The City of Toronto has 2 building permits since 2017 (1 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services · Back water valve (Sewer only)
Proposed Back Water Valve (Sewer only)
Applied May 21, 2020 · issued May 22, 2020 · completed Jun 15, 2020 · Permit 20 147274 DRN
- Permit issued
Small residential project · Porch
repair column on porch (8 m2)
Applied Oct 21, 2015 · issued Oct 22, 2015 · Permit 15 240595 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Consent · Other
To obtain consent for the technical severance of the property for the purpose of re-establishing the two lots which merged on title.
Decision: Approved (hearing Sep 26, 2019)
Filed Jun 28, 2019 · 1 new lot · File B0072/19TEY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
27 Brooklyn Ave · Minor variance
200 m away · filed Aug 21, 2026 · Postponed
99 Dagmar Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a complete third storey addition, and a rear three-storey addition with a front covered porch, a rear basement walkout, a rear ground floor deck with stairs, and two rear juliet balconies. Also, to construct a new rear one-storey ancillary building (one-car garage), abutting Dundas Street East. There will be a total of two residential dwelling units on this lot (one unit occupying the basement level, and one unit occupying the first, second, and third levels).
210 m away · filed Jun 17, 2026 · Hearing scheduled
12 Audley Ave · Minor variance
To alter the existing one-storey detached dwelling by constructing a rear ground floor addition and a rear deck with stairs.
130 m away · filed Jun 17, 2026 · Approved
64 Brooklyn Ave · Minor variance
To alter the existing three-storey detached dwelling by constructing one, two, and three-storey additions along the entire portion of the south side wall (including a basement level, a front integral garage, an elevator and stairs, a rear walkout basement, and a rear second storey terrace).
110 m away · filed Apr 23, 2026 · Approved
22 Galt Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a new rear one-storey ground floor addition, a deck with stairs and a rear basement walkout.
250 m away · filed Mar 5, 2026 · Approved
188 Pape Ave · Minor variance
To construct a new one-storey detached ancillary building (containing a two-car garage), in the rear yard, abutting the laneway.
210 m away · filed Mar 2, 2026 · Approved
188 Pape Ave · Minor variance
To alter the existing two-storey detached dwelling by reconstructing a side (south) basement walkout, and to construct a rear two-storey addition with basement (replaces the existing one-storey). There will be a total of two residential dwelling units on the lot (one unit occupying the main dwelling and one unit occupying the laneway suite proposed as of right/not part of this application). The existing rear detached garage will be demolished.
210 m away · filed Jun 5, 2025 · Approved
75 Badgerow Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a front covered porch with stairs.
190 m away · filed May 27, 2025 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.