Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

887 Kipling Ave

The City of Toronto has 5 building permits since 2017 (3 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Designated structure · Sign building permit related

    To erect and display one illuminated wall sign displaying static copy on the first storey of the westerly elevation measuring 4.88 m by 0.91 m at a height of 3.65 m. **JENCO CANADA LED**

    Applied Jun 26, 2017 · completed Sep 28, 2021 · Permit 17 187112 DST

    Cancelled
  • Plumbing · Backflow prevention devices (Water only)

    Install one backflow prevention device.

    Applied Dec 5, 2016 · issued Dec 15, 2016 · completed Oct 9, 2025 · Permit 16 260478 PSA

    Cancelled
  • Plumbing

    Plumbing - Alterations to an existing industrial building including changes to front elevation, new washroom, new roof support roof repairs, mezz addition 32.69m2 etc. No retail, office area under 50 percent of the industrial contractors storage/warehouse use.Remove existing mezzanine and add new larger mezzanine.Contractors office.

    Applied Oct 26, 2015 · issued Nov 18, 2015 · Permit 15 241252 PLB

    Inspections under way
  • Addition or alteration · Multiple projects

    Alterations to an existing industrial building including changes to front elevation, new washroom, new roof support roof repairs, mezz addition 32.69m2 etc. No retail, office area under 50 percent of the industrial contractors storage/warehouse use.Remove existing mezzanine and add new larger mezzanine.Contractors office.

    Applied Oct 22, 2015 · issued Nov 12, 2015 · Permit 15 241252 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Alterations to an existing industrial building including changes to front elevation, new washroom, new roof support roof repairs etc. No retail, office area under 50 percent of the industrial contractors storage/warehouse use.

    Applied Oct 22, 2015 · issued Nov 18, 2015 · Permit 15 241252 HVA

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 891 Kipling Ave · Consent

    To obtain consent to the technical severance of the property for the purpose of re-establishing two separate lots.

    30 m away · filed Jun 11, 2026 · Hearing scheduled

  • 899 Kipling Ave · Minor variance

    To legalize and to maintain a one-storey rear addition and to construct a one-storey addition along the south side of the building.

    100 m away · filed Feb 28, 2024 · Deferred

  • 891 Kipling Ave · Minor variance

    To maintain the existing building.

    30 m away · filed Sep 2, 2022 · Approved

  • 889 Kipling Ave · Minor variance

    To maintain the existing building.

    10 m away · filed Sep 2, 2022 · Approved

  • 889 Kipling Ave · Consent

    To obtain consent to the technical severance of the property for the purpose of re-establishing two separate lots.

    10 m away · filed Feb 3, 2021 · Approved

  • 113 Judge Rd · Minor variance

    To construct a detached garage in the rear yard.

    210 m away · filed Sep 23, 2019 · Approved

  • 889 Kipling Ave · Consent

    To obtain consent to the technical severance of the property for the purpose of re-establishing two separate lots.

    10 m away · filed Nov 7, 2018 · Application withdrawn

  • 122 Judge Rd · Minor variance

    To convert the existing parking garage into office space.

    220 m away · filed Jan 27, 2017 · Refused

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.