Toronto address · Ward 10, Spadina-Fort York
85 The Esplanade
The City of Toronto has 5 building permits since 2017 (2 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Heating and ventilation · Alter: Boiler/Furnace/AC replacement
Replacement of four boilers (end of service life) to new high efficiency boilers replacement of existing parking exhaust ventilation system with CO detection sysetm. ( The existing exhaust system consists of an exhaust fan).
Applied May 31, 2023 · issued Jun 29, 2023 · Permit 23 154107 MSA
- Closed
Fire and security upgrade · Fire alarm
Proposal to replace the existing fire alarm control panel in the existing apartment building.
Applied Oct 4, 2022 · issued Nov 22, 2022 · completed Apr 7, 2023 · Permit 22 212740 FSU
- Closed (dormant)
Plumbing
Plumbing - Proposal to install a solar domestic hot water system in an existing building. Current use of building Senior Citzens Housing with office and retail.
Applied Sep 20, 2010 · issued Oct 26, 2010 · completed Jun 8, 2026 · Permit 10 261183 PLB
- Closed (dormant)
Plumbing · Backflow prevention devices (Water only)
Install 1 back flow prevention device.
Applied Jun 4, 2009 · issued Jun 16, 2009 · completed Jun 8, 2026 · Permit 09 145496 PSA
- Inspections under way
Heating and ventilation
HVAC - Interior alterations to various portions of building for structural changes. - Interior Alterations
Applied Nov 26, 2004 · issued Dec 14, 2004 · Permit 04 195628 HVA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
39 storeys · 630 homes · Mixed use
140 m away · Site plan · Approved · filed Dec 29, 2021
- Under review
60 storeys · 256 homes · Mixed use
360 m away · Condominium · Under review · filed Nov 8, 2021
- Under review
68 storeys · 836 homes · Residential
370 m away · Rezoning · Under review · filed Oct 21, 2024
- Under review
66 storeys · 511 homes · Mixed use
370 m away · Site plan · Under review · filed Apr 27, 2022
- Approved
46 storeys · 437 homes · Mixed use
380 m away · Site plan · Approved · filed Aug 11, 2022
- Under review
65 George Street and 187 King Street East
17 storeys · Non-residential
400 m away · Site plan · Under review · filed Apr 25, 2022
Neighbours’ Committee of Adjustment files within 250 m
80 Front St E · Minor variance
APPLICATION FILED IN ERROR - VARIANCE NOT REQUIREDTo legalize and maintain a pergola over a rooftop patio on the 9th floor of 80 Front St E.
210 m away · filed Dec 12, 2019 · Withdrawn
22 The Esplanade · Minor variance
To modify the redevelopment proposal approved under Site-specific By-law 26-2007(OMB) for a mixed use development with two residential condominium towers and retail uses at grade by obstructing the required continuous weather protection feature through the construction of an outdoor patio associated with the existing eating establishment along The Esplanade frontage.
190 m away · filed Dec 12, 2017 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.