Toronto address · Ward 15, Don Valley West
88 Erskine Ave
The City of Toronto has 15 building permits since 2017 (12 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Addition or alteration · Garage Repair/Reconstruction
Hydrovault Repairs
Applied Jan 23, 2024 · issued Feb 20, 2024 · completed Apr 23, 2024 · Permit 24 107528 BLD
- Inspections under way
Addition or alteration · Interior alterations
Conversion of an old change room area into a 2-bedroom unit (top floor).
Applied May 30, 2019 · issued Feb 20, 2020 · Permit 19 162650 BLD
- Permit issued
Heating and ventilation
HVAC - Conversion of an old change room area into a 2-bedroom unit (top floor).
Applied May 30, 2019 · issued Feb 20, 2020 · Permit 19 162650 HVA
- Permit issued
Plumbing
Plumbing - Conversion of an old change room area into a 2-bedroom unit (top floor).
Applied May 30, 2019 · issued Feb 20, 2020 · Permit 19 162650 PLB
- Inspections under way
Addition or alteration · Interior alterations
Repair to the Residential amenity pool and gym area on the 27 to 28 floor 325sqm.
Applied Mar 9, 2016 · issued May 31, 2016 · Permit 16 125373 BLD
- Closed
Heating and ventilation
HVAC - Repair to the Residential amenity pool and gym area on the 27 to 28 floor 325sqm.
Applied Mar 9, 2016 · issued May 31, 2016 · completed Feb 16, 2017 · Permit 16 125373 HVA
- Inspections under way
Plumbing
Plumbing - Repair to the Residential amenity pool and gym area on the 27 to 28 floor 325sqm.
Applied Mar 9, 2016 · issued May 31, 2016 · Permit 16 125373 PLB
- Permit issued
Addition or alteration · Interior alterations
Underground basement tunnel connecting two residential apartment dwellings (77 & 80 Erskine Ave)
Applied Feb 12, 2016 · issued Apr 5, 2016 · Permit 16 116196 BLD
- Inspections under way
Heating and ventilation
HVAC - Underground basement tunnel connecting two residential apartment dwellings (77 & 80 Erskine Ave)
Applied Feb 12, 2016 · issued Apr 5, 2016 · Permit 16 116196 HVA
- Closed
Addition or alteration · Garage Repair/Reconstruction
Proposal for water proofing of the roof deck, and slab reconstruction of the P1 Level in the existing apartment building.
Applied Oct 20, 2015 · issued Nov 5, 2015 · completed Aug 10, 2017 · Permit 15 240069 BLD
- Revision issued
Plumbing
Revision # 01 - For Plumbing layout changes to the basement of the exsiting Apartment Building.Plumbing - Construct a 8 storey apartment building with 79 residential units
Applied Sep 18, 2015 · issued Dec 18, 2015 · Permit 14 174102 PLB (revision 01)
- Inspections under way
Drains and site services · Site service
Site services- Construct a 8 storey apartment building with 79 residential units
Applied Jun 30, 2014 · issued Feb 25, 2015 · Permit 14 174102 STS
Show 3 more permits
- Inspections under way
New building
Construct a 8 storey apartment building with 79 residential units and 1 level below grade amenity and common areas connecting to an existing building by an underground walkway.
Applied Jun 15, 2014 · issued Dec 22, 2015 · 79 homes added · Permit 14 174102 BLD
- Inspections under way
Plumbing
Plumbing - Construct a 8 storey apartment building with 79 residential units
Applied Jun 15, 2014 · issued May 11, 2015 · Permit 14 174102 PLB
- Inspections under way
Heating and ventilation
HVAC - Construct a 8 storey apartment building with 80 residential units. See 16.116196 for the tunnel
Applied Jun 15, 2014 · issued Dec 16, 2015 · Permit 14 174102 HVA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
- Under review
35 storeys · 377 homes · Residential
120 m away · Site plan · Under review · filed Sep 19, 2022
- Under review
31 storeys · 322 homes · Residential
150 m away · Site plan · Under review · filed Apr 6, 2022
- Under review
5 storeys · Not stated in the file
190 m away · Site plan · Under review · filed Feb 3, 2026
- Under review
39 storeys · 412 homes · Mixed use
210 m away · Site plan · Under review · filed Apr 8, 2022
- Under review
36 storeys · 86 homes · Not stated in the file
290 m away · Condominium · Under review · filed Oct 19, 2021
Neighbours’ Committee of Adjustment files within 250 m
241 Redpath Ave · Minor variance
To alter the development standards (as approved through Site-Specific By-law No. 82-2023(OLT)) for the proposed 43-storey apartment building, to increase the gross floor area, building height, and number of storeys, and to permit encroachments into the required side yard setbacks and encroachments above the maximum building height, as well as to reduce the required amenity space and parking space rates. Please note a previous Minor Variance application (File No. A0163/25NY) for the subject property was before the Committee of Adjustment on June 12, 2025, which was approved on condition.
200 m away · filed Jan 19, 2026 · Approved
220 Redpath Ave · Minor variance
To convert the existing amenity space into apartments within the existing building.
180 m away · filed Jun 20, 2025 · Deferred
241 Redpath Ave · Minor variance
To increase gross floor area, encroachments to side yard setback, building height and number of storeys, and reduce parking space and the amenity space per dwelling.
200 m away · filed Apr 9, 2025 · Approved
40 Broadway Ave · Minor variance
To permit an additional 4 storeys on top of the previously approved 39-storey tower. Cross-reference Site Plan Control Application 22 132571 NNY 15 SA. NOTE: This application was previously deferred at the Committee of Adjustment hearing on January 23, 2025.
200 m away · filed Jul 18, 2023 · Approved
200 Keewatin Ave · Minor variance
Proposal to expand underground parking through the addition of tandem parking spaces.
250 m away · filed May 26, 2023 · Approved
100 Broadway Ave · Minor variance
Proposal to seek relief regarding building height, number of dwellings, floor area from previously approved by-law
250 m away · filed Jan 31, 2023 · Approved
40 Broadway Ave · Consent
To obtain consent to sever the property into two lots and create various easements/rights-of way.
200 m away · filed Nov 18, 2022 · Tentatively scheduled
37 Sherwood Ave · Minor variance
To construct a shed/cabana in the rear yard.
200 m away · filed Sep 23, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.