Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

86 Six Point Rd

The City of Toronto has 7 building permits since 2017 (4 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Multiple projects

    Revision #1: Second floor cantillever addition. (9m2)Changes to openings and cladding.2 rooftopunits, Change to plenum. Rooftop ductwork.Relocate washroom. Hot water tank to first floor. Sink. Proposal to construct interior alterations to main floor, second storey addition, demolition of rear 1.6m of building to provide more parking, and underpinning and underslab drainage.

    Applied Mar 22, 2019 · issued Apr 23, 2019 · Permit 18 122114 BLD (revision 01)

    Revision issued
  • Heating and ventilation

    Revision #1: Add 2 rootop units, change plenum.Rooftop ductwork. HVAC - Proposal to construct interior alterations to main floor, second storey addition, demolition of rear 1.6m of building to provide more parking, and underpinning and underslab drainage.

    Applied Mar 22, 2019 · issued Apr 23, 2019 · Permit 18 122114 HVA (revision 01)

    Revision issued
  • Plumbing

    Revision #1: Remove first floor shower. Relocate washroom. Hot water tank to first floor. Plumbing - Proposal to construct interior alterations to main floor, second storey addition, demolition of rear 1.6m of building to provide more parking, and underpinning and underslab drainage.

    Applied Mar 22, 2019 · issued Apr 23, 2019 · completed Sep 3, 2026 · Permit 18 122114 PLB (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Proposal to construct interior alterations to main floor, second storey addition, demolition of rear 1.6m of building to provide more parking, and underpinning and underslab drainage.

    Applied Feb 27, 2018 · issued Mar 29, 2018 · Permit 18 122114 HVA

    Inspections under way
  • Addition or alteration · Multiple projects

    Proposal to construct interior alterations to main floor, second storey addition, demolition of rear 1.6m of building to provide more parking, and underpinning and underslab drainage.

    Applied Feb 27, 2018 · issued Mar 29, 2018 · Permit 18 122114 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal to construct interior alterations to main floor, second storey addition, demolition of rear 1.6m of building to provide more parking, and underpinning and underslab drainage.

    Applied Feb 27, 2018 · issued Mar 29, 2018 · completed Sep 3, 2026 · Permit 18 122114 PLB

    Closed
  • Addition or alteration · Multiple projects

    Propose exterior alterations, structural and drainage upgrades, underpinning and demolition of rear 1.6m and front of building to provide more parking.

    Applied Dec 11, 2017 · issued Feb 7, 2018 · completed Sep 9, 2026 · Permit 17 273787 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · NR addition

    To convert a portion of the existing building into office space and to construct a second storey addition above the existing building.

    Decision: Approved (hearing Jan 11, 2018)

    Filed Oct 19, 2017 · File A0901/17EYK

    Closed

What’s planned nearby

Development sites within 500 m

  • 1138 Islington Avenue

    6 storeys · Residential

    250 m away · Rezoning · Approved · filed Sep 19, 2022

    Approved
  • 1040-1048 Islington Avenue

    10 storeys · 175 homes · Residential

    490 m away · Site plan · Under review · filed Apr 28, 2022

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 12 Chauncey Ave · Minor variance

    130 m away · filed Sep 11, 2026 · Postponed

  • 12 Chauncey Ave · Minor variance

    130 m away · filed Sep 11, 2026 · Postponed

  • 34 Chauncey Ave · Minor variance

    To construct an ancillary storage structure in the rear yard.

    200 m away · filed Jan 22, 2025 · Approved

  • 17 Chauncey Ave · Minor variance

    To permit a day nursery within an existing single family dwelling.

    80 m away · filed Dec 11, 2021 · Refused

  • 80 Advance Rd · Minor variance

    To permit a parking deficiency.

    220 m away · filed Oct 30, 2020 · Approved

  • 1084 Islington Ave · Consent

    To obtain consent to a lease for a term in excess of 21 years.

    190 m away · filed Jan 27, 2020 · Approved

  • 261 Bering Ave · Minor variance

    To construct a second floor rear addition with a mezazanine.

    230 m away · filed Feb 21, 2018 · Approved

  • 7 Cardigan Rd · Minor variance

    To construct a second storey addition above the existing dwelling and a one-storey west side addition.

    240 m away · filed Aug 15, 2017 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.