Toronto address · Ward 9, Davenport
893 Dovercourt Rd
The City of Toronto has 2 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Underpinning
Construct bench footing and underpinning (not finishing basement with this application)
Applied May 2, 2016 · issued May 3, 2016 · completed May 18, 2021 · Permit 16 149024 BLD
- Closed
Drains and site services
Drain - floor drain, backwater valve and sump pumpConstruct bench footing and underpinning (not finishing basement with this application)
Applied May 2, 2016 · issued May 3, 2016 · completed May 18, 2021 · Permit 16 149024 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
- Approved
Neighbours’ Committee of Adjustment files within 250 m
800 Dovercourt Rd · Consent
To obtain consent for the technical severance of the property for the purpose of re-establishing two residential lots which merged on title.
240 m away · filed Jul 13, 2026 · Hearing scheduled
975 Dovercourt Rd · Minor variance
To convert the existing two-storey mixed-use building into a residential building (fourplex) by constructing a rear two-storey addition with a ground floor deck and stairs, and second and third storey balconies. Also, to construct a complete third storey addition. In addition, to construct a two-storey ancillary building to contain one garden suite. There will be a total of five residential dwelling units on this lot (four dwelling units within the main house and one dwelling unit within the ancillary building).
200 m away · filed Jan 20, 2025 · Deferred
431 Concord Ave · Minor variance
To alter the existing one-storey ancillary building (detached garage abutting the laneway) by constructing a second storey addition (to contain one laneway suite that will occupy both levels). There will be a total of four residential dwelling units on this lot (three units within the main dwelling and one unit within the ancillary building).
200 m away · filed Sep 20, 2024 · Refused
301 Delaware Ave · Minor variance
To permit the existing rear third storey addition, which was constructed without an authorized building permit.
130 m away · filed May 2, 2024 · Approved
205 Westmoreland Ave · Minor variance
To convert the existing two-and-one-half-storey semi-detached dwelling into a duplex by constructing a rear two-storey addition, a rear ground floor deck, a covered front porch with a second storey balcony. Also, to construct a new two-storey ancillary building (one car lift from a basement level and one laneway suite with a second storey balcony), in the rear yard, abutting the laneway. There will be a total of three residential dwelling units on this lot (two units within the main dwelling and one unit within the ancillary building).
220 m away · filed Apr 2, 2024 · Approved
386 Concord Ave · Minor variance
To construct a new two-storey laneway suite.
180 m away · filed Jan 26, 2024 · Approved
216 Westmoreland Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear third storey addition with a rear third storey deck.
250 m away · filed Nov 16, 2023 · Approved
297 Delaware Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling (currently under construction) by converting it into a duplex dwelling (for two residential dwelling units). Also, to construct a rear third storey addition (to convert a portion of the rear third storey terrace into habitable space) and a front basement walkout entrance for the dwelling unit within the basement.
140 m away · filed Jul 28, 2023 · Refused
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.