Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

88 Albert Ave

The City of Toronto has 6 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposal to construct a 1 storey addition with Rear Deck.

    Applied Jun 16, 2021 · issued Jul 23, 2021 · completed Jun 26, 2023 · Permit 21 171628 HVA

    Closed
  • Plumbing

    Plumbing - Proposal to construct a 1 storey addition with Rear Deck.

    Applied Jun 16, 2021 · issued Jul 23, 2021 · completed Jun 20, 2023 · Permit 21 171628 PLB

    Closed
  • Small residential project · Multiple projects

    Proposal for an on-storey rear addition, basement walkout, side yard and rear yard deck to an existing 2-storey detached SFD.

    Applied Jun 16, 2021 · issued Jul 23, 2021 · completed Jun 26, 2023 · Permit 21 171628 BLD

    Closed
  • Plumbing

    Plumbing - Interior alteration in basement to replace existing masonry piers with steel columns.

    Applied Jun 22, 2012 · issued Jun 29, 2012 · completed Sep 9, 2026 · Permit 12 184354 PLB

    Closed
  • Small residential project · Interior alterations

    Revision 01: basement underpining. including rough-in for plumbing fixtures.(Interior alteration in basement to replace existing masonry piers with steel columns.)

    Applied Jun 22, 2012 · issued Jun 29, 2012 · completed Sep 9, 2026 · Permit 12 184354 BLD (revision 01)

    Closed
  • Small residential project · Interior alterations

    Interior alteration in basement to replace existing masonry piers with steel columns.

    Applied May 31, 2012 · issued Jun 1, 2012 · completed Sep 9, 2026 · Permit 12 184354 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 47 Victoria St · Minor variance

    To construct a second storey addition above the existing dwelling and to create a new dwelling unit in the basement. The altered dwelling will be a duplex.

    220 m away · filed Apr 4, 2025 · Deferred

  • 85 Superior Ave · Minor variance

    To construct a two-storey front addition and a new covered front porch.

    170 m away · filed Dec 3, 2024 · Approved

  • 24 Stanley Ave · Minor variance

    To construct a rear sun room addition.

    230 m away · filed Sep 6, 2023 · Approved

  • 2 Audley St · Minor variance

    To construct a 27 and 23-storey mixed use building, connected by a shared 4 to 8-storey podium.

    220 m away · filed Jul 27, 2023 · Deferred

  • 83 Albert Ave · Minor variance

    To construct a third floor addition in order to accommodate two additional dwelling units that will create a total of 8 dwelling units within the existing dwelling.

    50 m away · filed May 5, 2023 · Deferred

  • 83 Superior Ave · Minor variance

    To construct a two-storey rear addition and a rear yard deck.

    180 m away · filed Jun 2, 2021 · Approved

  • 88 Burlington St · Minor variance

    To construct a new detached dwelling with an attached garage.

    90 m away · filed May 15, 2019 · Approved

  • 88 Burlington St · Minor variance

    To construct a new detached dwelling with an integral garage.

    90 m away · filed Nov 14, 2018 · Refused

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.