Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 21, Scarborough Centre

806 Kennedy Rd

The City of Toronto has 11 building permits since 2017 (4 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation · Alter: Boiler/Furnace/AC replacement

    Proposal to remove aging space heating and domestic water heating boilers. Replace with new high-efficieny boilers

    Applied Mar 4, 2024 · issued Mar 8, 2024 · Permit 24 121471 MSA

    Permit issued
  • Addition or alteration · Interior alterations

    REV 02: Revision to 22 143273 BLD 00 BA Change of location of barrier free spot only.Revision 01: revisions to A2.06, A2.07, A4.01Conversion of existing garages and lockers to residential suite in basement and ground floor, including amenities and site improvements. (9 new units)

    Applied Nov 17, 2023 · issued Dec 5, 2023 · completed Jul 9, 2026 · Permit 22 143273 BLD (revision 02)

    Closed
  • Addition or alteration · Interior alterations

    Revision 01: revisions to A2.06, A2.07, A4.01Conversion of existing garages and lockers to residential suite in basement and ground floor, including amenities and site improvements. (9 new units)

    Applied Jan 4, 2023 · issued Mar 17, 2023 · completed Jul 9, 2026 · Permit 22 143273 BLD (revision 01)

    Closed
  • Plumbing

    Plumbing - Conversion of existing garages and lockers to residential suite in basement and ground floor, including amenities and site improvements. (9 new units)

    Applied May 6, 2022 · issued Sep 14, 2022 · completed Jan 30, 2026 · Permit 22 143273 PLB

    Closed
  • Addition or alteration · Interior alterations

    Conversion of existing garages and lockers to residential suite in basement and ground floor, including amenities and site improvements. (9 new units)

    Applied May 6, 2022 · issued Sep 14, 2022 · completed Jul 9, 2026 · 9 homes added · Permit 22 143273 BLD

    Closed
  • Drains and site services

    Drain - Conversion of existing garages and lockers to residential suite in basement and ground floor, including amenities and site improvements. (9 new units)

    Applied May 6, 2022 · issued Sep 14, 2022 · completed Jan 30, 2026 · Permit 22 143273 DRN

    Closed
  • Heating and ventilation

    HVAC - Conversion of existing garages and lockers to residential suite in basement and ground floor, including amenities and site improvements. (9 new units)

    Applied May 6, 2022 · issued Sep 14, 2022 · completed Jan 30, 2026 · Permit 22 143273 HVA

    Closed
  • Addition or alteration · Multiple projects

    repair to front & exterior elevation, balcony repair, landscape improvements

    Applied Jul 23, 2021 · issued Nov 26, 2021 · Permit 21 188956 BLD

    Permit issued
  • Addition or alteration · Interior alterations

    Repairs to existing exit lobby for compliance with the OBC

    Applied May 30, 2019 · issued Jun 6, 2019 · completed Mar 4, 2021 · Permit 19 162855 BLD

    Closed
  • Addition or alteration · Multiple projects

    New fire separation between lobby elevator and elevator space, as well as exterior for stair

    Applied Jul 8, 2016 · issued Oct 17, 2016 · Permit 16 187345 BLD

    Inspections under way
  • Plumbing · Backflow prevention devices (Water only)

    install 1 backflow preventer

    Applied Mar 17, 2011 · issued Mar 18, 2011 · Permit 11 147270 PSA

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To add vehicle and bicycle parking spaces with exterior alterations to the landscape. To convert existing storage, laundry and parking to residential suites with interior alterations.

    Decision: Approved (hearing Dec 8, 2021)

    Filed Apr 30, 2021 · File A0175/21SC

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 819 Kennedy Rd · Minor variance

    To alter the existing 6-storey apartment building by converting existing garage and storage space to create 5 additional dwelling units located on the ground floor, third floor, fourth floor and sixth floor.

    140 m away · filed Oct 1, 2025 · Approved

  • 2428 Eglinton Ave E · Consent

    To obtain consent to create an easement/right-of-way. Cross-reference Consent Applications B0012/25SC and B0013/25SC.

    130 m away · filed Mar 7, 2025 · Approved

  • 2432 Eglinton Ave E · Consent

    To obtain consent to create an easement/right-of-way. Cross-reference Consent Applications B0011/25SC and B0012/25SC.

    240 m away · filed Mar 7, 2025 · Approved

  • 2430 Eglinton Ave E · Consent

    To obtain consent to create an easement/right-of-way. Cross-reference Consent Applications B0011/25SC and B0013/25SC.

    190 m away · filed Mar 7, 2025 · Approved

  • 6 Rensburg Dr · Minor variance

    To demolish the existing dwelling and to construct a new two storey detached dwelling.

    170 m away · filed Jul 29, 2024 · Approved

  • 807 Kennedy Rd · Minor variance

    Interior renovations to add 5 dwelling units to the existing 5-storey building. This application was previously deferred at the June 5th, 2024 hearing.

    110 m away · filed Mar 26, 2024 · Approved

  • 43 Rensburg Dr · Minor variance

    To construct a new two-storey detached dwelling with integral garage.

    160 m away · filed Jun 27, 2021 · Approved

  • 51 Rensburg Dr · Minor variance

    To construct a new two-storey detached dwelling with integral garage.

    200 m away · filed Jun 25, 2021 · Approved

Everything planned in Scarborough Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.