear second storey balcony and a rear third storey balcony.
210 m away · filed Nov 30, 2022 · Approved
114 Sheridan Ave · Minor variance
To alter the existing three-storey townhouse dwelling by constructing a rear second and third storey addition.
140 m away · filed Nov 24, 2022 · Approved
68 Florence St · Minor variance
To alter the existing two-unit, two-and-one-half-storey townhouse by constructing a rear second storey addition and a new basement secondary suite.
230 m away · filed Oct 7, 2022 · Approved
25 Gordon St · Minor variance
To alter the existing two-storey townhouse dwelling by constructing a two-storey rear addition, a complete third storey addition, a new front porch and basement walkout, a rear third storey balcony, second and third storey front bay windows, and a side (west) basement walkout.
220 m away · filed Sep 15, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.