Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

80 Wiltshire Ave

The City of Toronto has 2 building permits since 2017 (2 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - new floor drain in laundry roomProposal for multiple projects to an existing 2 storey SFD-semi dwelling. Scope of work includes a rear basement walkout, new below grade addition under the front porch and a front basment walkout.

    Applied Feb 21, 2018 · issued Mar 26, 2018 · Permit 18 119839 PLB

    Inspections under way
  • Small residential project · Multiple projects

    Proposal for multiple projects to an existing 2 storey SFD-semi dwelling. Scope of work includes a rear basement walkout, new below grade addition under the front porch and a front basment walkout.

    Applied Feb 21, 2018 · issued Mar 26, 2018 · Permit 18 119839 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 1859 Davenport Rd · Minor variance

    To construct a new three-storey mixed-use building with three rooftop mezzanines and three rooftop terraces. There will be a total of one commercial unit (located on the first level), and eight residential dwelling units on this lot (two units occupying the basement and first levels, three units occupying the second level, and three units occupying the third level).

    140 m away · filed Mar 13, 2026 · Approved

  • 1871 Davenport Rd · Minor variance

    To alter the existing one-storey building by constructing complete second, third, and fourth storey additions, and a rear fourth storey terrace. This building will be converted into a mixed-use building for a total of 10 residential dwelling units and retail uses on this lot.

    150 m away · filed Aug 27, 2024 · Approved

  • 534 Perth Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a two-storey north side and rear addition, a complete third storey addition with a walkout rooftop deck, a covered front porch with a walkout basement, a front second floor balcony, and a rear ground level covered deck.

    190 m away · filed Jan 5, 2023 · Approved

  • 1859 Davenport Rd · Minor variance

    To alter the existing two-storey semi-detached mixed-use building by reconstructing the first and second floors; constructing a third floor addition and a rear three-storey addition. The ground floor will be used for retail purposes and the second and third floor will contain two residential units each (total of four units).

    140 m away · filed Feb 4, 2020 · Approved

  • 516 Perth Ave · Minor variance

    To convert the basement of the existing two-storey detached dwelling into a secondary suite with front and rear basement walkouts and to construct a front two-storey addition with a front porch, a rear second storey addition with a balcony, a new rear yard deck, and a new rear detached two-car garage.

    200 m away · filed Dec 27, 2018 · Approved

  • 1859 Davenport Rd · Minor variance

    To construct a three-storey rear addition and a third floor addition. The proposed uses will include retail on the ground floor and residential on the second and third floor.

    140 m away · filed Sep 7, 2012 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.