Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

85 Bertmount Ave

The City of Toronto has 1 building permit since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services · Back water valve (Sewer only)

    Proposal to install a backwater value

    Applied Feb 2, 2026 · issued Feb 2, 2026 · completed Feb 4, 2026 · Permit 26 111948 DRN

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 27 Brooklyn Ave · Minor variance

    160 m away · filed Aug 21, 2026 · Postponed

  • 58 Jones Ave · Minor variance

    To construct a new detached four-storey apartment building (containing seven residential dwelling units) with a front entrance with stairs, a side (north) covered entrance with stairs, a rear ground floor entrance with stairs and a partially enclosed waste storage in the front yard. Also, to construct a rear detached two-storey ancillary building (containing one laneway suite) with a rear (west) covered entrance and one visitor parking space, abutting the laneway. Further, to construct a rear one-storey detached ancillary building (containing 12 bicycle parking spaces). There will be a total…

    180 m away · filed Jun 25, 2026 · Approved

  • 12 Audley Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a rear ground floor addition and a rear deck with stairs.

    220 m away · filed Jun 17, 2026 · Approved

  • 99 Dagmar Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a complete third storey addition, and a rear three-storey addition with a front covered porch, a rear basement walkout, a rear ground floor deck with stairs, and two rear juliet balconies. Also, to construct a new rear one-storey ancillary building (one-car garage), abutting Dundas Street East. There will be a total of two residential dwelling units on this lot (one unit occupying the basement level, and one unit occupying the first, second, and third levels).

    210 m away · filed Jun 17, 2026 · Hearing scheduled

  • 64 Brooklyn Ave · Minor variance

    To alter the existing three-storey detached dwelling by constructing one, two, and three-storey additions along the entire portion of the south side wall (including a basement level, a front integral garage, an elevator and stairs, a rear walkout basement, and a rear second storey terrace).

    130 m away · filed Apr 23, 2026 · Approved

  • 45 Jones Ave · Minor variance

    To legalize and maintain the existing rear two-storey addition, including a basement extension below with a walkout, a rear second floor balcony (above the garage), and side (north) exterior staircases (one leading to the ground level and one leading to the second level), which was constructed without an authorized building permit.This addition will be abutting the existing one-storey detached ancillary building (garage), will not be accessible through the main portion of the dwelling and will have separate accesses to each level. There will be one residential dwelling unit on this lot.

    230 m away · filed Jul 22, 2025 · Refused

  • 14 Blong Ave · Minor variance

    To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear third storey addition with a balcony.

    190 m away · filed Apr 22, 2025 · Approved

  • 53 Bertmount Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition.

    100 m away · filed Apr 14, 2025 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.