Toronto address · Ward 3, Etobicoke-Lakeshore
887 Kipling Ave
The City of Toronto has 5 building permits since 2017 (3 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Cancelled
Designated structure · Sign building permit related
To erect and display one illuminated wall sign displaying static copy on the first storey of the westerly elevation measuring 4.88 m by 0.91 m at a height of 3.65 m. **JENCO CANADA LED**
Applied Jun 26, 2017 · completed Sep 28, 2021 · Permit 17 187112 DST
- Cancelled
Plumbing · Backflow prevention devices (Water only)
Install one backflow prevention device.
Applied Dec 5, 2016 · issued Dec 15, 2016 · completed Oct 9, 2025 · Permit 16 260478 PSA
- Inspections under way
Plumbing
Plumbing - Alterations to an existing industrial building including changes to front elevation, new washroom, new roof support roof repairs, mezz addition 32.69m2 etc. No retail, office area under 50 percent of the industrial contractors storage/warehouse use.Remove existing mezzanine and add new larger mezzanine.Contractors office.
Applied Oct 26, 2015 · issued Nov 18, 2015 · Permit 15 241252 PLB
- Inspections under way
Addition or alteration · Multiple projects
Alterations to an existing industrial building including changes to front elevation, new washroom, new roof support roof repairs, mezz addition 32.69m2 etc. No retail, office area under 50 percent of the industrial contractors storage/warehouse use.Remove existing mezzanine and add new larger mezzanine.Contractors office.
Applied Oct 22, 2015 · issued Nov 12, 2015 · Permit 15 241252 BLD
- Inspections under way
Heating and ventilation
HVAC - Alterations to an existing industrial building including changes to front elevation, new washroom, new roof support roof repairs etc. No retail, office area under 50 percent of the industrial contractors storage/warehouse use.
Applied Oct 22, 2015 · issued Nov 18, 2015 · Permit 15 241252 HVA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
42 storeys · 1,340 homes · Mixed use
410 m away · Site plan · Under review · filed Mar 28, 2023
- Approved
3699-3741 Bloor Street West, 5207 Dundas Street West and 925 Kipling Avenue
29 storeys · 217 homes · Mixed use
420 m away · Site plan · Approved · filed Oct 4, 2022
- Approved
552 homes · Residential
470 m away · Condominium · Approved · filed Aug 7, 2025
Neighbours’ Committee of Adjustment files within 250 m
891 Kipling Ave · Consent
To obtain consent to the technical severance of the property for the purpose of re-establishing two separate lots.
30 m away · filed Jun 11, 2026 · Hearing scheduled
899 Kipling Ave · Minor variance
To legalize and to maintain a one-storey rear addition and to construct a one-storey addition along the south side of the building.
100 m away · filed Feb 28, 2024 · Deferred
891 Kipling Ave · Minor variance
To maintain the existing building.
30 m away · filed Sep 2, 2022 · Approved
889 Kipling Ave · Minor variance
To maintain the existing building.
10 m away · filed Sep 2, 2022 · Approved
889 Kipling Ave · Consent
To obtain consent to the technical severance of the property for the purpose of re-establishing two separate lots.
10 m away · filed Feb 3, 2021 · Approved
113 Judge Rd · Minor variance
To construct a detached garage in the rear yard.
210 m away · filed Sep 23, 2019 · Approved
889 Kipling Ave · Consent
To obtain consent to the technical severance of the property for the purpose of re-establishing two separate lots.
10 m away · filed Nov 7, 2018 · Application withdrawn
122 Judge Rd · Minor variance
To convert the existing parking garage into office space.
220 m away · filed Jan 27, 2017 · Refused
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.