Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

86 Albert Ave

The City of Toronto has 3 building permits since 2017 (1 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services · Back water valve (Sewer only)

    Proposal to install backwater valve for existing sfd

    Applied Sep 3, 2020 · issued Sep 11, 2020 · completed Sep 14, 2020 · Permit 20 189590 DRN

    Closed
  • Plumbing · Backflow prevention devices (Water only)

    To install 1 Backwater (outside) at the front yard of single family detached dwelling.

    Applied Mar 13, 2013 · issued Mar 14, 2013 · Permit 13 132508 PSA

    Inspections under way
  • Small residential project · Porch

    Demo existing porch & rebuild new.

    Applied Oct 24, 2001 · issued Oct 24, 2001 · completed Jun 8, 2026 · Permit 01 188805 BLD

    Closed (dormant)

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 47 Victoria St · Minor variance

    To construct a second storey addition above the existing dwelling and to create a new dwelling unit in the basement. The altered dwelling will be a duplex.

    210 m away · filed Apr 4, 2025 · Deferred

  • 85 Superior Ave · Minor variance

    To construct a two-storey front addition and a new covered front porch.

    160 m away · filed Dec 3, 2024 · Approved

  • 24 Stanley Ave · Minor variance

    To construct a rear sun room addition.

    220 m away · filed Sep 6, 2023 · Approved

  • 2 Audley St · Minor variance

    To construct a 27 and 23-storey mixed use building, connected by a shared 4 to 8-storey podium.

    240 m away · filed Jul 27, 2023 · Deferred

  • 83 Albert Ave · Minor variance

    To construct a third floor addition in order to accommodate two additional dwelling units that will create a total of 8 dwelling units within the existing dwelling.

    50 m away · filed May 5, 2023 · Deferred

  • 83 Superior Ave · Minor variance

    To construct a two-storey rear addition and a rear yard deck.

    170 m away · filed Jun 2, 2021 · Approved

  • 88 Burlington St · Minor variance

    To construct a new detached dwelling with an attached garage.

    100 m away · filed May 15, 2019 · Approved

  • 88 Burlington St · Minor variance

    To construct a new detached dwelling with an integral garage.

    100 m away · filed Nov 14, 2018 · Refused

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.