Toronto address · Ward 10, Spadina-Fort York
885 Dundas St W
The City of Toronto has 7 building permits since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Under review
Addition or alteration · Other
Proposal for enclosed structure (enclosed patio) on public boulevard.
Applied Jun 5, 2025 · Permit 25 172246 BLD
- Closed
Addition or alteration · Multiple projects
Revision 01. TO UPDATE AS BUILT MECHANICAL CHANGES AND RELOCATION OF MAKE-UP AIR UNITTO NEW ROOF.Renovation of existing restaurant including mechanical system with exterior mechanical equipment platform. Interior renovations of the existing two level apartment building with 32 sq meters of addition on second storey and recladding of building exterior finishes.
Applied Feb 11, 2022 · issued Mar 18, 2022 · completed Sep 16, 2024 · Permit 21 130173 BLD (revision 01)
- Closed
Heating and ventilation
Revision 01. TO UPDATE AS BUILT MECHANICAL CHANGES AND RELOCATION OF MAKE-UP AIR UNIT TO NEW ROOF.HVAC - Renovation of existing restaurant including mechanical system with exterior mechanical equipment platform. Interior renovations of the existing two level apartment building with 32 sq meters of addition on second storey and recladding of building exterior finishes.
Applied Feb 11, 2022 · issued Mar 18, 2022 · completed Jul 4, 2022 · Permit 21 130173 HVA (revision 01)
- Closed
Plumbing
Revision 01. TO UPDATE AS BUILT MECHANICAL CHANGES AND RELOCATION OF MAKE-UP AIR UNIT TO NEW ROOF.Plumbing - Renovation of existing restaurant including mechanical system with exterior mechanical equipment platform. Interior renovations of the existing two level apartment building with 32 sq meters of addition on second storey and recladding of building exterior finishes.
Applied Feb 11, 2022 · issued Mar 18, 2022 · completed Jul 26, 2023 · Permit 21 130173 PLB (revision 01)
- Closed
Heating and ventilation
HVAC - Renovation of existing restaurant including mechanical system with exterior mechanical equipment platform. Interior renovations of the existing two level apartment building with 32 sq meters of addition on second storey and recladding of building exterior finishes.
Applied Mar 22, 2021 · issued May 12, 2021 · completed Jul 4, 2022 · Permit 21 130173 HVA
- Closed
Plumbing
Plumbing - Renovation of existing restaurant including mechanical system with exterior mechanical equipment platform. Interior renovations of the existing two level apartment building with 32 sq meters of addition on second storey and recladding of building exterior finishes.
Applied Mar 22, 2021 · issued May 12, 2021 · completed Jul 26, 2023 · Permit 21 130173 PLB
- Closed
Addition or alteration · Multiple projects
Renovation of existing restaurant including mechanical system with exterior mechanical equipment platform. Interior renovations of the existing two level apartment building with 32 sq meters of addition on second storey and recladding of building exterior finishes.
Applied Mar 22, 2021 · issued May 6, 2021 · completed Sep 16, 2024 · Permit 21 130173 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
848 Dundas St W · Minor variance
To convert the basement and ground floor of the exsiting two-storey mixed-use building into a restaurant use and the existing second floor rooftop into a rooftop patio. Also, to construct a rear basement addition and a rear one-storey addition with a deck and rooftop patio above. The rooftop patios will be used by the restaurant.
140 m away · filed Feb 11, 2026 · Postponed
119 Bellwoods Ave · Minor variance
To alter the existing rear one-storey ancillary building (detached garage) by constructing a complete second storey addition (cantilevered on the west side with a balcony), for one laneway suite. There will be a total of two residential dwelling units on this lot (one unit occupying the main dwelling and one unit occupying the ancillary building). The existing parking space, within the ancillary building, will be maintained.
180 m away · filed Sep 16, 2025 · Approved
177 Manning Ave · Minor variance
To construct a one-storey ancillary building (detached garage) in the rear yard, abutting the laneway.
110 m away · filed Jun 25, 2025 · Approved
113 Bellwoods Ave · Minor variance
To permit the front basement walkout of the existing two-storey townhouse dwelling, which is currently under construction (under Building Permit 20 24 174134 BLD). The existing rear one-storey ancillary building (detached garage) will be demolished.
190 m away · filed Apr 17, 2025 · Approved
181 Manning Ave · Minor variance
To construct a new two-storey ancillary building (containing one parking space on the ground level, and one laneway suite on the second level) with a cantilevered second storey, located in the rear yard of the property, abutting the laneway. There will be a total of two residential dwelling units on this lot (one unit within the main dwelling and one unit within the ancillary building).
100 m away · filed Apr 17, 2025 · Approved
176 Manning Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a complete third storey addition with a front balcony, and a front basement walk out.
90 m away · filed Aug 29, 2024 · Approved
122 Bellwoods Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a one-storey rear ground level addition (at the southwest portion of the dwelling) with an enlarged rear second floor rooftop balcony (above the ground level addition), and a rear ground level deck with stairs. The existing rear deck and stairs will be demolished.
180 m away · filed Feb 28, 2024 · Approved
135 Gore Vale Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a complete third storey addition with a front third storey balcony. The existing canopy over the front ground floor porch will also be replaced.
170 m away · filed Jan 25, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.