Toronto address · Ward 10, Spadina-Fort York
82 Massey St
The City of Toronto has 7 building permits since 2017 (1 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Small residential project · Multiple projects
Proposal to demolish an existing detached garage and build a new flat roof garage in its place.
Applied Aug 13, 2026 · issued Aug 19, 2026 · Permit 26 218961 BLD
- Cancelled
Small residential project · Multiple projects
Proposal to demolish an existing detached garage and build a new flat roof garage in its place.
Applied Aug 6, 2026 · completed Aug 11, 2026 · Permit 26 215290 BLD
- Cancelled
Small residential project · Garage
Proposal to construct a new detached garage.
Applied Jul 29, 2026 · completed Aug 4, 2026 · Permit 26 210760 BLD
- Closed
Small residential project · Addition(s)
Rev 01: Green roof added to roof of dwelling and porch
Applied May 1, 2022 · issued Jul 7, 2022 · completed May 26, 2023 · Permit 21 151865 BLD (revision 01)
- Closed
Heating and ventilation
HVAC - Proposal to construct a third storey addition to existing two-storey townhouse. **** See C of A Decision ****
Applied Jun 28, 2021 · issued Jun 30, 2021 · completed Apr 21, 2022 · Permit 21 151865 HVA
- Closed
Small residential project · Addition(s)
Proposal to construct a third storey addition to existing two-storey townhouse. **** See C of A Decision ****
Applied May 7, 2021 · issued Jun 24, 2021 · completed May 26, 2023 · Permit 21 151865 BLD
- Closed
Plumbing
Plumbing - Proposal to construct a third storey addition to existing two-storey townhouse.
Applied May 7, 2021 · issued Jun 24, 2021 · completed Apr 21, 2022 · Permit 21 151865 PLB
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To alter a two-storey townhouse by constructing a third storey addition.
Decision: Approved (hearing Mar 11, 2020)
Filed Dec 12, 2019 · File A1296/19TEY
What’s planned nearby
Development sites within 500 m
- Under review
13 storeys · Mixed use
210 m away · Site plan · Under review · filed Dec 24, 2021
- Under review
17 storeys · 227 homes · Mixed use
230 m away · Site plan · Under review · filed Sep 8, 2022
- Approved
938-950 King Street West and 95-99 Strachan Avenue
18 storeys · 229 homes · Mixed use
250 m away · Site plan · Approved · filed Aug 4, 2021
- Approved
801-805 Wellington Street West and 53 Strachan Avenue
28 storeys · 296 homes · Residential
440 m away · Rezoning · Approved · filed Mar 17, 2026
Neighbours’ Committee of Adjustment files within 250 m
860 Richmond St W · Minor variance
To convert the existing three-storey non-residential building (office uses) into a hotel building containing 62 rooms (basement level to third level), with a restaurant use located on the first level, and a gym within the basement level. Also, to alter the existing building by constructing a new front canopy, and two new interior stairwells and one new elevator for the purpose of rooftop access. There will be no parking spaces provided on-site.
150 m away · filed Sep 4, 2026 · Postponed
106 Massey St · Minor variance
60 m away · filed Aug 12, 2026 · Postponed
71 Crawford St · Minor variance
To alter the existing rear ancillary building (detached garage) by constructing a second storey addition (containing one laneway suite), with a portion of the ground floor retained for garage parking (one parking space). There will be a total of three residential dwelling units on this lot (two units within the main dwelling and one unit with the ancillary building).
60 m away · filed Nov 18, 2025 · Approved
69 Crawford St · Minor variance
To construct a new one-storey ancillary building (detached garage) abutting the lane, in the rear yard of the lot containing the exisitng two-and-one-half storey semi-detached dwelling. The existing detached garage will be demolished.
70 m away · filed Oct 3, 2025 · Approved
119 Shaw St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear second storey addition and to construct a new laneway suite (second floor) above existing garage in the rear yard.
250 m away · filed Jun 6, 2025 · Application withdrawn
119 Shaw St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear second storey cantilevered addition. Also, to alter the existing rear one-storey ancillary building (garage) by constructing a new cantilevered second storey laneway suite addition. There will be a total of two residential dwelling units (one unit occupying the main dwelling and one unit occupying the laneway suite).
250 m away · filed Jun 6, 2025 · Approved
897 Queen St W · Minor variance
To convert the existing three-storey mixed-use building into a rooming house containing 20 dwelling rooms and a restaurant use on the ground floor. There will be 6 dwelling rooms located on the ground floor, 11 dwelling rooms located on the second level, and 3 dwelling rooms on the third level of this building. The existing third storey residential dwelling unit will be demolished.
220 m away · filed Sep 29, 2024 · Application withdrawn
104 Massey St · Minor variance
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear two-storey cantilevered addition (to replace the existing one-storey addition), and a rear third storey addition (to replace the existing rear third storey dormer).
60 m away · filed Oct 5, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.