Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

9 Cardigan Rd

The City of Toronto has 5 building permits since 2017 (5 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    Revision: underpinning of basement, new basement layout and replacement of ex door and window at rear addition

    Applied Aug 29, 2025 · issued Sep 16, 2025 · Permit 25 110772 BLD (revision 01)

    Revision issued
  • Small residential project · Multiple projects

    Proposal for addition, interior alterations, second suite in the basement (converting to duplex)

    Applied Jan 30, 2025 · issued May 16, 2025 · 2 homes added · Permit 25 110772 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal for addition, interior alterations, second suite in the basement.

    Applied Jan 30, 2025 · issued May 16, 2025 · Permit 25 110772 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal for addition, interior alterations, second suite in the basement.

    Applied Jan 30, 2025 · issued May 16, 2025 · Permit 25 110772 HVA

    Inspections under way
  • Drains and site services

    Drain - Proposal for addition, interior alterations, second suite in the basement.

    Applied Jan 30, 2025 · issued May 16, 2025 · Permit 25 110772 DRN

    Permit issued

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To construct a partial two-storey west side addition, a complete second storey addition above the existing dwelling, a covered front porch, and a covered deck in the rear yard. The altered building will be a duplex.

    Decision: Approved (hearing Aug 29, 2024)

    Filed Jul 8, 2024 · File A0290/24EYK

    Closed

What’s planned nearby

Development sites within 500 m

  • 1138 Islington Avenue

    6 storeys · Residential

    280 m away · Rezoning · Approved · filed Sep 19, 2022

    Approved
  • 1040-1048 Islington Avenue

    10 storeys · 175 homes · Residential

    480 m away · Site plan · Under review · filed Apr 28, 2022

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 11 Stockbridge Ave · Minor variance

    To contrsuct a second storey addition above the existing dwelling, a two-storey south side addition and a new covered rear yard deck.

    210 m away · filed May 6, 2026 · Approved

  • 1081 Islington Ave · Minor variance

    150 m away · filed Feb 23, 2026 · Application withdrawn

  • 1081 Islington Ave · Minor variance

    150 m away · filed Feb 23, 2026 · Application withdrawn

  • 1081 Islington Ave · Consent

    150 m away · filed Feb 23, 2026 · Application withdrawn

  • 134 Lothian Ave · Minor variance

    To construct a new detached dwelling with an attached garage.

    180 m away · filed Nov 21, 2024 · Approved

  • 115 Lothian Ave · Minor variance

    To construct a second storey addition.

    180 m away · filed Nov 7, 2024 · Approved

  • 142 Lothian Ave · Minor variance

    To construct a new detached dwelling with an attached garage.

    230 m away · filed Jul 19, 2023 · Approved

  • 18 Stockbridge Ave · Minor variance

    To construct a first floor north side yard addition, a second storey addition to the existing dwelling and interior alterations.

    200 m away · filed Apr 11, 2022 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.