Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

83 Third St

The City of Toronto has 4 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services

    Drain - includes a backwater valveProposal for multiple projects to an existing 1 storey SFD-detached dwelling. Scope of work includes a new 2nd floor addition, interior alterations, alter front porch with canopy and new rear deck.See also 21 107232 ZZC and 21 129097 MV.

    Applied Feb 9, 2022 · issued Feb 9, 2022 · completed Mar 14, 2022 · Permit 21 213893 DRN

    Closed
  • Heating and ventilation

    HVAC - Proposal for multiple projects to an existing 1 storey SFD-detached dwelling. Scope of work includes a new 2nd floor addition, interior alterations, alter front porch with canopy and new rear deck.See also 21 107232 ZZC and 21 129097 MV.

    Applied Sep 16, 2021 · issued Nov 3, 2021 · completed Jun 1, 2022 · Permit 21 213893 HVA

    Closed
  • Plumbing

    Plumbing - Proposal for multiple projects to an existing 1 storey SFD-detached dwelling. Scope of work includes a new 2nd floor addition, interior alterations, alter front porch with canopy and new rear deck.See also 21 107232 ZZC and 21 129097 MV.

    Applied Sep 16, 2021 · issued Nov 3, 2021 · completed Jun 1, 2022 · Permit 21 213893 PLB

    Closed
  • Small residential project · Multiple projects

    Proposal for multiple projects to an existing 1 storey SFD-detached dwelling. Scope of work includes a new 2nd floor addition, interior alterations, alter front porch with canopy and new rear deck.See also 21 107232 ZZC and 21 129097 MV.

    Applied Sep 16, 2021 · issued Nov 3, 2021 · completed Jun 1, 2022 · Permit 21 213893 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · NR addition

    To construct a second storey addition over the existing dwelling and a new rear deck.

    Decision: Approved (hearing Jun 24, 2021)

    Filed Mar 18, 2021 · File A0139/21EYK

    Closed

What’s planned nearby

Development sites within 500 m

  • 66 Third Street

    4 storeys · Not stated in the file

    160 m away · Site plan · Under review · filed Mar 13, 2026

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 145 Fourth St · Minor variance

    To construct a second storey addition above the existing dwelling.

    130 m away · filed Sep 12, 2025 · Approved

  • 140 Fourth St · Minor variance

    To construct a new ancillary building (detached garage) in the rear yard.

    150 m away · filed Apr 25, 2025 · Approved

  • 108 Fourth St · Minor variance

    To construct a second storey addition above the existing dwelling and a second storey rear addition.

    150 m away · filed Jun 10, 2024 · Approved

  • 168 Fifth St · Minor variance

    To construct a new detached dwelling with an attached garage.

    240 m away · filed Feb 5, 2024 · Approved

  • 95 Third St · Minor variance

    To construct a partial second-storey addition above the existing dwelling.

    50 m away · filed Jan 23, 2024 · Approved

  • 29 Second St · Minor variance

    To construct a new two-storey rear addition and a new rear deck.

    230 m away · filed Mar 8, 2023 · Approved

  • 168 Fifth St · Minor variance

    To construct a new detached dwelling.

    240 m away · filed Jan 3, 2023 · Approved

  • 172 Fifth St · Minor variance

    To construct a two-storey rear addition. A previous Committee of Adjustment application (A0626/21EYK) approved variances relating to floor space index, side yard setback and roof eaves.

    250 m away · filed Dec 1, 2022 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.