Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

89 Queen St E

The City of Toronto has 4 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Interior alterations

    Changes to basement floor layout. Proposal for interior alterations to unit 81 of an existing multi-unit building. Tenant - "Downtown Camera"

    Applied Oct 30, 2018 · issued Dec 12, 2018 · completed Jun 12, 2019 · Permit 18 188434 BLD (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to unit 81 of an existing multi-unit building. Tenant - "Downtown Camera"

    Applied Oct 30, 2018 · issued Nov 20, 2018 · completed May 7, 2019 · Permit 18 188434 HVA

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations to unit 81 of an existing multi-unit building. Tenant - "Downtown Camera"

    Applied Oct 30, 2018 · issued Nov 20, 2018 · completed May 16, 2019 · Permit 18 188434 PLB

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to unit 81 of an existing multi-unit building. Tenant - "Downtown Camera"

    Applied Jul 4, 2018 · issued Sep 18, 2018 · completed Jun 12, 2019 · Permit 18 188434 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 30 Bond St · Minor variance

    To alter the existing public hospital (St. Michael's Hospital, bounded by Shuter Street, Bond Street, Queen Street East, and Victoria Street) by installing an air handling unit (AHU) on a portion of the roof (Donnelly Wing).

    220 m away · filed Nov 14, 2025 · Approved

  • 134 Jarvis St · Minor variance

    To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.

    170 m away · filed Sep 4, 2025 · Approved

  • 89 Church St · Minor variance

    To permit a reduction in the number of required resident parking spaces and nine obstructed parking spaces, on-site.

    110 m away · filed Nov 4, 2024 · Approved

  • 90 Queen St E · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-laws 218-2021 and 219-2021), for a new 34-storey mixed-use building (which is currently under construction), by reducing the minimum number of vehicular parking spaces. There will be a total of 369 residential dwelling units on this lot.

    90 m away · filed Aug 19, 2024 · Approved

  • 88 Queen St E · Consent

    To obtain consent to a strata severance and to create various easements/rights-of-ways within a 52-storey mixed-use redevelopment currently under construction.

    50 m away · filed Jan 26, 2024 · Approved

  • 30 Mutual St · Consent

    To obtain consent to sever portions of land (a below grade strata) for the purpose of lot additions and to create various easements/rights-of-way. This application will allow for the readjustment of the lot boundaries and easements/rights-of-way (below grade) between this property and the adjacent property to the south (municipally known as 88 Queen Street East), which were originally created from one parcel and were severed under Decision Number B0015/19TEY.

    120 m away · filed Dec 11, 2023 · Approved

  • 88 Queen St E · Consent

    To obtain consent to sever portions of land (a below grade strata) for the purpose of lot additions and to create various easements/rights-of-way. This application will allow for the readjustment of the lot boundaries and easements/rights-of-way (below grade) between this property and the adjacent property to the north (municipally known as 30 Mutual Street & 25 Dalhousie Street), which were originally created from one parcel and were severed under Decision Number B0015/19TEY.

    50 m away · filed Oct 16, 2023 · Approved

  • 88 Queen St E · Minor variance

    To permit the increase of residential dwelling units by constructing an additional floor above the current maximum permitted building height of the 51-storey mixed-use building, currently under construction. There will be a total of 587 dwelling units provided.

    50 m away · filed Apr 17, 2023 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.