Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 10, Spadina-Fort York

85 The Esplanade

The City of Toronto has 5 building permits since 2017 (2 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation · Alter: Boiler/Furnace/AC replacement

    Replacement of four boilers (end of service life) to new high efficiency boilers replacement of existing parking exhaust ventilation system with CO detection sysetm. ( The existing exhaust system consists of an exhaust fan).

    Applied May 31, 2023 · issued Jun 29, 2023 · Permit 23 154107 MSA

    Permit issued
  • Fire and security upgrade · Fire alarm

    Proposal to replace the existing fire alarm control panel in the existing apartment building.

    Applied Oct 4, 2022 · issued Nov 22, 2022 · completed Apr 7, 2023 · Permit 22 212740 FSU

    Closed
  • Plumbing

    Plumbing - Proposal to install a solar domestic hot water system in an existing building. Current use of building Senior Citzens Housing with office and retail.

    Applied Sep 20, 2010 · issued Oct 26, 2010 · completed Jun 8, 2026 · Permit 10 261183 PLB

    Closed (dormant)
  • Plumbing · Backflow prevention devices (Water only)

    Install 1 back flow prevention device.

    Applied Jun 4, 2009 · issued Jun 16, 2009 · completed Jun 8, 2026 · Permit 09 145496 PSA

    Closed (dormant)
  • Heating and ventilation

    HVAC - Interior alterations to various portions of building for structural changes. - Interior Alterations

    Applied Nov 26, 2004 · issued Dec 14, 2004 · Permit 04 195628 HVA

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 45 The Esplanade

    39 storeys · 630 homes · Mixed use

    140 m away · Site plan · Approved · filed Dec 29, 2021

    Approved
  • 49-51 Yonge Street

    60 storeys · 256 homes · Mixed use

    360 m away · Condominium · Under review · filed Nov 8, 2021

    Under review
  • 53-55 Yonge Street

    68 storeys · 836 homes · Residential

    370 m away · Rezoning · Under review · filed Oct 21, 2024

    Under review
  • 53-55 Yonge Street

    66 storeys · 511 homes · Mixed use

    370 m away · Site plan · Under review · filed Apr 27, 2022

    Under review
  • 175-185 King Street East

    46 storeys · 437 homes · Mixed use

    380 m away · Site plan · Approved · filed Aug 11, 2022

    Approved
  • 65 George Street and 187 King Street East

    17 storeys · Non-residential

    400 m away · Site plan · Under review · filed Apr 25, 2022

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 80 Front St E · Minor variance

    APPLICATION FILED IN ERROR - VARIANCE NOT REQUIREDTo legalize and maintain a pergola over a rooftop patio on the 9th floor of 80 Front St E.

    210 m away · filed Dec 12, 2019 · Withdrawn

  • 22 The Esplanade · Minor variance

    To modify the redevelopment proposal approved under Site-specific By-law 26-2007(OMB) for a mixed use development with two residential condominium towers and retail uses at grade by obstructing the required continuous weather protection feature through the construction of an outdoor patio associated with the existing eating establishment along The Esplanade frontage.

    190 m away · filed Dec 12, 2017 · Approved

Everything planned in Spadina-Fort York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.