Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 12, Toronto-St. Paul's

808 Mount Pleasant Rd

The City of Toronto has 6 building permits since 2017 (3 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Fire damage

    PROPOSED: To repair fire damages. Unit 1006

    Applied Aug 9, 2023 · issued Aug 11, 2023 · Permit 23 186070 BLD

    Inspections under way
  • Addition or alteration · Other

    Partial demolition of building and alterations for remaining building to remain operational

    Applied Mar 3, 2023 · issued May 11, 2023 · Permit 23 119835 BLD

    Permit issued
  • Fire and security upgrade · Fire alarm

    Proposal for fire alarm replacement/upgrade per code consultants report.

    Applied Jun 22, 2021 · issued Jul 16, 2021 · Permit 21 174021 FSU

    Permit issued
  • Addition or alteration · Interior alterations

    Ground floor security upgrades. Installation of a new overhead coiling door, metal fencing and intercom at parking garage entrance, P1

    Applied Oct 8, 2020 · issued Oct 14, 2020 · completed Apr 22, 2021 · Permit 20 204304 BLD

    Closed
  • Fire and security upgrade · Electromagnetic locks

    Electromagnetic maglock and intercom at main building entrance

    Applied Oct 8, 2020 · issued Oct 15, 2020 · completed May 28, 2021 · Permit 20 204330 FSU

    Closed
  • Addition or alteration · Other

    Proposed to install platform over a outdoor swimming pool on third floor to existing Hotel.

    Applied Aug 22, 2020 · issued Sep 3, 2020 · completed Nov 3, 2020 · Permit 20 184243 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Consent · Lot addition

    To obtain consent to sever a portion of the land for the purpose of a lot addition.

    Decision: Approved (hearing Feb 15, 2023)

    Filed Nov 15, 2022 · File B0082/22TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 55 Brownlow Ave · Consent

    To obtain consent to sever the lot into two residential lots and to create new easements/rights-of-way.

    250 m away · filed Jan 20, 2025 · Approved

  • 117 Broadway Ave · Minor variance

    To permit 21 undersized parking spaces within the existing 39-storey building (North Tower) and the 38-storey building (South Tower) on this lot (as approved under Site Specific By-Law 974-2020(LPAT), and as amended by Minor Variance Decision Number A1140/22TEY), which is currently under construction. There will be a total of 258 parking spaces on-site (246 residential parking spaces and 12 visitor parking spaces).

    230 m away · filed Oct 3, 2024 · Approved

  • 127 Broadway Ave · Minor variance

    To alter the existing development standards as approved under Site Specific Zoning By-laws 973-2020 (LPAT) and 974-2020 (LPAT), by reducing the amount of visitor parking spaces from 32 spaces to 12 spaces.

    180 m away · filed Feb 12, 2024 · Approved

  • 117 Broadway Ave · Minor variance

    To alter the redevelopment plan for the 37-storey building (North Tower) and the 34-storey building (South Tower) on the lot, approved under Site Specific By-Law 974-2020(LPAT), by increasing the height; increasing the number of storeys; increasing the total gross floor area; and, increasing the total number of dwelling units to 1,010 units. A total of 101 short-term bicycle parking spaces will be provided on-site.

    230 m away · filed Oct 20, 2022 · Approved

  • 161 Eglinton Ave E · Consent

    To obtain consent to sever the property into three lots and to create various easements.

    200 m away · filed Apr 9, 2018 · Approved

  • 140 Redpath Ave · Consent

    To create a new easement/right-of-way.

    210 m away · filed Jul 19, 2016 · Approved

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.