Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

81 Eighth St

The City of Toronto has 5 building permits since 2017 (5 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    Proposal to demolish existing 1 storey frame addition and construct 2 storey frame addition and interior alterations

    Applied Mar 31, 2026 · issued Apr 21, 2026 · Permit 26 137136 BLD

    Permit issued
  • Drains and site services

    Drain - Proposal to demolish existing 1 storey frame addition and construct 2 storey frame addition and interior alterations

    Applied Mar 31, 2026 · issued Apr 21, 2026 · Permit 26 137136 DRN

    Permit issued
  • Plumbing

    Plumbing - Proposal to demolish existing 1 storey frame addition and construct 2 storey frame addition and interior alterations

    Applied Mar 31, 2026 · issued Apr 21, 2026 · Permit 26 137136 PLB

    Permit issued
  • Plumbing

    Plumbing - Proposal to construct a front 2 storey addition, rear 1 storey addition, re-build rear deck and new front wood steps to existing 2 storey sfd-detached

    Applied Jun 20, 2013 · issued Jul 5, 2013 · Permit 13 191617 PLB

    Inspections under way
  • Small residential project · Multiple projects

    Proposal to construct a front 2 storey addition, rear 1 storey addition, re-build rear deck and new front wood steps to existing 2 storey sfd-semi detached

    Applied Jun 20, 2013 · issued Jul 5, 2013 · Permit 13 191617 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 73 Tenth St · Minor variance

    To construct a one-storey rear addition and a new rear deck.

    190 m away · filed Dec 2, 2025 · Approved

  • 84 Tenth St · Minor variance

    To construct a second and third storey addition above the existing dwelling.

    240 m away · filed Apr 29, 2025 · Approved

  • 62 Seventh St · Minor variance

    To construct a new duplex with an attached garage.

    130 m away · filed Apr 11, 2025 · Refused

  • 69 Tenth St · Minor variance

    To construct a two-storey rear addition including a deck in the rear yard.

    200 m away · filed Aug 9, 2024 · Approved

  • 72 Seventh St · Minor variance

    To legalize and to maintain the existing building that is currently under construction by constructing a two-storey rear addition, a one-storey rear addition and to create a secondary suite.

    100 m away · filed May 29, 2024 · Approved

  • 62 Seventh St · Minor variance

    To construct a two-storey rear addition, a second storey addition above the existing dwelling and a second storey rear platform. A previous Committee of Adjustment application (A0119/23EYK) approved a variance related to floor space index.

    130 m away · filed May 21, 2024 · Approved

  • 72 Eighth St · Minor variance

    To construct a new detached garage in the rear yard.

    60 m away · filed Dec 21, 2023 · Approved

  • 69 Ninth St · Minor variance

    To construct an ancillary structure in the rear yard which will contain a detached garage and a garden suite.

    120 m away · filed May 29, 2023 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.