Toronto address · Ward 13, Toronto Centre
83 Charles St E
Charles Street Parkette
The City of Toronto has 4 building permits since 2017 (2 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Addition or alteration · Addition(s)
Proposal to construct a prefabricated modular protection, control and telecom building elevated on concrete piers.
Applied Aug 22, 2025 · issued Oct 1, 2025 · Permit 25 214752 BLD
- Permit issued
Plumbing · Backflow prevention devices (Water only)
Proposal to install 1 backflow prevention device and 1 hotwater tank in existing Hydro Substation.
Applied Feb 22, 2011 · issued Mar 15, 2011 · Permit 11 130767 PSA
- Closed (dormant)
Addition or alteration · Other
Install 6 lightning rods on existing roof of existing hydro transformer station.See BP01-133024(990) (old w24/new27)
Applied Aug 3, 2001 · issued Aug 9, 2001 · completed Jun 8, 2026 · Permit 01 165611 CMB
- Closed (dormant)
Addition or alteration · Addition(s)
Build addition on west elevation(5.8m2)(x8=$46.40) and build interior marinite partitions (333m2) (x3=$1001.40) of existing hydro transformer station. (old w24/new27)
Applied May 3, 2001 · issued May 15, 2001 · completed Jun 8, 2026 · Permit 01 133024 CMB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
69 storeys · 837 homes · Mixed use
70 m away · Site plan · Under review · filed May 30, 2022
- Approved
- Approved
50 storeys · 508 homes · Residential
90 m away · Site plan · Approved · filed Apr 26, 2022
- Under review
59 storeys · 656 homes · Mixed use
130 m away · Site plan · Under review · filed Apr 30, 2021
- Under appeal
69 storeys · 647 homes · Residential
140 m away · Rezoning · Under appeal · filed Jun 10, 2025
- Under review
11 storeys · 16 homes · Residential
180 m away · Site plan · Under review · filed Jul 5, 2024
Neighbours’ Committee of Adjustment files within 250 m
235 Bloor St E · Minor variance
210 m away · filed Aug 31, 2026 · Postponed
10 Huntley St · Consent
To obtain consent to sever the property into two lots to differentiate the retained lands (existing 20-storey apartment) from the development lands (proposed 45-storey residential building), and to create reciprocal access easements/rights-of-way.
250 m away · filed Mar 24, 2025 · Postponed
1 Mount Pleasant Rd · Minor variance
To permit the replacement of 4 new mechanical units.
170 m away · filed Feb 11, 2025 · Approved
62 Charles St E · Minor variance
To convert an existing three-storey non-residential building (originally constructed as two semi-detached dwellings), into a fourplex residential building with rear third storey rooftop terraces. This building has a Heritage designation.
190 m away · filed Jan 12, 2024 · Approved
66 Charles St E · Minor variance
To convert the existing two-and-one-half-storey detached residential (heritage) building into an apartment building by maintaining only the front portion of the existing building and constructing a 9-storey rear addition (and one mechanical penthouse level). Also, to construct a front ground floor porch and stairs, a front basement walkout, rear balconies on the second to fourth storeys, a front deck on the fourth storey, as well as front and rear balconies on the fifth to nineth storeys. There will be a total of 16 dwelling units within this apartment building.
170 m away · filed Sep 6, 2023 · Approved
55 Charles St E · Consent
To obtain consent to sever a lot (with a 50-storey residential building currently under construction) into 4 lots to separate the 100 freehold rental replacement units (located on levels 3 to 7), for ownership purposes. Also, to create easements/rights-of-way above and below-grade. There are no associated minor variance applications.
200 m away · filed Aug 31, 2023 · Approved
628 Church St · Minor variance
To alter an existing approved 47-storey mixed-use building by constructing three additional storeys for a total of 50-storeys. The number of residential units will increase from 403 units to 423 units.
140 m away · filed Mar 21, 2022 · Approved
600 Church St · Minor variance
Proposal to use the existing 2 storey building as mixed use (commercial/residential).
200 m away · filed Dec 15, 2021 · Application withdrawn
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.